IP Library Granted Patent US 12,488,293
Granted Patent B2
US 12,488,293 · App. 18/733,939 · Granted Dec 2, 2025

Managing facility and production operations across enterprise operations to achieve sustainability goals

Inventors: Shashi Menon (Houston, TX); Hemant Arora (Houston, TX); David Seabrook (London, GB); Gian-Marcio Gey (London, GB); Hans Eric Klumpen (Houston, TX); Debasish Das (Houston, TX); Federico Sporleder (Pune, IN); Jing Zhang (Houston, TX); Rajarshi Ray (London, GB); Nader Salman (Houston, TX); Stephanie Lee (Houston, TX); Colin Wier (Houston, TX); Neeraj Kamat (Pune, IN); Harshada Modak (Pune, IN)
Assignee: Schlumberger Technology Corporation
G06Q10/063G06Q10/06315G06Q10/0633G06Q10/0637G06Q10/0639G06Q10/067G06Q50/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,488,293
App. No.
18/733,939
Granted
Dec 2, 2025
Kind
B2
Abstract

A method may include receiving production data and facility data associated with an enterprise, such that the production data includes operational tasks performed in a hydrocarbon production system, and the facility data includes one or more utility operations within one or more buildings associated with the enterprise. The method may also include receiving sustainability parameter data associated with one or more operations corresponding to the enterprise based on the production data and the facility data, generating a sustainability report representative of sustainability parameters associated with the operations of the enterprise based on the sustainability parameter data, and sending the sustainability report to one or more engineering workflow systems to determine action plans associated with improving the sustainability parameters. After receiving the action plans, the method includes sending commands to cause devices to adjust their respective operations.

Claims (66)

1 . A method, comprising:

receiving, via a computing system, production data and facility data associated with an enterprise, wherein the production data comprises information related to one or more operational tasks performed with regard to extracting hydrocarbons from a subsurface region of the earth as part of a hydrocarbon production system, and wherein the facility data comprises additional information related to one or more utility operations within one or more buildings associated with the enterprise;

receiving, via the computing system, sustainability parameter data associated with one or more operations corresponding to the enterprise based on the production data and the facility data, wherein the one or more operations corresponds to the one or more operational tasks and the one or more utility operations;

receiving, via the computing system, sustainability target data corresponding to one or more target values associated with the sustainability parameter data;

generating, via the computing system, a sustainability report representative of one or more sustainability parameters associated with the operations of the enterprise based on the sustainability parameter data;

identifying, via the computing system, one or more engineering workflow systems of a plurality of engineering workflow systems in response to one or more differences between the one or more target values and one or more current values of the sustainability parameter data being greater than one or more thresholds, wherein each of the plurality of engineering workflow systems corresponds to a separate computing device relative to the computing system, and wherein the one or more engineering workflow systems are identified by:

broadcasting a request indicative of the sustainability parameter data to the plurality of engineering workflow systems;

querying a database comprising a list of abatement technologies associated with each of the plurality of engineering workflow systems, wherein each abatement technology of the list corresponds to performing an operation to modify at least one of the one or more current values; and

receiving one or more responses from the one or more engineering workflow systems, wherein the one or more engineering workflow systems are configured to provide the one or more responses based on an association between a respective abatement technology of each of the one or more engineering workflow systems and the sustainability parameter data;

sending, via the computing system, the sustainability report and the sustainability target data to the one or more engineering workflow systems configured to determine one or more action plans associated with improving the one or more sustainability parameters;

receiving, via the computing system, the one or more action plans from the one or more engineering workflow systems; and

automatically sending, via the computing system, one or more commands to a plurality of devices associated with adjusting the one or more operational tasks performed with regard to extracting the hydrocarbons from the subsurface region as part of the hydrocarbon production system, adjusting the one or more utility operations within the one or more buildings, or both, based on the one or more action plans in response to receiving the one or more action plans, wherein the one or more commands are configured to cause the plurality of devices associated with the one or more operational tasks to adjust one or more respective operations to control a flow of hydrocarbons from the subsurface region in response to receiving the one or more commands.

