IP Library Patent Application 18641552
Patent Application
App. No. 18/641,552

METHOD AND SYSTEM FOR MANAGING AN UPLINK SPLIT BEARER

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
18/641,552
Abstract

Described are systems and methods for updating a UL split threshold for a 4G leg and 5G leg for a number of split Data Radio Bearers (DRBs) using a Near-Real Time RIC or 5G Central Unit. A Near-Real Time RIC or 5G Central Unit subscribes to receive UL split threshold parameters from a gNB or eNB E2 node to determine whether to change the values of UL split threshold parameters for UL split DRBs. If so, the UL split threshold parameters are updated at the E2 node and communicated to the UE.

Claims (61)

1 . A method comprising

taking initial values for a UL split threshold for a 4G and 5G leg for a number of split Data Radio Bearers (DRBs), wherein UL split threshold parameters comprise:

an average UL buffer measure for a UE using a Buffer Status Report (BSR) provided by the UE;

a UL data volume at a CU-UP for a DRB of the number of split DRBs;

a UL PRB utilization;

a UL Cell throughput for each UL cell;

subscribing to the UL split threshold parameters from an gNB or eNB E2 node by a near-RT RIC;

detecting, by the E2 node, an RIC event trigger;

analyzing the parameters, by the near-RT RIC, to determine whether to change the values of UL split threshold parameters for some of the number of UL split DRBs, and if so;

updating the UL split threshold parameters at the E2 node; and

communicating the updated UL split threshold parameters to the UE.

2 . The method of claim 1 , further comprising:

computing the average UL buffer measure with the BSR for a UE periodically at a 5G DU for each UL split; and

computing the average UL buffer measure with the BSR for a UE periodically at a 4G DU for each UL split DRB.

3 . The method of claim 2 , further comprising:

communicating the periodically computed the average UL buffer measure for the UE at the 5G DU for each UL split to a 5G CU-CP via an F1-C interface; and

communicating the periodically computed the average UL buffer measure for the UE at the 4G DU for each UL split to the 5G CU-CP via an F1-C interface.

4 . The method of claim 2 , further comprising:

computing the BSR for a corresponding Logical Channel Group ID (LCG ID) in the 4G network and the 5G network;

wherein the 4G DU and the 5G DU each identify the BSR in a buffer size field of the corresponding LCG ID.

5 . The method of claim 2 further comprising:

mapping each of a BSR index (k) to a buffer size in a range (b1,b2] in bytes; and

computing the lower value of the range; or

computing an average of the range (average of b1+1 and b2) while computing average BSR.

6 . The method of claim 1 , further comprising:

informing, by the UE, the BSR for the 4G leg and 5G leg to the respective 4G DU and 5GU;

computing the average BSR at the 4GDU and 5G DU or communicating the BSR to a near-RT-RIC and computing the average BSR at the near-RT-RIC.

7 . The method of claim 2 , wherein an E2 protocol message includes an object for communicating the parameters from the 4G DU and the 5G DU to the near-RT-RIC.

8 . The method of claim 2 , wherein the analyzing the parameters, by the near-RT RIC, to determine whether to dynamically change the values of UL split threshold parameters for some of the number of UL split DRBs comprises:

determining if a BSR average across the 4G leg and the 5G leg for the split DRB for a time interval is above a configured threshold and is high;

determining if a CU-UP data volumes for the split DRB is below a configured threshold; and

reducing the value of the UL split threshold for the DRB and communicating the reduced value to the 4G CU and the 5G CU.

9 . The method of claim 8 , further comprising:

communicating, by the 4G CU, the reduced value to the UE.

10 . The method of claim 2 , further comprising:

analyzing, by the near-RT-RIC, the UL PRB utilization for 4G DU and the 5G DU and identifies the 5G leg or 4G leg where a corresponding scheduler can give the UE optimal UL data transmission.

11 . The method of claim 2 , further comprising:

increasing, by the near-RT RIC, the UL cell throughput when a UL CU-UP data volume starts going up for a DRB or a packet drops at CU-UP for UL cell throughput; or

increasing, by the near-RT RIC, the UL cell throughput when a UL CU-UP data volume starts going up for a DRB or a packet drops at CU-UP for UL cell throughput.

12 . The method of claim 11 , further comprising:

communicating the increased UL cell throughput to a 4GCU, and

communicating, by the 4G CU, the updated UL split threshold to the UE.

13 . The method of claim 2 further comprising:

decreasing, by the near-RT-RIC, the UL split threshold for some DRBs when both a UL cell throughput of 4G cell and a 5G cell is below a configured threshold; or

decreasing, by the near-RT-RIC, the UL split threshold for some DRBs that were sending most of their data via the 5G leg when a UL cell throughput of a 5G UL cell throughput is above a configured threshold and is high and the throughput of 4G UL cell throughput is below a configured threshold and is low.

