IP Library Granted Patent US 12,363,733
Granted Patent B2
US 12,363,733 · App. 18/452,327 · Granted Jul 15, 2025

Semi-persistent scheduling confirmation

Inventors: Alireza Babaei (Fairfax, VA); Esmael Hejazi Dinan (McLean, VA)
Assignee: Ofinno, LLC
H04W72/23H04W72/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,363,733
App. No.
18/452,327
Granted
Jul 15, 2025
Kind
B2
Abstract

A wireless device may receive configuration information for a plurality of periodic resource allocations. A downlink control information (DCI) may be received comprising an indication of activation or release of at least one periodic resource allocation of the plurality of periodic resource allocations. After receiving the DCI, a medium access control (MAC) subheader comprising a logical channel identifier (LCID) that identifies a confirmation MAC control element may be sent. The confirmation MAC control element may comprise a plurality of fields, and at least one of the plurality of fields may indicate receipt of the indication of activation or release by using a same value to indicate either the activation or the release.

Claims (94)

1. A wireless device comprising:

at least one processor; and

memory storing instructions that, when executed by the at least one processor, configure the wireless device to:

receive a radio resource control (RRC) message comprising an index indentifying a semi-persistent scheduling (SPS) configuration of an SPS grant for a cell, wherein the SPS grant indicates a plurality of configured uplink grants with a periodicity;

receive a downlink control information (DCI) comprising the index of the SPS configuration of the plurality of configured uplink grants, wherein the DCI indicates that the SPS configuration is activated or released;

transmit a confirmation medium access control (MAC) control element (CE) comprising a bitmap, wherein:

bit i in the bitmap corresponds to an SPS indicated by index i; and

a value of bit i is set to 1 to indicate SPS confirmation for SPS activation and an SPS release.

2. The wireless device of claim 1 , wherein a value of the bit i is set to 0 for one or more SPSs that do not require SPS confirmation or are not configured.

3. The wireless device of claim 2 , wherein the DCI is associated with an SPS radio network temporary identifier (RNTI).

4. The wireless device of claim 3 , wherein the RRC message further comprises the SPS-RNTI for the SPS configuration.

5. The wireless device of claim 4 , wherein the SPS configuration comprises the periodicity.

6. The wireless device of claim 2 , wherein the confirmation MAC CE is identified by a MAC protocol data unit (PDU) sub-header with a logical channel identifier (LCID).

7. The wireless device of claim 6 , wherein the instructions further cause the wireless device to transmit the MAC PDU sub-header with the LCID.

8. The wireless device of claim 7 , wherein the confirmation MAC CE has lower priority than:

a MAC CE for a cell-RNTI (C-RNTI); or

data from uplink common control channel (UL-CCCH).

9. The wireless device of claim 8 , wherein the confirmation MAC CE has higher priority than a MAC CE for a buffer status report (BSR).

10. The wireless device of claim 9 , wherein an SPS confirmation indicated by the confirmation MAC CE is triggered by the DCI.

11. The wireless device of claim 10 , wherein the instructions further cause the wireless device to:

trigger an SPS confirmation after receiving the DCI; and

based on uplink resources being allocated for a new transmission:

instruct a multiplexing and assembly procedure to generate the confirmation MAC CE; and

cancel the triggered SPS confirmation.

12. The wireless device of claim 11 , wherein the instructions further cause the wireless device to, if the DCI indicates that the SPS configuration is released, clear a configured uplink grant associated with the uplink SPS configuration after a first transmission of the confirmation MAC CE.

13. The wireless device of claim 2 , wherein an SPS confirmation indicated by the confirmation MAC CE is triggered by the DCI.

14. The wireless device of claim 13 , wherein the instructions further cause the wireless device to:

trigger an SPS confirmation after receiving the DCI; and

based on uplink resources being allocated for a new transmission:

instruct a multiplexing and assembly procedure to generate the confirmation MAC CE; and

cancel the triggered SPS confirmation.

15. The wireless device of claim 14 , wherein the instructions further cause the wireless device to, if the DCI indicates that the SPS configuration is released, clear a configured uplink grant associated with the uplink SPS configuration after a first transmission of the confirmation MAC CE.

16. The wireless device of claim 1 , wherein the confirmation MAC CE has lower priority than:

a MAC CE for a cell-RNTI (C-RNTI); or

data from uplink common control channel (UL-CCCH).

17. The wireless device of claim 16 , wherein the confirmation MAC CE has higher priority than a MAC CE for a buffer status report (BSR).

18. The wireless device of claim 17 , wherein an SPS confirmation indicated by the confirmation MAC CE is triggered by the DCI.

19. The wireless device of claim 18 , wherein the instructions further cause the wireless device to:

trigger an SPS confirmation after receiving the DCI; and

based on uplink resources being allocated for a new transmission:

instruct a multiplexing and assembly procedure to generate the confirmation MAC CE; and

cancel the triggered SPS confirmation.

20. The wireless device of claim 19 , wherein the instructions further cause the wireless device to, if the DCI indicates that the SPS configuration is released, clear a configured uplink grant associated with the uplink SPS configuration after a first transmission of the confirmation MAC CE.