2 . The method of claim 1 , wherein the one or more utility operations comprise one or more operational schedules for one or more lighting systems, one or more irrigation systems, one or more heating/venting and air conditioning (HVAC) systems, one or more plumbing systems, or any combination thereof.

3 . The method of claim 1 , wherein the facility data comprises energy costs data, type of energy resource data, water consumption data, waste cost data, or any combination thereof.

4 . The method of claim 1 , wherein the facility data is acquired from one or more internet-of-things (IoT) devices.

5 . The method of claim 1 , wherein the facility data comprises one or more operational schedules of a plurality of employees that visit the one or more buildings.

6 . The method of claim 1 , wherein the information related to the one or more operational tasks performed in the hydrocarbon production system comprises one or more types of equipment, an arrangement of the equipment, emission data associated with the equipment, or any combination thereof.

7 . The method of claim 1 , comprising:

generating a sustainability model representative of the one or more sustainability parameters associated with the operations of the enterprise over a period of time based on the sustainability report;

determining that the one or more sustainability parameters are less than one or more additional thresholds;

identifying the one or more engineering workflow systems in response to the one or more sustainability parameters being less than the additional one or more thresholds; and

sending one or more requests to provide the one or more action plans to the one or more engineering workflow systems.

8 . The method of claim 7 , wherein the one or more action plans comprise one or more modifications to the one or more operational tasks and the utility operations.

9 . A system, comprising:

a production system configured to produce a plurality of products over time as part of an enterprise;

a plurality of buildings associated with the enterprise; and

a processing system comprising a memory configured to store instructions that cause the processing system to perform operations comprising:

receiving production data and facility data associated with the enterprise, wherein the production data comprises information related to one or more operational tasks performed in the production system, and wherein the facility data comprises additional information related to one or more utility operations within the plurality of buildings associated with the enterprise;

receiving sustainability parameter data associated with one or more operations corresponding to the enterprise based on the production data and the facility data, wherein the one or more operations corresponds to the one or more operational tasks and the one or more utility operations;

receiving sustainability target data corresponding to one or more target values associated with the sustainability parameter data;

generating a sustainability model representative of one or more sustainability parameters associated with the operations of the enterprise based on the sustainability parameter data;

identifying one or more engineering workflow systems of a plurality of engineering workflow systems in response to one or more differences between the one or more target values and one or more current values of the sustainability parameter data being greater than one or more thresholds, wherein each of the plurality of engineering workflow systems corresponds to a computing device, and wherein the one or more engineering workflow systems are identified by:

broadcasting a request indicative of the sustainability parameter data to the plurality of engineering workflow systems;

querying a database comprising a list of abatement technologies associated with each of the plurality of engineering workflow systems, wherein each abatement technology of the list corresponds to performing an operation to modify the one or more current values; and

receiving one or more responses from the one or more engineering workflow systems, wherein the one or more engineering workflow systems are configured to provide the one or more responses based on an association between a respective abatement technology of each of the one or more engineering workflow systems and the sustainability parameters;

sending the sustainability target data to the one or more engineering workflow systems configured to determine one or more action plans associated with improving the one or more sustainability parameters based on the sustainability model;

receiving the one or more action plans from the one or more engineering workflow systems; and

automatically sending one or more commands to a plurality of devices associated with controlling one or more operational parameters of the one or more operational tasks within the production system, adjusting the one or more utility operations within the plurality of buildings, or both, based on the one or more action plans in response to receiving the one or more action plans, wherein the one or more commands are configured to cause the plurality of devices associated with the one or more operational tasks to adjust the one or more operational parameters to control production of the plurality of products in response to receiving the one or more commands.

10 . The system of claim 9 , wherein the one or more commands correspond to adjusting one or more operational schedules for one or more lighting systems, one or more irrigation systems, one or more heating/venting and air conditioning (HVAC) systems, one or more plumbing systems, or any combination thereof of the plurality of buildings.