14 . A method comprising

taking initial values for a UL split threshold for a 4G and 5G leg for a number of split Data Radio Bearers (DRBs), wherein UL split threshold parameters comprise one or more of:

an average UL buffer measure for a UE using a Buffer Status Report (BSR) provided by the UE;

a UL data volume at a CU-UP for a DRB of the number of split DRBs;

a UL PRB utilization; and

a UL Cell throughput for each UL cell;

communicating the UL split threshold parameters to a 5G CU;

analyzing the parameters, by the 5G CU, to determine whether to change the values of UL split threshold parameters for some of the number of UL split DRBs, and if so;

updating the UL split threshold parameters at the 5G CU; and

communicating the updated UL split threshold parameters to the UE.

15 . The method of claim 14 , further comprising:

computing the average UL buffer measure with the BSR for a UE periodically at a 5G DU for each UL split; and

computing the average UL buffer measure with the BSR for a UE periodically at a 4G DU for each UL split DRB.

16 . The method of claim 15 , further comprising:

communicating the periodically computed the average UL buffer measure for the UE at the 5G DU for each UL split to a 5G CU-CP via an F1-C interface; and

communicating the periodically computed the average UL buffer measure for the UE at the 4G DU for each UL split to the 5G CU-CP via an F1-C interface.

Assignments (16)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 9, 2026
From: MAVENIR US INC.
To: MAVENIR SYSTEMS, INC.
Reel/Frame 073728/0317 →
RELEASE OF SECURITY INTEREST IN COLLATERAL RECORDED AT REEL 069113 AND FRAME 0558 Recorded Jul 31, 2025
From: GLAS USA LLC
To: MAVENIR SYSTEMS, INC.
Reel/Frame 072308/0172 →
RELEASE OF SECURITY INTERESTS (SIDECAR) Recorded Jul 29, 2025
From: JPMORGAN CHASE BANK, N.A.
To: MAVENIR SYSTEMS, INC.
Reel/Frame 072263/0041 →
GRANT OF SECURITY INTEREST - PATENTS Recorded Jul 29, 2025
From: MAVENIR NETWORKS, INC.; MAVENIR SYSTEMS, INC.; ARGYLE DATA, INC.; MAVENIR, INC.; AQUTO CORPORATION; MAVENIR IPA UK LIMITED; MAVENIR SYSTEMS UK LIMITED; MAVENIR LTD.; MAVENIR US INC.
To: GLAS USA LLC
Reel/Frame 072245/0764 →
RELEASE OF SECURITY INTERESTS (SYNDICATED) Recorded Jul 29, 2025
From: JPMORGAN CHASE BANK, N.A.
To: MAVENIR SYSTEMS, INC.
Reel/Frame 072263/0121 →
RELEASE OF SECURITY INTEREST IN COLLATERAL RECORDED AT REEL 067565 AND FRAME 0678 Recorded Jul 29, 2025
From: WILMINGTON SAVINGS FUND SOCIETY, FSB
To: MAVENIR SYSTEMS, INC.
Reel/Frame 072263/0421 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2025
From: MAVENIR SYSTEMS, INC.
To: MAVENIR US INC.
Reel/Frame 072245/0580 →
SECURITY INTEREST Recorded Jul 28, 2025
From: MAVENIR NETWORKS, INC.; MAVENIR SYSTEMS, INC.; ARGYLE DATA, INC.; MAVENIR, INC.; AQUTO CORPORATION; MAVENIR IPA UK LIMITED; MAVENIR SYSTEMS UK LIMITED; MAVENIR LTD.; MAVENIR US INC.
To: BLUE TORCH FINANCE LLC
Reel/Frame 072268/0439 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 27, 2025
From: MAVENIR SYSTEMS, INC.
To: MAVENIR US, INC.
Reel/Frame 072245/0419 →
INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Oct 4, 2024
From: MAVENIR SYSTEMS, INC.
To: GLAS USA LLC
Reel/Frame 069113/0558 →
RELEASE OF SECURITY INTEREST Recorded Oct 4, 2024
From: WILMINGTON SAVINGS FUND SOCIETY, FSB
To: MAVENIR SYSTEMS, INC.
Reel/Frame 069113/0596 →
SECURITY INTEREST Recorded Aug 30, 2024
From: MAVENIR SYSTEMS, INC.
To: WILMINGTON SAVINGS FUND SOCIETY, FSB
Reel/Frame 068822/0966 →
INTELLECTUAL PROPERTY SECURITY AGREEMENT SUPPLEMENT Recorded Jul 18, 2024
From: MAVENIR SYSTEMS, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 068425/0209 →
INTELLECTUAL PROPERTY SECURITY AGREEMENT SUPPLEMENT Recorded Jul 18, 2024
From: MAVENIR SYSTEMS, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 068425/0126 →
SECURITY INTEREST Recorded May 29, 2024
From: MAVENIR SYSTEMS, INC.
To: WILMINGTON SAVINGS FUND SOCIETY, FSB
Reel/Frame 067565/0678 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 17, 2024
From: TANEJA, MUKESH; S, SRINIVASAN
To: MAVENIR SYSTEMS, INC.
Reel/Frame 067443/0523 →