Multi-band hybrid satellite communication systems and methods

Inventors: Satyajit Roy (Gaithersburg, MD); George Choquette (Potomac, MD)
Assignee: Hughes Network Systems, LLC
H04B7/18586H04W28/0867H04W28/0958
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,506,535
App. No.
18/361,390
Granted
Dec 23, 2025
Kind
B2
Abstract

Systems and methods for outroute load balancing in a multi-band hybrid satellite communication system include comparing the load metric of each of code rate organizers (CROs) to a threshold value; placing each CRO in one of a surplus load balancing set and a deficit balancing set based on a value of the load metric; and determining a probability metric for each satellite terminal associated with each of the CROs in the surplus load balancing set. The probability metric indicates a probability of the terminal moving to one of the CROs in the deficit load balancing set. At least one satellite terminal associated with one of the CROs in the surplus load balancing set is then caused to switch to one of the CROs in the deficit load balancing set based on the probability metric of the at least one satellite terminal.

Claims (68)

1 . A data processing device for a load balancing system of a multi-band hybrid satellite communication system, the data processing device comprising:

a processor; and

a memory in communication with the processor, the memory comprising executable instructions that, when executed by the processor alone or in combination with other processors, cause the processor to perform functions of:

determining a current congestion level of code rate organizers (CROs) of the load balancing system;

determining a load metric of each of the CROs, the load metric that is determined being different for different congestion levels of the CROs;

comparing the load metric of each of the CROs to a threshold value;

when the load metric of a CRO is greater than the threshold value, placing the CRO in a surplus load balancing set;

when the load metric of the CRO is less than the threshold value, placing the CRO in a deficit load balancing set;

determining a probability metric for each satellite terminal associated with each of the CROs in the surplus load balancing set, the probability metric indicating a probability of the terminal moving to one of the CROs in the deficit load balancing set; and

causing at least one satellite terminal associated with one of the CROs in the surplus load balancing set to switch to one of the CROs in the deficit load balancing set based on the probability metric of the at least one satellite terminal.

2 . The data processing device of claim 1 , wherein the congestion level of a CRO is determined based on an average utilization of the CRO or average utilization of an outroute associated with the CRO.

3 . The data processing device of claim 2 , wherein the current congestion level is one of heavily congested, medium congested, and lightly congested,

wherein, when the average utilization of the CRO or the average utilization of the outroute associated with the CRO is greater than a threshold value, the CRO is considered heavily congested,

wherein, when the average utilization of the CRO or the average utilization of the outroute associated with the CRO is less than the threshold value and the average utilization of any individual CRO or the average utilization of the outroute associated with any individual CRO is greater than the threshold value, the CRO is considered medium congested, and

wherein, when the average utilization of all CROs or the average utilization of the outroutes associated with all the CROs is less than the threshold value, the CROs are considered lightly congested.

4 . The data processing device of claim 3 , wherein, when the current congestion level of the CROs of the load balancing system is heavily congested, the load metric is a load ratio of each of the CROs, and

wherein, when the congestion level is medium congested, the load metric is an active plan rate of each of the CROs.

5 . The data processing device of claim 1 , wherein the load balancing system performs load balancing of first frequency band resources and second frequency band resources separately, and

wherein a first surplus load balancing set and a first deficit load balancing set are used for load balancing of the first frequency band resources and a second surplus load balancing set and a second deficit load balancing set are used load balancing of the second frequency band resources,

wherein terminals of CROs in the first surplus loading balancing set are only allowed to switch to CROs in the first deficit load balancing set, and

wherein terminals of CROs in the second surplus loading balancing set are only allowed to switch to CROs in the second deficit load balancing set.

6 . The data processing device of claim 5 , wherein the first frequency band resources are Ka-band resources and the second frequency band resources are Q-band resources, and

wherein, when there are more Ka-only terminals than multi-band terminals, determining the probability metric for the satellite terminals includes determining the probability metric such that multi-band terminal movement is biased toward CROs associated with Q-band outroutes.

7 . The data processing device of claim 1 , further comprising:

determining an upper limit threshold for each of the CROs in the deficit load balancing set, the upper limit threshold for each of the CROs being determined based on a total plan rate density of each of the CROs, and

wherein, when the total plan rate density of a CRO in the deficit load balancing set is greater than an average CRO plan rate density by a predetermined margin, the CRO in the deficit load balancing set is designated a non move-in CRO and terminals are not allowed to switch to the non move-in CRO.

