SYSTEMS AND METHODS FOR GENERATING CONSTRUCTION MODELS FOR CONSTRUCTION PROJECTS

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
18/585,201
Abstract

Provided herein is a construct computing system including a construct computing device including a processor in communication with at least one memory device. The processor is programmed to: (i) receive construction data associated with a construction project, wherein the construction data includes scheduling data, budgeting data, and drawing data, (ii) store, in the memory, the construction data, (iii) generate a schedule and a budget for the construction project based upon the construction data, (iv) receive, from a user computing device, input associated with the construction data, wherein the input includes a modification to at least one of the scheduling data, the budgeting data, and the drawings, and (v) modify at least one of the schedule, the budget, and the drawings based upon the input.

Claims (72)

1 . A construction computing system including a drawings computing device including at least one processor in communication with at least one memory device, the at least one processor programmed to:

store, in the memory, a plurality of construction drawings associated with a construction project;

display, through a drawings application in communication with the drawings computing device, the plurality of construction drawings on a user computing device;

receive, from the user computing device, modifications to at least one construction drawing of the plurality of construction drawings, wherein the modifications are input directly into the drawings application;

store, in the at least one memory, the modifications to the at least one construction drawing;

update the relevant construction drawings based upon the modifications; and

display the modified construction drawings on the user computing device.

2 . The construction computing system of claim 1 , wherein the modification includes a change order, wherein the change order includes a change in scope of the construction project, and wherein the at least one processor is further programmed to:

build the change order based on the modifications;

perform a look-up to determine a supervising user of the user that input the modifications;

prompt the supervising user to approve the change request; and

in response to approval of the change request from the supervising user, modify the construction drawings based upon the modification.

3 . The construction computing system of claim 1 , wherein the modifications include at least one of replacement drawings to replace one or more of the plurality of construction drawings, an annotation marked on the construction drawing, linking a request for information (RFI) to the construction drawing, linking one or more other constructions drawings to the construction drawing, and linking one or more photos stored on the user computing device to the construction drawing.

4 . The construction computing system of claim 1 , wherein the at least one processor is further programmed to:

link the modifications made to each of the construction drawings; and

store the modifications on a blockchain, wherein each modification is a new block of the blockchain.

5 . The construction computing system of claim 1 , wherein the at least one processor is further programmed to:

display, through the drawings application, an overlay of at least one construction drawing over at least one other construction drawing;

compare at least one construction drawing to at least one other construction drawing to determine comparison features between the compared construction drawings; and

display, through the drawings application, the comparison features.

6 . The construction computing system of claim 1 , wherein the construction drawings include classifications, and wherein the at least one processor is further programmed to sort the construction drawings by classification.

7 . The construction computing system of claim 1 , wherein the at least one processor is further programmed to:

analyze the construction drawings;

generate one or more safety observations based upon at least one of the analyzed construction data and input; and

link the safety observations to the construction drawings.

8 . The construction computing system of claim 1 , wherein the at least one processor is further programmed to:

receive a tag for a construction drawing from the user computing device, the tag including at least one of a category of the construction drawing and a folder of the construction drawing; and

sort the plurality of construction drawings by the tags associated with the drawings.

9 . A computer-implemented method implemented by a construct computing system including a construct computing device including at least one processor in communication with at least one memory device, the computer-implemented method comprising:

storing, in the memory, a plurality of construction drawings associated with a construction project;

displaying, through a drawings application in communication with the drawings computing device, the plurality of construction drawings on a user computing device;

receiving, from the user computing device, modifications to at least one construction drawing of the plurality of construction drawings, wherein the modifications are input directly into the drawings application;

storing, in the at least one memory, the modifications to the at least one construction drawing;

updating the relevant construction drawings based upon the modifications; and

displaying the modified construction drawings on the user computing device.