21. A wireless device comprising:

one or more processors; and

memory storing instructions that, when executed by the one or more processors, cause the wireless device to:

receive a first downlink control information (DCI) indicating an activation of a first configured uplink grant configuration;

transmit a first medium access control control element (MAC CE) comprising a plurality of first bits to confirm the activation, wherein the plurality of first bits comprises a first bit set to one based on the receiving the first DCI indicating the activation of the first configured uplink grant configuration;

receive a second DCI indicating a release of a second configured uplink grant configuration; and

transmit a second MAC CE comprising a plurality of second bits to confirm the release, wherein the plurality of second bits comprise a second bit set to one based on the receiving the second DCI indicating the release of the second configured uplink grant configuration.

22. The wireless device of claim 21 , wherein:

the first bit is set to one to confirm the activation of the first configured uplink grant configuration based on the receiving the first DCI; and

the second bit is set to one to confirm the release of the second configured uplink grant configuration based on the receiving the second DCI.

23. The wireless device of claim 21 , wherein:

the plurality of first bits comprise a third bit set to zero for a third configured uplink grant configuration; and

the plurality of second bits comprise a fourth bit set to zero for a fourth configured uplink grant configuration.

24. The wireless device of claim 23 , wherein:

the third bit is set to zero to indicate that no confirmation of an activation, or a release, of the third configured uplink grant configuration is required; and

the fourth bit is set to zero to indicate that no confirmation of an activation, or a release, of the fourth configured uplink grant configuration is required.

25. The wireless device of claim 24 , wherein:

each bit, in the plurality of first bits and in the plurality of second bits, corresponds to a configured uplink grant among a plurality of configured uplink grants; and

the plurality of configured uplink grants comprise the first configured uplink grant configuration, the second configured uplink grant configuration, the third configured uplink grant configuration, and the fourth configured uplink grant configuration.

26. The wireless device of claim 25 , wherein each of the plurality of configured uplink grants are semi-persistently scheduled.

27. The wireless device of claim 23 , wherein:

a field of the first DCI indicates a first index of the first uplink configured grant configuration; and

a field of the second DCI indicates a second index of the second uplink configured grant configuration.

28. The wireless device of claim 27 , wherein the second DCI comprises one or more fields set to pre-configured values to indicate the release of the second configured uplink grant configuration.

29. The wireless device of claim 28 , wherein the instructions further cause the wireless device to receive one or more radio resource control (RRC) messages comprising parameters of a plurality of configured uplink grant configurations, wherein the parameters comprise:

indexes of the plurality of uplink configured grant configurations, wherein the indexes comprise the first index and the second index; and

periodicities of the plurality of uplink configured grant configurations, wherein the periodicities comprise:

a first periodicity of the first configured uplink grant configuration; and

a second periodicity of the second configured uplink grant configuration.

30. The wireless device of claim 29 , wherein the instructions further cause the wireless device to transmit uplink transmissions based on the first periodicity and radio resources indicated by the uplink grant.

31. The wireless device of claim 23 , wherein the instructions further cause the wireless device to:

trigger the first MAC CE based on the first DCI being received; and

trigger the second MAC CE based on the second DCI being received.

32. The wireless device of claim 31 , wherein the instructions further cause the wireless device to:

cancel the triggered first MAC CE after the first MAC CE is transmitted; and

cancel the triggered second MAC CE after the second MAC CE is transmitted.

33. The wireless device of claim 32 , wherein the instructions further cause the wireless device to clear the second configured uplink grant configuration after the second MAC CE is transmitted.

34. The wireless device of claim 33 , wherein:

the first MAC CE is transmitted based on:

the first MAC CE being triggered and not canceled; and

uplink resources being allocated for a new transmission;

the second MAC CE is transmitted based on:

the second MAC CE being triggered and not canceled; and

uplink resources being allocated for a new transmission.

35. The wireless device of claim 34 , wherein:

a first logical channel priority of the first MAC CE is:

lower than a logical channel priority of a MAC CE for a cell radio network temporary identifier (C-RNTI); and

higher than a logical channel priority of a MAC CE for a buffer status report (BSR); and

a second logical channel priority of the second MAC CE is:

lower than the logical channel priority of the MAC CE for C-RNTI; and

higher than the logical channel priority of the MAC CE for the BSR.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2024
From: COMCAST CABLE COMMUNICATIONS, LLC
To: OFINNO, LLC
Reel/Frame 069743/0577 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 12, 2024
From: BABAEI, ALIREZA; DINAN, ESMAEL HEJAZI
To: OFINNO TECHNOLOGIES, LLC
Reel/Frame 068573/0064 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 12, 2024
From: BABAEI, ALIREZA; DINAN, ESMAEL HEJAZI
To: OFINNO TECHNOLOGIES, LLC
Reel/Frame 068573/0094 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 12, 2024
From: OFINNO TECHNOLOGIES, LLC
To: COMCAST CABLE COMMUNICATIONS, LLC
Reel/Frame 068573/0196 →
Continuity (6)
Continuation 17896881 · Aug 26, 2022
Continuation 17168785 · Feb 5, 2021
Continuation 15812246 · Nov 14, 2017
Provisional Application 62422284 · Nov 15, 2016
Provisional Application 62421821 · Nov 14, 2016
Related Publication 20240032052A1 · Jan 25, 2024
References Cited (173)
US 6771875B1 · Kunieda et al. · 2004 [cited by applicant]
US 7596549B1 · Issa et al. · 2009 [cited by applicant]
US 10959218B2 · Babaei · 2021 [cited by examiner]
US 11464005B2 · Babaei · 2022 [cited by examiner]
US 11785615B2 · Babaei · 2023 [cited by examiner]
US 20100098012A1 · Bala et al. · 2010 [cited by applicant]
US 20110105107A1 · Kwon et al. · 2011 [cited by applicant]
US 20110249578A1 · Nayeb Nazar et al. · 2011 [cited by applicant]
US 20130028229A1 · Suh et al. · 2013 [cited by applicant]
US 20130058233A1 · Kim · 2013 [cited by applicant]
US 20130121297A1 · Kim et al. · 2013 [cited by applicant]
US 20130301509A1 · Purnadi et al. · 2013 [cited by applicant]
US 20140016593A1 · Park et al. · 2014 [cited by applicant]
US 20140241319A1 · Lee et al. · 2014 [cited by applicant]
US 20140344472A1 · Lovsen et al. · 2014 [cited by applicant]
US 20150043429A1 · Kim et al. · 2015 [cited by applicant]
US 20150181576A1 · Papasakellariou et al. · 2015 [cited by applicant]
US 20150365831A1 · Ko et al. · 2015 [cited by applicant]
US 20150365963A1 · Won et al. · 2015 [cited by applicant]
US 20160100353A1 · Gleixner · 2016 [cited by applicant]
US 20160204905A1 · Lee et al. · 2016 [cited by applicant]
US 20160227486A1 · Park · 2016 [cited by applicant]
US 20160227602A1 · Yi et al. · 2016 [cited by applicant]
US 20160295624A1 · Novlan et al. · 2016 [cited by applicant]
US 20170019887A1 · Jiang et al. · 2017 [cited by applicant]
US 20170245245A1 · Kim et al. · 2017 [cited by applicant]
US 20170325076A1 · Fujishiro et al. · 2017 [cited by applicant]
US 20170347270A1 · Iouchi et al. · 2017 [cited by applicant]
US 20170374665A1 · Lee et al. · 2017 [cited by applicant]
US 20180007680A1 · Lee et al. · 2018 [cited by applicant]
US 20180007693A1 · Lee et al. · 2018 [cited by applicant]
US 20180014284A1 · Yi · 2018 [cited by examiner]
US 20180027461A1 · Jia et al. · 2018 [cited by applicant]
US 20180035276A1 · Kang et al. · 2018 [cited by applicant]
US 20180035340A1 · Fujishiro et al. · 2018 [cited by applicant]
US 20180049225A1 · Lee · 2018 [cited by examiner]
US 20180124707A1 · Lee et al. · 2018 [cited by applicant]
US 20180159935A1 · Cavalcanti et al. · 2018 [cited by applicant]
US 20180192268A1 · Xu et al. · 2018 [cited by applicant]
US 20180206089A1 · Cavalcanti et al. · 2018 [cited by applicant]
US 20180255569A1 · Aiba et al. · 2018 [cited by applicant]
US 20190014563A1 · Lee et al. · 2019 [cited by applicant]
US 20190090222A1 · Wu et al. · 2019 [cited by applicant]
US 20190098698A1 · Fukuta · 2019 [cited by applicant]
US 20190182644A1 · Zheng et al. · 2019 [cited by applicant]
US 20190245657A1 · Lee et al. · 2019 [cited by applicant]
EP 2763338A1 · 2014 [cited by applicant]
EP 3482595B1 · 2021 [cited by applicant]
EP 3490325B1 · 2022 [cited by applicant]
R1-162500, RAN WG1 Meeting #84bis, Busan, Korea, Apr. 11-15, 2016, Source: LG Electronics, Title: Discussions on UL enhancements for V2X. [cited by applicant]
R1-164421, 3GPP TSG-RAN WG1 #85, May 23-27, 2016, Nanjing, China, Agenda item: 6.2.2.3.1, Source: Qualcomm Incorporated, Title: eNodeB signaling for SPS resource allocation. [cited by applicant]