8 . The data processing device of claim 3 , wherein, when the CROs are lightly congested, a terminal is not allowed to switch to another CRO when (i) a utilization of a CRO with which the terminal is associated is lower than an average CRO utilization of the CROs, (ii) a total plan rate density of the CRO with which the terminal is associated is less than or equal to an average CRO total plan rate density of the CROs, and (iii) any one of (a) a utilization of an Internet Protocol Gateway (IPGW) associated with the CRO for the terminal is less than equal to a first threshold, (b) an average utilization of all IPGWs connected with the CRO for the terminal is less than or equal to the first threshold, (c) an average utilization of IPGWs connected with the CRO for the terminal is less than or equal to an overall average IPGW utilization, and (d) a utilization of all IPGWs connected with the CRO for the terminal is greater than a second threshold, the second threshold being greater than the first threshold.

9 . A method for outroute load balancing in a multi-band hybrid satellite communication system, the method comprising:

determining a current congestion level of code rate organizers (CROs) of the load balancing system;

determining a load metric of each of the CROs, the load metric that is determined being different for different congestion levels of the CROs;

comparing the load metric of each of the CROs to a threshold value;

placing each CRO in one of a surplus load balancing set and a deficit balancing set based on a value of the load metric;

determining a probability metric for each satellite terminal associated with each of the CROs in the surplus load balancing set, the probability metric indicating a probability of the terminal moving to one of the CROs in the deficit load balancing set; and

causing at least one satellite terminal associated with one of the CROs in the surplus load balancing set to switch to one of the CROs in the deficit load balancing set based on the probability metric of the at least one satellite terminal.

10 . The method of claim 9 , when the congestion level of a CRO is determined based on an average utilization of the CRO or average utilization of an outroute associated with the CRO.

11 . The method of claim 10 , wherein the current congestion level is one of heavily congested, medium congested, and lightly congested,

wherein, when the average utilization of the CRO or the average utilization of the outroute associated with the CRO is greater than a threshold value, the CRO is considered heavily congested,

wherein, when the average utilization of the CRO or the average utilization of the outroute associated with the CRO is less than the threshold value and the average utilization of any individual CRO or the average utilization of the outroute associated with any individual CRO is greater than the threshold value, the CRO is considered medium congested, and

wherein, when the average utilization of all CROs or the average utilization of the outroutes associated with all the CROs is less than the threshold value, the CROs are considered lightly congested.

12 . The method of claim 11 , wherein, when the current congestion level of the CROs of the load balancing system is heavily congested, the load metric is a load ratio of each of the CROs, and

wherein, when the congestion level is medium congested, the load metric is an active plan rate of each of the CROs.

13 . The method of claim 9 , wherein the load balancing system performs load balancing of first frequency band resources and second frequency band resources separately, and

wherein a first surplus load balancing set and a first deficit load balancing set are used for load balancing of the first frequency band resources and a second surplus load balancing set and a second deficit load balancing set are used load balancing of the second frequency band resources,

wherein terminals of CROs in the first surplus loading balancing set are only allowed to switch to CROs in the first deficit load balancing set, and

wherein terminals of CROs in the second surplus loading balancing set are only allowed to switch to CROs in the second deficit load balancing set.

14 . The method of claim 13 , wherein the first frequency band resources are Ka-band resources and the second frequency band resources are Q-band resources, and

wherein, when there are more Ka-only terminals than multi-band terminals, determining the probability metric for the satellite terminals includes determining the probability metric such that multi-band terminal movement is biased toward CROs associated with Q-band outroutes.

15 . The method of claim 9 , further comprising:

determining an upper limit threshold for each of the CROs in the deficit load balancing set, the upper limit threshold for each of the CROs being determined based on a total plan rate density of each of the CROs, and

wherein, when the total plan rate density of a CRO in the deficit load balancing set is greater than an average CRO plan rate density by a predetermined margin, the CRO in the deficit load balancing set is designated a non move-in CRO and terminals are not allowed to switch to the non move-in CRO.

16 . The method of claim 11 , wherein, when the CROs are lightly congested, a terminal is not allowed to switch to another CRO when (i) a utilization of a CRO with which the terminal is associated is lower than an average CRO utilization of the CROs, (ii) a total plan rate density of the CRO with which the terminal is associated is less than or equal to an average CRO total plan rate density of the CROs, and (iii) any one of (a) a utilization of an Internet Protocol Gateway (IPGW) associated with the CRO for the terminal is less than equal to a first threshold, (b) an average utilization of all IPGWs connected with the CRO for the terminal is less than or equal to the first threshold, (c) an average utilization of IPGWs connected with the CRO for the terminal is less than or equal to an overall average IPGW utilization, and (d) a utilization of all IPGWs connected with the CRO for the terminal is greater than a second threshold, the second threshold being greater than the first threshold.

