IP Library Granted Patent US 12,621,859
Granted Patent B2
US 12,621,859 · App. 18/282,064 · Granted May 5, 2026

User equipment and method for frame-based equipment operation in an unlicensed band

Inventors: Hai-Han Wang (Taipei, TW); Chia-Hsin Lai (Taipei, TW)
Assignee: SHARP KABUSHIKI KAISHA
H04W74/006H04W72/1273H04W72/232H04W74/0808
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,621,859
App. No.
18/282,064
Granted
May 5, 2026
Kind
B2
Abstract

A UE and a method for FBE operation in an unlicensed band are provided. The method receives DCI scheduling a PUSCH and indicating that an initiator of a CO of a FFP for the scheduled PUSCH is the UE. The method initiates the CO by transmitting a configured PUSCH within the CO when a DL signal has not been detected within a second FFP before a start time of the configured PUSCH, wherein the scheduled PUSCH is immediately after the configured PUSCH. The method transmits the scheduled PUSCH within the CO after receiving the DCI. The start time of the configured PUSCH is aligned with a start time of the FFP, an end time of the configured PUSCH is before start times of idle periods of both FFPs, and the second FFP overlaps the FFP and is used when the BS operates as an initiating device for the FBE operation.

Claims (41)

1 . A method for performing, by a user equipment (UE), a frame-based equipment (FBE) operation in an unlicensed band, the method comprising:

receiving, from a base station (BS), downlink control information (DCI) that schedules a physical uplink shared channel (PUSCH) and that indicates that an initiator of a channel occupancy (CO) of a first fixed frame period (FFP) for the scheduled PUSCH is the UE;

initiating the CO of the first FFP by transmitting, to the BS, a configured PUSCH within the CO of the first FFP after determining that a downlink (DL) signal has not been detected within a second FFP before a start time of the configured PUSCH, the scheduled PUSCH being immediately after the configured PUSCH; and

transmitting, to the BS, the scheduled PUSCH within the CO of the first FFP after receiving the DCI, wherein:

the start time of the configured PUSCH is aligned with a start time of the first FFP,

an end time of the configured PUSCH is before a start time of an idle period of the first FFP and a start time of an idle period of the second FFP, and

the second FFP overlaps the first FFP and is used when the BS operates as an initiating device for the FBE operation.

2 . The method of claim 1 , wherein the end time of the configured PUSCH and a start time of the scheduled PUSCH are in consecutive symbols.

3 . The method of claim 1 , further comprising:

determining whether a channel of the unlicensed band is clear by performing a clear channel assessment (CCA) on the channel, wherein

transmitting the configured PUSCH to the BS comprises transmitting the configured PUSCH on the channel after determining that the channel is clear.

4 . The method of claim 1 , further comprising:

receiving, from the BS, a first parameter indicating a first periodicity and a starting offset of the first FFP; and

receiving, from the BS, a second parameter indicating a second periodicity of the second FFP.

5 . A user equipment (UE) for performing a frame-based equipment (FBE) operation in an unlicensed band, the UE comprising:

at least one processor; and

at least one non-transitory computer-readable medium coupled to the at least one processor and storing one or more computer-executable instructions that, when executed by the at least one processor, cause the UE to:

receive, from a base station (BS), downlink control information (DCI) that schedules a physical uplink shared channel (PUSCH) and that indicates that an initiator of a channel occupancy (CO) of a first fixed frame period (FFP) for the scheduled PUSCH is the UE;

initiate the CO of the first FFP by transmitting, to the BS, a configured PUSCH within the CO of the first FFP after determining that a downlink (DL) signal has not been detected within a second FFP before a start time of the configured PUSCH, the scheduled PUSCH being immediately after the configured PUSCH; and

transmit, to the BS, the scheduled PUSCH within the CO of the first FFP after receiving the DCI, wherein:

the start time of the configured PUSCH is aligned with a start time of the first FFP,

an end time of the configured PUSCH is before a start time of an idle period of the first FFP and a start time of an idle period of the second FFP, and

the second FFP overlaps the first FFP and is used when the BS operates as an initiating device for the FBE operation.