R1-164422, 3GPP TSG-RAN WG1 #85, May 23-27, 2016, Nanjing, China, Agenda item: 6.2.2.3.2, Source: Qualcomm Incorporated, Title: UE reporting for eNodeB resource allocation. [cited by applicant]
R1-164468, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China, May 23-27, 2016, Source: Guangdong OPPO Mobile Telecom, Title: Discussion on the SPS configuration for mode-2. [cited by applicant]
R1-164514, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China May 23-27, 2016, Source: LG Electronics, Title: Discussion on details of (E)PDCCH used for sidelink SPS. [cited by applicant]
R1-164515, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China, May 23-27, 2016, Agenda item: 6.2.2.3.2, Source: LG Electronics, Title: Discussion on details of UE reporting. [cited by applicant]
R1-164538, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China, May 23-27, 2016, Source: LG Electronics, Title: Discussion on UL SPS for V2X. [cited by applicant]
R1-164762, 3GPP TSG RAN WG1 Meeting #85, Nanjing, May 23-27, 2016, Agenda Item: 6.2.2.3.1, Source: Samsung, Title: Multiple SPS configuration support for SL. [cited by applicant]
R1-164763, 3GPP TSG RAN WG1 Meeting #85, Nanjing, May 23-27, 2016, Agenda Item: 6.2.2.3.2, Source: Samsung, Title: UE reporting procedure for SL SPS transmissions. [cited by applicant]
R1-164818, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China, May 23-27, 2016, Agenda Item: 6.2.2.3, Source: Huawei, HiSilicon, Title: SPS enhancement for V2V. [cited by applicant]
R1-164906, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China May 23-27, 2016, Source: Panasonic, Title: Signaling design to support SPS activation/release in V2V. [cited by applicant]
R1-164963, 3GPP TSG-RAN WG1 Meeting #85, Nanjing, China May 23-27, 2016, Source: ZTE, Title: Trigger and release of V2V SPS resources. [cited by applicant]
R1-164964, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China May 23-27, 2016, Agenda item: 6.2.2.3.2, Source: ZTE, Title: Discussion on UE reporting. [cited by applicant]
R1-165193, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China May 23-27, 2016, Source: NTTdocomo, Inc., Title: (E)PDCCH for sidelink SPS configuration switching. [cited by applicant]
R1-165194, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China May 23-27, 2016, Source: NTT Docomo, Inc., Title: UE reporting for sidelink SPS operation. [cited by applicant]
R1-165246, 3GPP TSG RAN WG1 Meeting #85, Nanjing, PRC, May 23-27, 2016, Source: Ericsson, Title: Contents of Downlink Control Information for V2V over PCS. [cited by applicant]
R1-165272, 3GPP TSG RAN WG1 Meeting #85, Nanjing, PRC, May 23-27, 2016, Source: Ericsson, Title: Mode-1 SPS for V2V over PCS. [cited by applicant]
R1-165274, 3GPP TSG RAN WG1 Meeting #85, Nanjing, May 23-27, 2016, Source: Ericsson, Title: UL SPS and reporting to eNB for V2X. [cited by applicant]
R1-165309, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China May 23-27, 2016, Source: Panasonic, Title: Details on PCS SPS enhancement. [cited by applicant]
R2-162197, 3GPP TSG-RAN2 Meeting #93bis, Dubrovnik, Croatia, Apr. 11-15, 2016, Agenda Item: 8.2.1, Source: OPPO, Title: Discussion on SPS Enhancements for V2V. [cited by applicant]
R2-162454, 3GPP TSG RAN WG2 Meeting #93bis, Dubrovnik, Croatia, Apr. 11-15, 2016, Agenda item: 8.2.1, Source: Intel Corporation, Title: SL resource allocation in SPS manner. [cited by applicant]
R2-162927, 3GPP TSG-RAN2 Meeting #93bis, Dubrovnik, Croatia, Apr. 11-15, 2016, Agenda item: 8.2.1, Source: LG Electronics Inc., Title: SL SPS enhancement for V2V. [cited by applicant]
R2-163406, 3GPP TSG-RAN2 Meeting #94, Nanjing, P. R. China, Apr. 23-27, 2016, Agenda Item: 8.11.1, Source: OPPO, Title: Discussion on SPS Enhancements for V2X. [cited by applicant]
R2-163421, 3GPP TSG-RAN WG2 Meeting #94, Nanjing, China, May 23-25, 2016, Source: CATT, Title: Consideration on SPS Enhancement. [cited by applicant]
R2-163451, 3GPP TSG RAN WG2 Meeting #94, Nanjing, China, Apr. 23-25, 2016, Agenda Item: 8.2.4, Source: Samsung, Title: UE reporting and dynamic SL SPS transmission. [cited by applicant]
R2-163807, 3GPP TSG-RAN WG2 Meeting #94, Nanjing, China, May 23-27, 2016, Agenda Item: 8.11.1, Source: Huawei, HiSilicon, InterDigital, LG Electronics Inc., OPPO, Title: Discussions on CAM Characteristics. [cited by applicant]