17 . A non-transitory computer readable medium on which are stored instructions that, when executed, cause a programmable device to perform functions of:

determining a current congestion level of code rate organizers (CROs) of a load balancing system;

determining a load metric of each of the CROs, the load metric that is determined being different for different congestion levels of the CROs;

comparing the load metric of each of the CROs to a threshold value;

when the load metric of a CRO is greater than the threshold value, placing the CRO in a surplus load balancing set;

when the load metric of the CRO is less than the threshold value, placing the CRO in a deficit load balancing set;

determining a probability metric for each satellite terminal associated with each of the CROs in the surplus load balancing set, the probability metric indicating a probability of the terminal moving to one of the CROs in the deficit load balancing set; and

causing at least one satellite terminal associated with one of the CROs in the surplus load balancing set to switch to one of the CROs in the deficit load balancing set based on the probability metric of the at least one satellite terminal.

18 . The non-transitory computer readable medium of claim 17 , wherein the congestion level of a CRO is determined based on an average utilization of the CRO or average utilization of an outroute associated with the CRO.

19 . The non-transitory computer readable medium of claim 18 , wherein the current congestion level is one of heavily congested, medium congested, and lightly congested,

wherein, when the average utilization of the CRO or the average utilization of the outroute associated with the CRO is greater than a threshold value, the CRO is considered heavily congested,

wherein, when the average utilization of the CRO or the average utilization of the outroute associated with the CRO is less than the threshold value and the average utilization of any individual CRO or the average utilization of the outroute associated with any individual CRO is greater than the threshold value, the CRO is considered medium congested, and

wherein, when the average utilization of all CROs or the average utilization of the outroutes associated with all the CROs is less than the threshold value, the CROs are considered lightly congested.

20 . The non-transitory computer readable medium of claim 17 , wherein the load balancing system performs load balancing of first frequency band resources and second frequency band resources separately, and

wherein a first surplus load balancing set and a first deficit load balancing set are used for load balancing of the first frequency band resources and a second surplus load balancing set and a second deficit load balancing set are used load balancing of the second frequency band resources,

wherein terminals of CROs in the first surplus loading balancing set are only allowed to switch to CROs in the first deficit load balancing set, and

wherein terminals of CROs in the second surplus loading balancing set are only allowed to switch to CROs in the second deficit load balancing set.

Assignments (2)
SECURITY INTEREST Recorded Oct 18, 2023
From: HUGHES NETWORK SYSTEMS, LLC
To: U.S. BANK NATIONAL ASSOCIATION
Reel/Frame 065271/0695 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2023
From: ROY, SATYAJIT; CHOQUETTE, GEORGE
To: HUGHES NETWORK SYSTEMS, LLC
Reel/Frame 064422/0794 →
Continuity (1)
Related Publication 20250038839A1 · Jan 30, 2025
References Cited (19)
US 8341266B2 · Olariu · 2012 [cited by examiner]
US 9642037B2 · Noerpel · 2017 [cited by examiner]
US 10405234B2 · Roy · 2019 [cited by examiner]
US 10419966B2 · Xu · 2019 [cited by examiner]
US 20030016634A1 · Freedman et al. · 2003 [cited by applicant]
US 20160212031A1 · Jain · 2016 [cited by examiner]
US 20180006949A1 · Xu et al. · 2018 [cited by applicant]
US 20200245192A1 · Roy et al. · 2020 [cited by applicant]
US 20210037419A1 · Roy · 2021 [cited by examiner]
US 20210203410A1 · Khan · 2021 [cited by examiner]
US 20210367891A1 · Roy et al. · 2021 [cited by applicant]
US 20220050717A1 · Deng · 2022 [cited by examiner]
US 20220116106A1 · Khan · 2022 [cited by examiner]
US 20220121491A1 · Deng · 2022 [cited by examiner]
US 20230247484A1 · Sajassi · 2023 [cited by examiner]
International Search Report and Written Opinion issued Jun. 18, 2025 in PCT/US2024/039680. [cited by applicant]
International Search Report and Written Opinion issued Sep. 2, 2025 in PCT/US2024/039675. [cited by applicant]
Ramahatla Kebonyethebe et al: “Multiband Reconfigurable Antennas for 5G Wireless and CubeSat Applications: A Review”, IEEE Access, vol. 10, Jan. 1, 2022 (Jan. 1, 2022), pp. 40910-40931. [cited by applicant]
Wang Feng et al: “Seamless Handover in LEO Based Non-Terrestrial Networks: Service Continuity and Optimization”, IEEE Transactions on Communications, [Online] vol. 71, No. 2, Dec. 14, 2022 (Dec. 14, 2022), pp. 1008-1023. [cited by applicant]