IP Library Patent Application 18342487
Patent Application
App. No. 18/342,487

CAPTURING MOST SEVERE FAILURE REGIONS AROUND BOREHOLE IN ANALYTICAL POROELASTIC ANALYSIS

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
18/342,487
Abstract

A method for performing a borehole operation is disclosed. The method includes determining a characteristic diffusion time that corresponds to an undrained response period or a non-monotonic pore pressure dissipation phase of a porous medium surrounding a borehole, determining, based on a pre-determined failure criterion, a critical time of the borehole that corresponds to when a failure of the porous medium occurs within the characteristic diffusion time, identifying a failure region of the failure occurring at the critical time of the borehole, and performing, based on at least the identified failure region, the borehole operation.

Claims (67)

1 . A method for performing a borehole operation, comprising:

determining a characteristic diffusion time that corresponds to an undrained response period or a non-monotonic pore pressure dissipation phase of a porous medium surrounding a borehole;

determining, based on a pre-determined failure criterion, a critical time of the borehole that corresponds to when a failure of the porous medium occurs within the characteristic diffusion time;

identifying a failure region of the failure occurring at the critical time of the borehole; and

performing, based on at least the identified failure region, the borehole operation.

2 . The method of claim 1 ,

wherein the borehole is an existing borehole,

wherein the failure that occurred during previous drilling of the borehole results in a potential borehole breakout event, and

wherein the borehole operation comprises a maintenance operation to mitigate the potential borehole breakout event.

3 . The method of claim 1 , further comprising:

determining, based on at least the identified failure region, an adjusted mud weight with respect to time,

wherein the borehole operation is performed further based on the adjusted mud weight with respect to time.

4 . The method of claim 1 ,

wherein the borehole is a planned borehole to be drilled,

wherein the failure is predicted to occur during a drilling operation of the planned borehole to result in a potential borehole breakout event, and

wherein the borehole operation comprises the drilling operation that is performed based on drilling parameters and equipment that are selected to mitigate the potential borehole breakout event.

5 . The method of claim 4 , further comprising:

specifying, based on the identified failure region, the drilling parameters and the equipment of the drilling operation.

6 . The method of claim 1 ,

wherein the pre-determined failure criterion comprises one of Mohr-Coulomb criterion, Drucker-Prager criterion, Hoek-Brown criterion, and Modified Lade criterion.

7 . The method of claim 1 , wherein performing the borehole operation comprises preventing a borehole breakout induced problem of tight hole or stuck pipe.

8 . A data gathering and analysis system, comprising:

a computer processor; and

memory storing instructions, when executed, causing the computer processor to:

determine a characteristic diffusion time that corresponds to an undrained response period or a non-monotonic pore pressure dissipation phase of a porous medium surrounding a borehole;

determine, based on a pre-determined failure criterion, a critical time of the borehole that corresponds to when a failure of the porous medium occurs within the characteristic diffusion time;

identify a failure region of the failure occurring at the critical time of the borehole; and

perform, based at least on the identified failure region, a borehole operation.

9 . The data gathering and analysis system of claim 8 ,

wherein the borehole is an existing borehole,

wherein the failure that occurred during previous drilling of the borehole results in a potential borehole breakout event, and

wherein the borehole operation comprises a maintenance operation to mitigate the potential borehole breakout event.

10 . The data gathering and analysis system of claim 8 , instructions, when executed, further causing the computer processor to:

determine, based on at least the identified failure region, an adjusted mud weight with respect to time,

wherein the borehole operation is performed further based on the adjusted mud weight with respect to time.

11 . The data gathering and analysis system of claim 8 ,

wherein the borehole is a planned borehole to be drilled,

wherein the failure is predicted to occur during a drilling operation of the planned borehole to result in a potential borehole breakout event, and

wherein the borehole operation comprises the drilling operation that is performed based on drilling parameters and equipment that are selected to mitigate the potential borehole breakout event.

12 . The data gathering and analysis system of claim 11 , instructions, when executed, further causing the computer processor to:

specify, based on the identified failure region, the drilling parameters and the equipment of the drilling operation.

13 . The data gathering and analysis system of claim 8 ,

wherein the pre-determined failure criterion comprises one of Mohr-Coulomb criterion, Drucker-Prager criterion, Hoek-Brown criterion, and Modified Lade criterion.

14 . The data gathering and analysis system of claim 8 , wherein performing the borehole operation comprises preventing a borehole breakout induced problem of tight hole or stuck pipe.

15 . A well system comprising:

a rig for drilling a borehole; and

a data gathering and analysis system comprising functionality for:

determining a characteristic diffusion time that corresponds to an undrained response period or a non-monotonic pore pressure dissipation phase of a porous medium surrounding a borehole;

determining, based on a pre-determined failure criterion, a critical time of the borehole that corresponds to when a failure of the porous medium occurs within the characteristic diffusion time;

identifying a failure region of the failure occurring at the critical time of the borehole; and

performing, using the rig and based at least on the identified failure region, a borehole operation.

16 . The well system of claim 15 ,

wherein the borehole is an existing borehole,

wherein the failure that occurred during previous drilling of the borehole results in a potential borehole breakout event, and

wherein the borehole operation comprises a maintenance operation to mitigate the potential borehole breakout event.

17 . The well system of claim 15 , the data gathering and analysis system further comprising functionality for:

determining, based on at least the identified failure region, an adjusted mud weight with respect to time,

wherein the borehole operation is performed further based on the adjusted mud weight with respect to time.

18 . The well system of claim 15 ,

wherein the borehole is a planned borehole to be drilled,

wherein the failure is predicted to occur during a drilling operation of the planned borehole to result in a potential borehole breakout event, and

wherein the borehole operation comprises the drilling operation that is performed based on drilling parameters and equipment that are selected to mitigate the potential borehole breakout event.

19 . The well system of claim 18 , the data gathering and analysis system further comprising functionality for:

specifying, based on the identified failure region, the drilling parameters and the equipment of the drilling operation.

20 . The well system of claim 15 ,

wherein the pre-determined failure criterion comprises one of Mohr-Coulomb criterion, Drucker-Prager criterion, Hoek-Brown criterion, and Modified Lade criterion, and

wherein performing the borehole operation comprises preventing a borehole breakout induced problem of tight hole or stuck pipe.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 18, 2023
From: SAUDI ARAMCO UPSTREAM TECHNOLOGIES COMPANY
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 065268/0033 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 17, 2023
From: ARAMCO SERVICES COMPANY
To: SAUDI ARAMCO UPSTREAM TECHNOLOGIES COMPANY
Reel/Frame 065255/0383 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 9, 2023
From: HAN, YANHUI; PHAN, DUNG; LIU, CHAO
To: ARAMCO SERVICES COMPANY
Reel/Frame 064533/0933 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 9, 2023
From: ALFARAJ, RIMA T.; KHAN, KHAQAN; ALRUWAILI, KHALID; ALTAMMAR, MURTADHA J.
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 064533/0982 →