IP Library Granted Patent US 12,017,692
Granted Patent B2
US 12,017,692 · App. 18/373,225 · Granted Jun 25, 2024

Rail authority system and/or method

Inventors: Patrick Dunn (Los Angeles, CA); Benjamin Stuart Stabler (Los Angeles, CA); Marc Greenbaum (Los Angeles, CA); Babatunde Ogunfemi (Los Angeles, CA)
Assignee: Parallel Systems, Inc.
B61L27/16B61L27/12B61L27/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,017,692
App. No.
18/373,225
Granted
Jun 25, 2024
Kind
B2
Abstract

The system 100 can include: a railroad integration system, a motion planner, a vehicle controller, an optional user interface (UI), an optional fleet management system, and an optional track data system. However, the system 100 can additionally or alternatively include any other suitable set of components. The system functions to facilitate vehicle control and/or manage authority within a rail network.

Claims (36)

1. A positive train control (PTC) method for a set of autonomous rail agents comprising:

at a centralized motion planner:

determining a track warrant for at least one railroad authority;

based on the track warrant, determining the motion plan based on operational constraints for the track; and

commanding an autonomous rail agent, based on the motion plan and a state of the autonomous rail agent, by periodically broadcasting commands to the autonomous rail agent; and

dynamically maintaining an exclusive track reservation for the autonomous rail agent based on the commands; and

at a vehicle controller of the autonomous rail agent:

autonomously controlling the autonomous rail agent, within the exclusive track reservation, based on the commands and a heartbeat parameter; and

providing the state of the autonomous rail agent to the centralized motion planner;

wherein the exclusive track reservations are dynamically sized based on the commands and the heartbeat parameter.

2. The PTC method of claim 1 , wherein the exclusive track reservations are dynamically sized based further on a predetermined set of rules associated with a prior map of weak signal connectivity.

3. The PTC method of claim 2 , wherein the exclusive track reservations are sized to span the entirety of a tunnel.

4. The PTC method of claim 1 , wherein the track warrant authorizes operation within a set of track segments, wherein the motion plan comprises linearized coordinates along a series of track segments within the set of track segments, wherein the exclusive track reservation comprises a granular sub-region of track within the series of track segments.

5. The PTC method of claim 1 , wherein, while maintained, the exclusive reservation restricts track access to all other agents.

6. The PTC method of claim 1 , further comprising, at the centralized motion planner:

contemporaneously with maintaining the exclusive track reservation (ETR), commanding a plurality of autonomous rail agents within the track warrant based on the ETR; and

maintaining a respective ETR for each of the plurality of autonomous agents.

7. The PTC method of claim 6 , wherein the motion plan intersects at least one of the respective ETRs of the plurality of autonomous agents.

8. The PTC method of claim 1 , further comprising: in response to satisfaction of a trigger condition at the vehicle controller, autonomously controlling the vehicle to stop within the exclusive track reservation.

9. The PTC method of claim 7 , wherein the trigger condition is based on the heartbeat parameter.

10. The PTC method of claim 7 , wherein the trigger condition is based on the state of the autonomous agent.

11. A system for positive train control (PTC) along a track comprising:

a centralized motion planner configured to:

determine a motion plan based on operational constraints for the track;

command an autonomous rail vehicle based on the motion plan by periodically broadcasting commands to the autonomous rail vehicle; and

dynamically maintain an exclusive track reservation for the autonomous rail vehicle based on the commands; and

a vehicle controller of the autonomous rail vehicle which is communicatively coupled to the centralized motion planner and configured to:

autonomously controlling the autonomous rail vehicle, within the exclusive track reservation, based on the commands and a heartbeat parameter; and

providing the state of the autonomous rail vehicle to the centralized motion planner;

wherein the exclusive track reservations are dynamically sized based on the commands and the heartbeat parameter.

12. The system of claim 11 , wherein the exclusive track reservations are dynamically sized according to a predetermined set of rules.

13. The system of claim 11 , wherein the exclusive track reservations are dynamically sized based on a track geometry constraints.

14. The system of claim 13 , wherein the track geometry constraints are associated with a misaligned switch.

15. The system of claim 11 , wherein at least one exclusive track reservation is dynamically sized to span a tunnel.

16. The system of claim 11 , wherein the motion plan comprises linearized coordinates along a series of track segments within the set of track segments, wherein the exclusive track reservation comprises a granular sub-region of track within the series of track segments.

17. The system of claim 11 , wherein the vehicle controller is configured to autonomously control the vehicle to stop within the exclusive track reservation in response to a communication failure.

Assignments (3)
RELEASE OF SECURITY INTEREST Recorded Aug 19, 2025
From: FIRST-CITIZENS BANK & TRUST COMPANY (FKA: SILICON VALLEY BANK)
To: PARALLEL SYSTEMS, INC.
Reel/Frame 072062/0201 →
SECURITY INTEREST Recorded Dec 10, 2024
From: PARALLEL SYSTEMS, INC.
To: FIRST-CITIZENS BANK & TRUST COMPANY
Reel/Frame 069535/0009 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 6, 2023
From: DUNN, PATRICK; STABLER, BENJAMIN STUART; GREENBAUM, MARC; OGUNFEMI, BABATUNDE
To: PARALLEL SYSTEMS, INC.
Reel/Frame 065145/0542 →
Continuity (3)
Provisional Application 63423355 · Nov 7, 2022
Provisional Application 63410031 · Sep 26, 2022
Related Publication 20240101175A1 · Mar 28, 2024