11 . The system of claim 9 , wherein the facility data comprises energy costs data, type of energy resource data, water consumption data, waste cost data, or any combination thereof, and wherein the one or more commands correspond to modifying one or more operational schedules associated with equipment operated in the production system.

12 . The system of claim 11 , wherein the equipment comprises an electro-submersible pump, a variable speed drive, or both.

13 . The system of claim 9 , wherein the production system corresponds to hydraulic fracturing operations.

14 . The system of claim 13 , wherein the one or more sustainability parameters corresponds to greenhouse gas emissions associated with a plurality of trucks being used in the hydraulic fracturing operations.

15 . The system of claim 9 , comprising:

determining that the one or more sustainability parameters are less than one or more additional thresholds based on the sustainability model; and

identifying the one or more engineering workflow systems in response to the one or more sustainability parameters being less than the one or more additional thresholds.

16 . The system of claim 9 , wherein the one or more action plans comprise one or more modifications to the one or more operational tasks and the utility operations.

17 . A non-transitory computer-readable medium comprising computer-executable instructions configured to cause a computing system to perform operations comprising:

receiving production data and facility data associated with an enterprise, wherein the production data comprises information related to one or more operational tasks performed in a production system, and wherein the facility data comprises additional information related to one or more utility operations within a plurality of buildings associated with the enterprise;

receiving sustainability parameter data associated with one or more operations corresponding to the enterprise based on the production data and the facility data, wherein the one or more operations corresponds to the one or more operational tasks and the one or more utility operations;

receiving sustainability target data corresponding to one or more target values associated with the sustainability parameter data;

generating a sustainability model representative of one or more sustainability parameters associated with the operations of the enterprise based on the sustainability parameter data;

identifying one or more engineering workflow systems of a plurality of engineering workflow systems in response to one or more differences between the one or more target values and one or more current values of the sustainability parameter data being greater than one or more thresholds, wherein each of the plurality of engineering workflow systems corresponds to a separate computing device relative to the computing system, and wherein the one or more engineering workflow systems are identified by:

broadcasting a request indicative of the sustainability parameter data to the plurality of engineering workflow systems;

querying a database comprising a list of abatement technologies associated with each of the plurality of engineering workflow systems, wherein each abatement technology of the list corresponds to performing an operation to modify the one or more current values; and

receiving one or more responses from the one or more engineering workflow systems, wherein the one or more engineering workflow systems are configured to provide the one or more responses based on an association between a respective abatement technology of each of the one or more engineering workflow systems and the one or more differences;

sending the sustainability target data to the one or more engineering workflow systems configured to determine one or more action plans associated with improving the one or more sustainability parameters based on the sustainability model;

receiving the one or more action plans from the one or more engineering workflow systems; and

automatically sending one or more commands to a plurality of devices associated with controlling one or more operational parameters of the one or more operational tasks within the production system, adjusting the one or more utility operations within the plurality of buildings, or both, based on the one or more action plans in response to receiving the one or more action plans, wherein the one or more commands are configured to cause the plurality of devices associated with the one or more operational tasks to adjust the one or more operational parameters in response to receiving the one or more commands.

18 . The non-transitory computer-readable medium of claim 17 , wherein the one or more commands correspond to:

adjusting one or more operational schedules for one or more lighting systems, one or more irrigation systems, one or more heating/venting and air conditioning (HVAC) systems, one or more plumbing systems, or any combination thereof of the plurality of buildings; and

modifying one or more additional operational schedules associated with equipment operated in the production system.

19 . The non-transitory computer-readable medium of claim 18 , wherein the production data comprises sensor data acquired via one or more greenhouse gas sensors.