R2-163812, 3GPP TSG-RAN WG2 #94, Nanjing, China, May 23-27, 2016, Agenda Item: 8.2.4, Source: Huawei, HiSilicon, Title: Enhancements for Sidelink Resource Allocation. [cited by applicant]
R2-163840, 3GPP TSG RAN WG2 #94, Nanjing, China, May 23 27, 2016, Source: ZTE, Title: SPS enhancements for V2X over Uu. [cited by applicant]
R2-163865, 3GPP TSG RAN WG2 Meeting #94, Nanjing, China, May 23-25, 2016, Source: ITL, Title: SLSPS for V2V. [cited by applicant]
R2-163885, 3GPP TSG RAN WG2 Meeting #94, Nanjing, China, May 23-27, 2016, Source: Potevio, Title: UE assisted information for SPS. [cited by applicant]
R2-163900, 3GPP TSG-RAN WG2 Meeting #94, Nanjing, China, May 23-27, 2016, Agenda item: 8.11.1, Source: Nokia, Alcatel-Lucent Shanghai Bell, Title: Multiple inter-dependent UL SPS occasions. [cited by applicant]
R2-164063, 3GPP TSG-RAN WG2 Meeting #94, Nanjing, China, May 23-27, 2016, Agenda item: 8.2.4, Source: Qualcomm Incorporated, Title: SPS for V2V Communication. [cited by applicant]
R2-164079, 3GPP TSG-RAN2 Meeting #94, Nanjing, China, Apr. 11-15, 2016, Agenda item: 8.2.4, Source: LG Electronics Inc. Title: Support of Semi-Persistent Scheduling for PCS mode 1. [cited by applicant]
R2-164082, 3GPP TSG-RAN2 Meeting #94, Nanjing, China, Apr. 11-15, 2016, Agenda item: 8.11.1, Source: LG Electronics Inc, InterDigital, OPPO, Huawei, Title: Proposed TP for UL SPS enhancements. [cited by applicant]
R2-164377, 3GPP TSG-RAN WG2 Meeting #94, Nanjing, China, May 23-27, 2016, Agenda item: 8.11.1, Source: Huawei, HiSilicon, Title: TP on CAM Characteristics. [cited by applicant]
Tdoc R2-161571, 3GPP TSG-RAN WG2 #93, St. Julians, Malta, Feb. 15-19, 2016, Agenda Item: 7.11, Source: Ericsson, Title: Overview of V2X Enhancements for Further RAN2 Work. [cited by applicant]
Tdoc R2-164112, 3GPP TSG-RAN WG2 #94, Nanjing, P.R. China, May 23-27, 2016, Agenda Item: 8.11.1, Source: Ericsson, Title: SPS Enhancements for Uu Operations in V2X. [cited by applicant]
3GPP TS 36.423 V14.0.0 (Sep. 2016); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); X2 appli… [cited by applicant]
R2-167409; 3GPP TSG RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; 3GPP TSG RAN WG1 Meeting #86bis; R1-1610929; Lisboa, Portugal, Oct. 10-14, 2016; Title: LS response on DFN offset. [cited by applicant]
R2-167481; 3GPP TSG-RAN2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda Item: 8.13.2; Source: OPPO; Title: Discussion on Remain Issues of V2X SPS Enhancements. [cited by applicant]
R2-167482; 3GPP TSG-RAN2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda Item: 8.13.3; Source: OPPO; Title: Discussion on V2P. [cited by applicant]
R2-167567; 3GPP TSG-RAN WG2 #96; Reno, USA, Nov. 14-18, 2016; Agenda item: 8.13.2; Source: Samsung, Intel; Title: Handling Sidelink SPS Configurations. [cited by applicant]
R2-167889; 3GPP TSG-RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda item: 8.13.2; Source: Qualcomm Incorporated; Title: SPS enhancement for V2X. [cited by applicant]
R2-167890; 3GPP TSG-RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda item: 8.13.3; Source: Qualcomm Incorporated; Title: Sensing based resource selection for V2P. [cited by applicant]
R2-167919; 3GPP TSG RAN WG2 #96; Reno, USA, Nov. 14 to 18, 2016; Agenda Item: 8.13.3; Source: Samsung; Title: Discussion about prioritization of P-UEs. [cited by applicant]
R2-167928; 3GPP TSG RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda Item: 8.13.3; Source: Huawei, HiSilicon; Title: Discussion on P2X Sidelink Communication. [cited by applicant]
R2-167930; 3GPP TSG RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda Item: 8.13.2; Source: Huawei, HiSilicon; Title: Discussions on Remaining Issues for SPS. [cited by applicant]
R2-167934; 3GPP TSG RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda Item: 8.13.1; Source: Huawei, HiSilicon; Title: Multi-PLMN operation for Uu-based V2X. [cited by applicant]
R2-167998; 3GPP TSG RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda item: 8.13.2; Source: Potevio; Title: Details of LCP for enhanced SPS configurations. [cited by applicant]
R2-167999; 3GPP TSG RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Source: Potevio; Title: Discussion on SPS configuration related issues. [cited by applicant]