10 . The computer-implemented method of claim 9 , wherein the modification includes a change order, wherein the change order includes a change in scope of the construction project, and wherein the computer-implemented method further comprises:

building the change order based on the modifications;

performing a look-up to determine a supervising user of the user that input the modifications;

prompting the supervising user to approve the change request; and

in response to approval of the change request from the supervising user, modifying the construction drawings based upon the modification.

11 . The computer-implemented method of claim 9 , wherein the modifications include at least one of replacement drawings to replace one or more of the plurality of construction drawings, an annotation marked on the construction drawing, linking a request for information (RFI) to the construction drawing, linking one or more other constructions drawings to the construction drawing, and linking one or more photos stored on the user computing device to the construction drawing.

12 . The computer-implemented method of claim 9 further comprising:

linking the modifications made to each of the construction drawings; and

storing the modifications on a blockchain, wherein each modification is a new block of the blockchain.

13 . The computer-implemented method of claim 9 further comprising:

displaying, through the drawings application, an overlay of at least one construction drawing over at least one other construction drawing;

comparing at least one construction drawing to at least one other construction drawing to determine comparison features between the compared construction drawings; and

displaying, through the drawings application, the comparison features.

14 . The computer-implemented method of claim 9 , wherein the construction drawings include classifications, and wherein the computer-implemented method further comprises sorting the construction drawings by classification.

15 . The computer-implemented method of claim 9 further comprising:

analyzing the construction drawings;

generating one or more safety observations based upon at least one of the analyzed construction data and input; and

linking the safety observations to the construction drawings.

16 . The computer-implemented method of claim 9 further comprising:

receiving a tag for a construction drawing from the user computing device, the tag including at least one of a category of the construction drawing and a folder of the construction drawing; and

sorting the plurality of construction drawings by the tags associated with the drawings.

17 . At least one non-transitory computer-readable media having computer-executable instructions embodied thereon, wherein when executed by a construct computing system including a drawings computing device including at least one processor in communication with at least one memory device, the computer-executable instructions cause the at least one processor to:

store, in the memory, a plurality of construction drawings associated with a construction project;

display, through a drawings application in communication with the drawings computing device, the plurality of construction drawings on a user computing device;

receive, from the user computing device, modifications to at least one construction drawing of the plurality of construction drawings, wherein the modifications are input directly into the drawings application;

store, in the at least one memory, the modifications to the at least one construction drawing;

update the relevant construction drawings based upon the modifications; and

display the modified construction drawings on the user computing device.

18 . The at least one non-transitory computer-readable media of claim 17 , wherein the modification includes a change order, wherein the change order includes a change in scope of the construction project, and wherein the instructions further cause the at least one processor to:

build the change order based on the modifications;

perform a look-up to determine a supervising user of the user that input the modifications;

prompt the supervising user to approve the change request; and

in response to approval of the change request from the supervising user, modify the construction drawings based upon the modification.

19 . The at least one non-transitory computer-readable media of claim 17 , wherein the modifications include at least one of replacement drawings to replace one or more of the plurality of construction drawings, an annotation marked on the construction drawing, linking a request for information (RFI) to the construction drawing, linking one or more other constructions drawings to the construction drawing, and linking one or more photos stored on the user computing device to the construction drawing.

20 . The at least one non-transitory computer-readable media of claim 17 , wherein the instructions further cause the at least one processor to:

link the modifications made to each of the construction drawings; and

store the modifications on a blockchain, wherein each modification is a new block of the blockchain.

Assignments (2)
SECURITY INTEREST Recorded Jul 8, 2026
From: BFS OPERATIONS LLC; WTS PARADIGM, LLC
To: BANK OF AMERICA, N.A. (AS SUCCESSOR TO TRUIST BANK (AS SUCCESSOR BY MERGER TO SUNTRUST BANK)), AS COLLATERAL AGENT
Reel/Frame 075204/0974 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2024
From: KATERRA INC.
To: BFS OPERATIONS LLC
Reel/Frame 066578/0710 →