20 . The non-transitory computer-readable medium of claim 17 , comprising:

determining that the one or more sustainability parameters are less than one or more additional thresholds based on the sustainability model; and

identifying the one or more engineering workflow systems in response to the one or more sustainability parameters being less than the one or more additional thresholds.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 31, 2024
From: MENON, SHASHI; ARORA, HEMANT; SEABROOK, DAVID; GEY, GIAN-MARCIO; KLUMPEN, HANS ERIC; DAS, DEBASISH; SPORLEDER, FEDERICO; ZHANG, JING; RAY, RAJARSHI; SALMAN, NADER; LEE, STEPHANIE; WIER, COLIN; KAMAT, NEERAJ; MODAK, HARSHADA
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 069280/0395 →
Continuity (2)
Provisional Application 63471174 · Jun 5, 2023
Related Publication 20240403777A1 · Dec 5, 2024
References Cited (85)
US 7584165B2 · Buchan · 2009 [cited by applicant]
US 8112300B2 · Harper · 2012 [cited by applicant]
US 10339478B2 · Grant · 2019 [cited by applicant]
US 10373085B1 · Baghdikian · 2019 [cited by applicant]
US 12028274B1 · Krishnaiah et al. · 2024 [cited by applicant]
US 20070078692A1 · Vyas · 2007 [cited by applicant]
US 20080077371A1 · Yeten · 2008 [cited by applicant]
US 20110061295A1 · McAlister · 2011 [cited by applicant]
US 20110320054A1 · Brzezowski · 2011 [cited by examiner]
US 20120271669A1 · Taper · 2012 [cited by applicant]
US 20130098049A1 · Kraemer et al. · 2013 [cited by applicant]
US 20160350778A1 · Levine et al. · 2016 [cited by applicant]
US 20170051681A1 · Arias Chao · 2017 [cited by applicant]
US 20170097616A1 · Cozad et al. · 2017 [cited by applicant]
US 20170321656A1 · Eisenberger · 2017 [cited by applicant]
US 20180231967A1 · Cohen · 2018 [cited by applicant]
US 20180266241A1 · Ferguson · 2018 [cited by examiner]
US 20190257544A1 · Alanqar et al. · 2019 [cited by applicant]
US 20190335674A1 · Basso · 2019 [cited by applicant]
US 20190340709A1 · Elbsat et al. · 2019 [cited by applicant]
US 20190370690A1 · Anderson · 2019 [cited by applicant]
US 20190385244A1 · Stelmar Netto · 2019 [cited by applicant]
US 20210200169A1 · Ploegert et al. · 2021 [cited by applicant]
US 20210238971A1 · Crumpton · 2021 [cited by applicant]
US 20210372864A1 · Tao et al. · 2021 [cited by applicant]
US 20210388717A1 · Srinivasan · 2021 [cited by applicant]
US 20220027810A1 · Murthy · 2022 [cited by applicant]
US 20220044336A1 · Whikehart · 2022 [cited by applicant]
US 20220065834A1 · Gadot et al. · 2022 [cited by applicant]
US 20220076182A1 · Vollmert et al. · 2022 [cited by applicant]
US 20220230250A1 · Kawamori · 2022 [cited by applicant]
US 20220243570A1 · Xiao · 2022 [cited by examiner]
US 20220284519A1 · Pancholi et al. · 2022 [cited by applicant]
US 20220290554A1 · Al Saad · 2022 [cited by applicant]
US 20220325887A1 · Wang et al. · 2022 [cited by applicant]
US 20220343229A1 · Gruber · 2022 [cited by applicant]
US 20220343433A1 · Yan · 2022 [cited by applicant]
US 20220404050A1 · Chang et al. · 2022 [cited by applicant]
US 20230070672A1 · Yarkony · 2023 [cited by applicant]
US 20230075128A1 · Yarkony · 2023 [cited by applicant]
US 20230077807A1 · Chidambaram et al. · 2023 [cited by applicant]
US 20230085641A1 · Jones · 2023 [cited by examiner]
US 20230152763A1 · Davis · 2023 [cited by examiner]
US 20230193791A1 · Katterbauer · 2023 [cited by applicant]
US 20230222388A1 · Cella · 2023 [cited by applicant]