R2-168043; 3GPP TSG-RAN WG2 #96; Reno, USA, Nov. 14-18, 2016; Agenda item: 8.13.3; Source: Kyocera; Title: Consideration of the P2V transmission scheme. [cited by applicant]
R2-168045; 3GPP TSG RAN WG2 #96; Reno, USA, Nov. 14 to 18, 2016; Agenda Item: 8.13.1; Source: Samsung; Title: Supporting small and variable Service Area in non-overlapped local MBMS service area. [cited by applicant]
R2-168068; 3GPP TSG-RAN WG2 Meeting #96; Reno, Nevada, USA, Nov. 14-18, 2016; Agenda item: 8.13.3; Source: Samsung; Title: Resource configuration for P2V. [cited by applicant]
R2-168083; 3GPP TSG RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Source: CATT; Title: Discussion on Impact of LCP procedure in V2X SPS resource usage; Agenda Item: 8.13.2. [cited by applicant]
R2-168084; 3GPP TSG RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Source: CATT, ZTE, Potevio; Title: Discussion on V2X SPS. [cited by applicant]
R2-168085; 3GPP TSG-RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Source: CATT; Title: Consideration on pool management and resource selection. [cited by applicant]
R2-168137; 3GPP TSG-RAN WG2 #96; Reno, USA, Nov. 14-18, 2016; Agenda Item: 8.13.2; Source: ZTE; Title: Discussion on SPS related issues. [cited by applicant]
R2-168139; 3GPP TSG-RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Title: MBMS enhancement for Uu based V2X communication; Source: ZTE Corporation. [cited by applicant]
R2-168144; 3GPP TSG-RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Title: Discussion on V2P aspects; Source: ZTE. [cited by applicant]
R2-168273; 3GPP TSG-RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda Item: 8.13.3; Source: Coolpad; Title: Discussion on power saving for PCS-based V2P. [cited by applicant]
R2-168409; 3GPP TSG-RAN WG2 #96; Reno, USA, Aug. 14-18, 2016; Agenda Item: 8.13.2; Source: LG Electronics Inc.; Title: SPS and UE assistant information for V2X. [cited by applicant]
R2-168410; 3GPP TSG-RAN WG2 #96; Reno, USA, Nov. 14-18, 2016; Agenda Item : 8.13.3; Source: LG Electronics Inc.; Title: Support for V2P service. [cited by applicant]
R2-168426; 3GPP TSG-RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda item: 8.13.3; Source: Nokia, Alcatel-Lucent Shanghai Bell; Title: Efficient V2P/P2V activation. [cited by applicant]
R2-168427; 3GPP TSG-RAN WG2 Meeting #96; Reno, USA, Nov. 14-18, 2016; Agenda item: 8.13.2; Source: Nokia, Alcatel-Lucent Shanghai Bell; Title: Further discussion on SPS enhancements. [cited by applicant]
R2-168486; 3GPP TSG-RAN WG2 #96; Reno, Nevada, USA, Nov. 14-18, 2016; Agenda Item: 9.3.1.1.3; Source: Ericsson; Title: Consideration on mobility for URLLC and eV2x. [cited by applicant]
R2-168642; 3GPP TSG-RAN WG2 #96; Reno, Nevada, USA, Nov. 14-18, 2016; Agenda Item: 8.13.3; Source: Ericsson; Title: Discussion on Sidelink Operations for Pedestrian. [cited by applicant]
R2-168653; 3GPP TSG-RAN WG2 #96; Reno, Nevada, USA, Nov. 14-18, 2016; Agenda Item: 8.13.2; Source: Ericsson; Title: SPS Protocol for Uu. [cited by applicant]
R2-168701; 3GPP TSG-RAN WG2 #96; Reno, Nevada, USA, Nov. 14-18, 2016; Agenda Item: 8.13.2; Source: Ericsson, Interdigital, Qualcomm; Title: Configuration of UE Assistance Information. [cited by applicant]
R2-168702; 3GPP TSG-RAN WG2 #96; Reno, Nevada, USA, Nov. 14-18, 2016; Agenda Item: 8.13.2; Source: Ericsson, Interdigital, ITL; Title:vSidelink SPS Configuration. [cited by applicant]
R2-168789; 3GPP TSG RAN WG2 Meeting #96; Reno, NV, USA, Nov. 14-18, 2016; Title: Draft LS reply on Voice and Video enhancement for LTE. [cited by applicant]
International Search Report dated Jan. 11, 2018 in International Application No. PCT/US2017/045754. [cited by applicant]
R2-164105, 3GPP TSG-RAN WG2 Meeting #94, Nanjing, China, May 23-27, 2016, Source: Ericsson, Title: Sidelink Resource Allocation in V2X. [cited by applicant]
R2-163836, 3GPP TSG-RAN WG2 Meeting #94, Nanjing, China, May 23-27, 2016, Source: ZTE, Title: SPS enhancements for V2V over PC5. [cited by applicant]
3GPP TS 36.213 V11.3.0 (Jul. 2013), Technical Specification, 3rd Generation Partnership Project; Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); (Release 11). [cited by applicant]
