IP Library Granted Patent US 12,422,500
Granted Patent B2
US 12,422,500 · App. 18/460,590 · Granted Sep 23, 2025

Method for inspecting a power storage device, method for manufacturing a power storage device, and method for manufacturing a device stack

Inventors: Hiroaki Ikeda (Toyota, JP); Shusaku Goto (Hamamatsu, JP)
Assignees: PRIME PLANET ENERGY & SOLUTIONS, INC.; TOYOTA JIDOSHA KABUSHIKI KAISHA; TOYOTA BATTERY CO., LTD.
G01R31/52G01R31/3835H01M10/44
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,422,500
App. No.
18/460,590
Granted
Sep 23, 2025
Kind
B2
Abstract

A method for inspecting a battery in which an electrode body is accommodated in a case so that the electrode body is insulated from the case by an insulation film includes: adjusting the battery to a first voltage; measuring a first potential difference which is a potential difference between the case and a negative terminal that is exposed outside the case and electrically connected to a negative electrode plate to have a negative-electrode potential; measuring a second potential difference which is a potential difference between the case and the negative electrode plate after a lapse of a standby period of 24 hours or more; and determining whether or not a short circuit exists between the case and the negative electrode plate based on magnitude of the first and second potential differences and a change between the first potential difference and the second potential difference.

Claims (36)

1. A method for inspecting a power storage device comprising a metal case, an electrode body including a positive electrode plate and a negative electrode plate located outside the positive electrode plate in a thickness direction of the positive electrode plate, and an insulation film covering the electrode body to insulate the electrode body from the metal case, the method comprising:

adjusting the power storage device to a first device voltage by charging or discharging the power storage device;

measuring a first potential difference at a first potential difference measuring time after adjusting the power storage device to the first device voltage, the first potential difference being a case-to-negative electrode potential difference generated between the metal case and a negative-electrode potential member that is exposed outside the metal case and is electrically connected to the negative electrode plate to have a negative-electrode potential;

measuring a second potential difference, which is the case-to-negative electrode potential difference, at a second potential difference measuring time after a lapse of a standby period of 24 hours or more from the first potential difference measuring time; and

determining whether or not a case-to-negative electrode short circuit exists between the metal case and the negative electrode plate based on a magnitude of the first potential difference, a magnitude of the second potential difference, and a variation between the first potential difference and the second potential difference.

2. A method for manufacturing a power storage device, comprising the method for inspecting a power storage device according to claim 1 ,

wherein adjusting the power storage device to the first device voltage is to adjust the power storage device to the first device voltage by charging or discharging the power storage device that has undergone initial charge and subsequent charge and discharge, and

measuring the first potential difference, measuring the second potential difference, and determining the case-to-negative electrode short circuit are performed on the power storage device in an individual state.

3. The method for manufacturing a power storage device according to claim 2 , further comprising inspecting a self-discharging state of the power storage device after adjusting the power storage device to the first device voltage,

wherein measuring the first potential difference and measuring the second potential difference are performed within inspecting the self-discharging state.

4. The method for manufacturing a power storage device according to claim 3 , wherein

inspecting the self-discharging state includes:

measuring a pre-leaving device voltage of the power storage device after adjusting the power storage device to the first device voltage;

leaving the power storage device, for which the pre-leaving device voltage has been measured, for a leaving period with terminals in an open state;

measuring a post-leaving device voltage of the power storage device after leaving the power storage device;

checking a self-discharging state of the power storage device using the pre-leaving device voltage and the post-leaving device voltage of the power storage device;

after adjusting the power storage device to the first device voltage but before leaving the power storage device, measuring the first potential difference to be performed in parallel with, before, or after measuring the pre-leaving device voltage; and

after leaving the power storage device but before checking the self-discharging state, measuring the second potential difference to be performed in parallel with, before, or after measuring the post-leaving device voltage, and

the standby period overlaps the leaving period.

5. A method for manufacturing a device stack in which a plurality of the power storage devices are stacked while being insulated from each other, and restrained in a stacking direction by a restraining member, forming a plurality of restrained devices, and the restrained devices are connected with each other,

the method comprising:

restraining the power storage devices while insulating them from each other, using the restraining member, to constitute an unconnected device stack including the restrained devices that are unconnected with each other, and

wherein the method includes the method for inspecting a power storage device according to claim 1 , wherein

adjusting the power storage device to the first device voltage is to adjust the power storage devices to the first device voltage by charging or discharging the power storage devices that have undergone initial charge and subsequent charge and discharge, before restraining the power storage devices, and

measuring the first potential difference, measuring the second potential difference, and determining the case-to-negative electrode short circuit are performed on each of the restrained devices that constitute the unconnected device stack, after restraining the power storage devices.

6. The method for manufacturing a device stack according to claim 5 , further comprising inspecting an in-stack self-discharging state of each of the restrained devices that constitute the unconnected device stack,

wherein measuring the first potential difference and measuring the second potential difference are performed within inspecting the in-stack self-discharging state.

7. The method for manufacturing a device stack according to claim 6 , wherein

inspecting the in-stack self-discharging state includes:

measuring a restraint pre-leaving device voltage of each of the restrained devices after restraining the power storage devices;

leaving the restrained devices, for each of which the restraint pre-leaving device voltage has been measured, for a restraint leaving period with terminals in an open state;

measuring a restraint post-leaving device voltage of each of the restrained devices after leaving the restrained devices;

checking a restraint self-discharging state of each of the restrained devices using the restraint pre-leaving device voltage and the restraint post-leaving device voltage of the corresponding restrained device;

after restraining the storage devices but before leaving the restrained devices, measuring the first potential difference to be performed in parallel with, before, or after measuring the restraint pre-leaving device voltage; and

after leaving the restrained devices but before checking the restraint self-discharging state, measuring the second potential difference to be performed in parallel with, before, or after measuring the restraint post-leaving device voltage, and

the standby period overlaps the restraint leaving period.

Assignments (2)
CHANGE OF NAME Recorded Jan 16, 2025
From: PRIMEARTH EV ENERGY CO., LTD.
To: TOYOTA BATTERY CO., LTD.
Reel/Frame 070226/0103 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 4, 2023
From: IKEDA, HIROAKI; GOTO, SHUSAKU
To: PRIME PLANET ENERGY & SOLUTIONS, INC.; TOYOTA JIDOSHA KABUSHIKI KAISHA; PRIMEARTH EV ENERGY CO., LTD.
Reel/Frame 064785/0721 →
Priority Claims (1)
JP 2022-150808 · Sep 22, 2022 · national
Continuity (1)
Related Publication 20240103096A1 · Mar 28, 2024
References Cited (13)
US 20100308834A1 · Kawai et al. · 2010 [cited by applicant]
US 20160291093A1 · Matsuyama et al. · 2016 [cited by applicant]
US 20190011502A1 · Kobayashi et al. · 2019 [cited by applicant]
US 20190162771A1 · Miyazawa · 2019 [cited by examiner]
US 20200379050A1 · Imanaka · 2020 [cited by examiner]
US 20230198035A1 · Takahashi · 2023 [cited by examiner]
JP 2009070778A · 2009 [cited by applicant]
JP 2014026732A · 2014 [cited by applicant]
JP 2016081712A · 2016 [cited by applicant]
JP 2016192278A · 2016 [cited by applicant]
JP 2016225167A · 2016 [cited by applicant]
JP 2019016558A · 2019 [cited by applicant]
JP 2020072059A · 2020 [cited by applicant]