6 . A communication system for a frame-based equipment (FBE) operation in an unlicensed band, the communication system comprising a base station (BS) and a user equipment (UE), wherein:

the BS is configured to:

set an indication indicating an initiator of a channel occupancy (CO) of a first fixed frame period (FFP) for a physical uplink shared channel (PUSCH) is the UE,

transmit, to the UE, downlink control information (DCI) to schedule the PUSCH and to indicate the indication, and

disable transmitting, to the UE, a downlink (DL) signal within a second FFP before a start time of a configured PUSCH, and

the UE is configured to:

initiate the CO of the first FFP by transmitting, to the BS, the configured PUSCH within the CO of the first FFP after determining that the DL signal has not been detected within the second FFP before the start time of the configured PUSCH, the scheduled PUSCH being immediately after the configured PUSCH, and

transmit, to the BS, the scheduled PUSCH within the CO of the first FFP after receiving the DCI, wherein:

the start time of the configured PUSCH is aligned with a start time of the first FFP,

an end time of the configured PUSCH is before a start time of an idle period of the first FFP and a start time of an idle period of the second FFP, and

the second FFP overlaps the first FFP and is used when the BS operates as an initiating device for the FBE operation.

7 . The communication system of claim 6 , wherein the end time of the configured PUSCH and a start time of the scheduled PUSCH are in consecutive symbols.

8 . The communication system of claim 6 , wherein the UE is further configured to:

determine whether a channel of the unlicensed band is clear by performing a clear channel assessment (CCA) on the channel, wherein

transmitting the configured PUSCH to the BS comprises transmitting the configured PUSCH on the channel after determining that the channel is clear.

9 . The communication system of claim 6 , wherein the BS is further configured to:

transmit, to the UE, a first parameter indicating a first periodicity and a starting offset of the first FFP, and

transmit, to the UE, a second parameter indicating a second periodicity of the second FFP.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2024
From: FG INNOVATION COMPANY LIMITED
To: SHARP KABUSHIKI KAISHA
Reel/Frame 069028/0473 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 14, 2023
From: WANG, HAI-HAN; LAI, CHIA-HSIN
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 064903/0450 →
Continuity (3)
Provisional Application 63171961 · Apr 7, 2021
Provisional Application 63171953 · Apr 7, 2021
Related Publication 20240306189A1 · Sep 12, 2024
References Cited (21)
US 20200037354A1 · Li · 2020 [cited by examiner]
US 20200154471A1 · Sun · 2020 [cited by examiner]
US 20200305191A1 · Moon et al. · 2020 [cited by applicant]
US 20200351919A1 · Oh et al. · 2020 [cited by applicant]
US 20200396767A1 · Talarico · 2020 [cited by examiner]
US 20200404688A1 · Park · 2020 [cited by examiner]
US 20210084683A1 · Li · 2021 [cited by examiner]
US 20210298072A1 · Oh · 2021 [cited by examiner]
US 20210360421A1 · Wang · 2021 [cited by examiner]
US 20220159723A1 · Jiang · 2022 [cited by applicant]
US 20230262691A1 · Fu · 2023 [cited by examiner]
US 20230284261A1 · Xu · 2023 [cited by examiner]
US 20230354275A1 · Moon · 2023 [cited by examiner]
CN 110856180A · 2020 [cited by applicant]
CN 111800887A · 2020 [cited by applicant]
Qualcomm Incorporated, “uplink enhancements for URLLC in unlicensed controlled environments”, R1-2006801, 3GPP TSG-RAN WG1 Meeting #102-e; e-Meeting, Aug. 17-28, 2020(Aug. 28, 2020). [cited by applicant]
Moderator (Ericsson), “Summary#6—URLLC/IIoT operation on Unlicensed Band”, R1-2102175, 3GPP TSG RAN WG1 Meeting #104-e; E-meeting, Jan. 25-Feb. 5, 2021(Feb. 5, 2021). [cited by applicant]
ETSI EN 301 893 V2.1.1 (May 2017); 5 GHz RLAN; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU. [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical channels and modulation (Release 16). 3GPP TS 38.211 V16.0.0 (Dec. 2019). [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Requirements for support of radio resource management (Release 16). 3GPP TS 38.133 V16.0.0 (Jun. 2019). [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 16). 3GPP TS 38.331 V16.0.0 (Mar. 2020). [cited by applicant]