3GPP TS 36.211 V14.0.0 (Sep. 2016); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels… [cited by applicant]
3GPP TS 36.212 V14.0.0 (Sep. 2016); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Multiplexing and … [cited by applicant]
3GPP TS 36.213 V14.0.0 (Sep. 2016); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer pr… [cited by applicant]
3GPP TS 36.300 V14.0.0 (Sep. 2016); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Univer… [cited by applicant]
3GPP TS 36.321 V14.0.0 (Sep. 2016); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Con… [cited by applicant]
3GPP TS 36.331 V14.0.0 (Sep. 2016); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Co… [cited by applicant]
R2-162236; 3GPP TSG-RAN WG2 Meeting #93bis; Apr. 11 to 15, 2016, Dubrovnik, Croatia; Agenda Item: 8.8.2; Source: Samsung; Title: Discussion on acknowledging SPS command. [cited by applicant]
R2-162264; 3GPP TSG-RAN WG2 Meeting #93b; Dubrovnik, Croatia, Apr. 11-15, 2016; Agenda item: 8.8.2; Source: Huawei, HiSilicon; Title: On UL grants skipping. [cited by applicant]
R2-162265; 3GPP TSG-RAN WG2 Meeting #93bis; Dubrovnik, Croatia, Apr. 11-15, 2016; Agenda Item 8.8.2; Source: Huawei, HiSilicon; Title: Implicit SPS release under UL grants skipping. [cited by applicant]
R2-162266; 3GPP TSG-RAN WG2 Meeting #93b; Dubrovnik, Croatia, Apr. 11-15, 2016; Agenda item: 8.8.2; Source: Huawei, HiSilicon; Title: Necessity of feedback for SPS activation and deactivation. [cited by applicant]
R2-162415; 3GPP TSG-RAN WG2 Meeting #93bis; Dubrovnik, Croatia, Apr. 11-15, 2016; Agenda Item: 8.8.1; Source: CMCC; Title: Remaining issues related to UL SPS. [cited by applicant]
R2-162466; 3GPP TSG-RAN2 Meeting #93bis; Dubrovnik, Croatia Apr. 11-15, 2016; Agenda item: 8.8.1; Source: Intel Corporation; Title: Further aspects of short SPS interval. [cited by applicant]
R2-162467; 3GPP TSG-RAN2 Meeting #93bis; Dubrovnik, Croatia Apr. 11-15, 2016; Agenda item:8.8.2;Source: Intel Corporation; Title: Further aspects of UL grant skipping. [cited by applicant]
R2-162468; 3GPP TSG-RAN2 Meeting #93bis; Dubrovnik, Croatia Apr. 11-15, 2016; Agenda item: 8.8.3; Source: Intel Corporation; Title: SPS activation, reactivation and deactivation feedback. [cited by applicant]
R2-162515; 3GPP TSG RAN WG2 Meeting #93bis; Dubrovnik, Croatia, Apr. 11-15, 2016; Source:CATT; Title: Feedback for SPS PDCCH command. [cited by applicant]
R2-162572; 3GPP TSG-RAN WG2 Meeting #93bis; Dubrovnik, Croatia, Apr. 11-15, 2016; Source: ZTE Corporation; Title: Discussion on the feedback of the SPS activation command. [cited by applicant]
R2-162601; 3GPP TSG-RAN2 Meeting #93bis; Republika Hrvatska, Dubrovnik, Apr. 11-15, 2016; Agenda Item:8.8.2—LTE Rel-14: WI: L2 latency reduction techniques; Source: ASUSTek; Title: Discussion on skipping UL grants. [cited by applicant]
R2-162781; 3GPP TSG-RAN WG2 #93bis; Dubrovnik, Croatia, Apr. 11-15, 2016; Agenda Item: 8.8.3; Source: Ericsson; Title: Acknowledgements for SPS commands. [cited by applicant]
R2-162901; 3GPP TSG-RAN WG2 Meeting #93bis; Dubrovnik, Croatia, Apr. 11-15, 2016; Agenda Item: 8.8.2 (LTE_LATRED_L2-Core); Source: LG Electronics Inc.; Title: Need for feedback of SPS command. [cited by applicant]
R2-162902; 3GPP TSG-RAN WG2 Meeting #93bis; Dubrovnik, Croatia, Apr. 11-15, 2016; Agenda Item: 8.8.2 (LTE_LATRED_L2-Core); Source: LG Electronics Inc.; Title: SPS feedback transmission. [cited by applicant]
R2-162909; 3GPP TSG-RAN2 Meeting #93bis; Dubrovnik, Croatia, Apr. 12-16, 2016; Agenda item: 8.8.2; Source: Qualcomm Incorporated; Title: Open issues for skipping UL grants. [cited by applicant]
R2-163385; 3GPP TSG-RAN2 Meeting #94; Nanjing, China, May 23-27, 2016; Agenda item: 8.8.1; Source: FiberHome; Title: UL SPS command feedback. [cited by applicant]
R2-163386; 3GPP TSG-RAN WG2 Meeting #94; Nanjing, China, May 23-27, 2016; Agenda Item: 8.8.2; Source: FiberHome; Title: discussion of retransmission for short SPS period. [cited by applicant]
R2-163475; 3GPP TSG RAN WG2 Meeting #94; Nanjing, China, May 23-27, 2016; Source: CATT; Title: Feedback for SPS activation and deactivation. [cited by applicant]
R2-163671; 3GPP TSG-RAN WG2 Meeting #94; May 23 to 27, 2016, Nanjing, China; Agenda Item: 8.8.1; Source: Samsung; Title: Feedback for SPS activation/deactivation. [cited by applicant]