US 20230325606A1 · Mahendravarman et al. · 2023 [cited by applicant]
US 20230350387A1 · Davis et al. · 2023 [cited by applicant]
US 20230351300A1 · Nielsen · 2023 [cited by examiner]
US 20230385299A1 · Al Rasheed et al. · 2023 [cited by applicant]
US 20240067884A1 · Rooney et al. · 2024 [cited by applicant]
US 20240281826A1 · Mallet · 2024 [cited by examiner]
US 20240328303A1 · Arukhe · 2024 [cited by applicant]
US 20240403765A1 · Menon · 2024 [cited by applicant]
US 20240403778A1 · Menon · 2024 [cited by applicant]
US 20240403782A1 · Menon · 2024 [cited by applicant]
US 20240403784A1 · Menon · 2024 [cited by applicant]
US 20240403791A1 · Menon · 2024 [cited by applicant]
US 20240403893A1 · Menon · 2024 [cited by applicant]
CN 110110904 · 2019 [cited by applicant]
CN 113969774 · 2022 [cited by examiner]
CN 114565319 · 2022 [cited by applicant]
CN 115563757 · 2023 [cited by applicant]
KR 101993366 · 2019 [cited by applicant]
WO 2009152553 · 2009 [cited by applicant]
WO 2016196351 · 2016 [cited by applicant]
WO 2020263693 · 2020 [cited by applicant]
WO 2023009865 · 2023 [cited by applicant]
WO 2023017164 · 2023 [cited by applicant]
WO 2023033832 · 2023 [cited by applicant]
WO WO2023154091A1 · 2023 [cited by examiner]
A. Farajzadeh, R., et al. “Life-cycle production optimization of hydrocarbon fields: thermoeconomics perspective.” Sustainable Energy & Fuels 3.11 (2019): 3050-3060. (Year: 2019). [cited by examiner]
Farsan et al., “Value Change in the Value Chain: Best Practices in Scope 3 Greenhouse Gas Management”, Climate-KIC, Version 3.0, Nov. 2018. (Year: 2018), 44 pages. [cited by applicant]
Non-Final Office Action issued in U.S. Appl. No. 18/733,951 on Aug. 8, 2024; 19 pages. [cited by applicant]
Non-Final Office Action issued in U.S. Appl. No. 18/734,079 on Aug. 27, 2024; 28 pages. [cited by applicant]
Non-Final Office Action issued in U.S. Appl. No. 18/733,942 on Aug. 13, 2024; 15 pages. [cited by applicant]
Wikipedia, “Internet of Things”, https://en.wikipedia.org/wiki/Internet_of_things; accessed Aug. 8, 2024, 5 pages. (Year: 2022). [cited by applicant]
International Search Report and Written Opinion issued in International Patent Application No. PCT/US2024/032503 on Sep. 13, 2024; 12 pages. [cited by applicant]
International Search Report and Written Opinion issued in International Patent Appl. No. PCT/US2024/032506 on Sep. 11, 2024, 10 pages. [cited by applicant]
International Search Report and Written Opinion issued in International Patent Appl. No. PCT/US2024/032490 on Sep. 27, 2024, 13 pages. [cited by applicant]
International Search Report and Written Opinion issued in International Patent Appl. No. PCT/US2024/032483 on Sep. 27, 2024, 9 pages. [cited by applicant]
Non-Final Office Action issued in U.S. Appl. No. 18/734,238 on Sep. 24, 2024; 29 pages. [cited by applicant]
International Search Report and Written Opinion issued in International Patent Appl. No. PCT/US2024/032475 on Sep. 30, 2024, 10 pages. [cited by applicant]
International Search Report and Written Opinion issued in International Patent Appl. No. PCT/US2024/032499 on Sep. 19, 2024; 13 pages. [cited by applicant]
International Search Report and Written Opinion issued in International Patent Appl. No. PCT/US2024/032492 on Sep. 27, 2024; 13 pages. [cited by applicant]
Sipola, J. et al., “Adopting artificial intelligence in sustainable business”, Journal of Cleaner Production, 2023, 426, 8 pages. [cited by applicant]