R2-163698; 3GPP TSG-RAN WG2 Meeting #94; Nanjing, China, May 23-27, 2016; Agenda item: 8.8.1; Source: Nokia, Alcatel-Lucent Shanghai Bell; Title: Feedback for SPS activation/deactivation. [cited by applicant]
R2-163771; 3GPP TSG-RAN WG2 Meeting #94; Nanjing, China, May 23-27, 2016; Agenda Item: 8.8.2; Source: Fujitsu; Title: Considerations on the SPS resource efficiency. [cited by applicant]
R2-163781; 3GPP TSG-RAN WG2 #94; Nanjing, China, May 23-27, 2016; Agenda Item: 8.8.1; Source: Ericsson; Title: Acknowledgements for SPS commands. [cited by applicant]
R2-163916; 3GPP TSG-RAN WG2 Meeting #94; Nanjing, China, May 23-27, 2016; Agenda item: 8.8.1; Source: Huawei, HiSilicon; Title: Discussion on feedback for SPS activation and deactivation. [cited by applicant]
R2-163917; 3GPP TSG-RAN WG2 Meeting #94; Nanjing, China, May 23-27, 2016; Agenda Item: 8.8.2; Source: Huawei, HiSilicon; Title: Implicit SPS release under UL grants skipping. [cited by applicant]
R2-164207; 3GPP TSG-RAN WG2 Meeting #94; Nanjing, China, May 23-27, 2016; Agenda Item: 8.8.1 (LTE_LATRED_L2-Core); Source: LG Electronics Inc.; Title: SPS feedback for SPS release. [cited by applicant]
R2-164217; 3GPP TSG-RAN WG2 Meeting #94; Nanjing, China, May 23-27, 2016; Agenda Item: 8.8.1 (LTE_LATRED_L2-Core); Source: LG Electronics Inc.; Title: Need of feedback for SPS activation. [cited by applicant]
R2-165266; 3GPP TSG-RAN2 Meeting #95; Goteborg, Sweden, Aug. 22-26, 2016; Source: ZTE Corporation; Title: Discussion on the configurable feedback. [cited by applicant]
R2-165267; 3GPP TSG-RAN2 Meeting #95; Goteborg, Sweden, Aug. 22-26, 2016; Source: ZTE Corporation; Title: Discussion on the feedback transmission of SPS release. [cited by applicant]
R2-165354; 3GPP TSG-RAN WG2 #95; Gothenburg, Sweden, May 22-26, 2016; Agenda Item: 8.8; Source: Ericsson; Title: Remaining issues with SPS with skip padding and short periods. [cited by applicant]
R2-165663; 3GPP TSG-RAN WG2 Meeting #95; Gothenburg, Sweden, Aug. 22-26, 2016; Agenda Item: 8.8 (LTE_LATRED_L2-Core); Source: LG Electronics Inc.; Title: Remaining issues on SPS Confirmation MAC CE. [cited by applicant]
R2-165686; 3GPP TSG-RAN2 Meeting #95; Gothenburg, Sweden, Aug. 22-26, 2016; Agenda item: 8.8; Source: Qualcomm Incorporated; Title: Remaining Open Issues for Uplink Skipping. [cited by applicant]
3GPP TS 22.185 V0.2.0 (Feb. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Service requirements for V2X services; Stage 1 (Release 14). [cited by applicant]
3GPP TS 23.203 V13.7.0 (Mar. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Policy and charging control architecture (Release 13). [cited by applicant]
3GPP TS 23.303 V13.3.0 (Mar. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Proximity-based services (ProSe); Stage 2 (Release 13). [cited by applicant]
3GPP TS 24.334 V13.3.1 (Mar. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Proximity-services (ProSe) User Equipment (UE) to Prose function… [cited by applicant]
3GPP TS 29.214 V13.5.0 (Mar. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Policy and Charging Control over Rx reference point, (Release 13… [cited by applicant]
3GPP TS 36.213 V13.2.0 (Jun. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer pr… [cited by applicant]
3GPP TS 36.300 V13.4.0 (Jun. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Univer… [cited by applicant]
3GPP TS 36.321 V13.2.0 (Jun. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Con… [cited by applicant]
3GPP TS 36.331 V13.2.0 (Jun. 2016), Technical Specification, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Co… [cited by applicant]
R1-164878, 3GPP TSG RAN WG1 Meeting #85, Nanjing, China May 23-27, 2016, Source: CMCC, Title: Discussion on SPS configurations. [cited by applicant]
R1-162122, 3GPP TSG RAN WG1 Meeting #84bis, Busan, Korea, Apr. 11-15, 2016, Agenda Item: 7.3.2.2.2, Source: Huawei, HiSilicon, Title: SPS enhancement for V2V. [cited by applicant]
R1-162340, 3GPP TSG RAN WG1 Meeting #84 bis, Busan, Korea, Apr. 11-15, 2016, Source: OPPO, Title: Discussion on the SPS configuration. [cited by applicant]
R1-162413, 3GPP TSG-RAN WG1 Meeting #84bis, Busan, Korea Apr. 11-15, 2016, Source: ZTE, Title: Discussion on V2V SPS resource scheme. [cited by applicant]