IP Library Granted Patent US 12,370,599
Granted Patent B2
US 12,370,599 · App. 18/882,384 · Granted Jul 29, 2025

Treating cooling water in iron production facilities, and associated systems, devices, and methods

Inventors: John Francis Quanci (Haddonfield, NJ); John Michael Richardson (Devon, PA); Patrick James Mullarkey (Manhattan, IL); David James Schwake (Aurora, IL); Andrew Michael Butor (Cranberry Township, PA); Jonathan Hale Perkins (Lisle, IL); Chun Wai Choi (Lisle, IL)
Assignee: SUNCOKE TECHNOLOGY AND DEVELOPMENT LLC
B22F1/05B22D41/12B22F9/04B22F9/08B61D7/02B61D7/32B61D17/18B61K13/00C02F1/52C21B7/14C21B13/0006C21C5/52C21C7/0006C21C7/0075C21C7/064C21C7/068C22C33/006C22C33/0264C22C33/0271C22C38/002C22C38/02C22C38/04G01G13/006B22F2009/001B22F2009/0808B22F2301/35B22F2304/15B22F2998/10B22F2999/00B61D7/00C02F2103/16C02F2301/02Y10T428/2982
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,370,599
App. No.
18/882,384
Granted
Jul 29, 2025
Kind
B2
Abstract

Treating cooling water in industrial production facilities and associated systems, devices, and methods are disclosed herein. The system can comprise a cooling tower with a first and second cell, each having a housing to receive return water and a sump below to maintain supply water configured to directly contact molten metal. The system includes an inlet and an inlet line to provide return water to the cooling tower and an outlet and an outlet line to direct supply water back to the industrial production facility. The inlet, outlet, and cooling tower form a closed-loop network. Additionally, a blowdown line is fluidically coupled to the outlet to divert a portion of the supply water away from the closed-loop network.

Claims (55)

1. A system for treating cooling water in an industrial production facility, the system comprising:

a cooling tower including a first cell and a second cell, each of the first and second cells including:

a housing positioned to receive a return water, and

a sump below the housing and configured to maintain a level of a supply water, wherein, in operation, (i) the supply water is in direct contact with molten metal from the industrial production facility, and (ii) the molten metal has a temperature of at least 1050° C. prior to contacting the supply water;

an inlet comprising an inlet line positioned to provide the return water to the cooling tower;

an outlet comprising an outlet line positioned to direct the supply water toward the industrial production facility, wherein the inlet, the outlet, and the cooling tower form a loop; and

a blowdown line fluidically coupled to the outlet and configured to direct a portion of the supply water away from the loop at a flow rate between 1,000 and 12,000 gallons per minute,

wherein the cooling tower is configured to operate for at least 12 hours continuously.

2. The system of claim 1 , wherein the return water is configured to include particles having a particle size between 0.1 micron and 20 microns.

3. The system of claim 1 , wherein the industrial production facility is configured to produce granulated metal via a granulator, and wherein the supply water of the outlet line directly contacts the granulated metal.

4. The system of claim 1 , further comprising a valve arrangement configured to isolate the return water and/or the supply water from the first cell.

5. The system of claim 4 , wherein the valve arrangement is a first valve arrangement, the system further comprising a second valve arrangement configured to isolate the return water and/or the supply water from the second cell.

6. The system of claim 1 , wherein the blowdown line is configured to direct the portion of the supply water to an external system not fluidically coupled to the cooling tower.

7. The system of claim 1 , further comprising a blowdown treatment system fluidically coupled to the blowdown line and including a flocculant supply configured to introduce a flocculant into the portion of the supply water.

8. The system of claim 1 , further comprising a cooling tower water treatment system fluidically coupled to a makeup line and including a dispersant supply configured to introduce a dispersant into a makeup water.

9. The system of claim 1 , wherein the cooling tower further comprises a third cell adjacent the second cell, a fourth cell adjacent the third cell, and a fifth cell adjacent the fourth cell.

10. The system of claim 1 , wherein each of the first and second cells further includes a basin below the sump and configured to collect settled solids from the supply water.

11. A system for treating cooling water in an industrial production facility, the system comprising:

a cooling tower including a basin, a first cell, and a second cell, each of the first and second cells including:

a housing positioned to receive a return water, and

a sump below the housing and configured to maintain a level of a supply water, wherein, in operation, (i) the supply water is in direct contact with molten metal from the industrial production facility, and (ii) the molten metal has a temperature of at least 1050° C. prior to contacting the supply water, wherein the housing and/or the sump of the cooling tower define a perimeter,

wherein the basin includes a first region associated with the first cell and a second region associated with the second cell, wherein the first region and/or the second region extends beyond the perimeter;

an inlet comprising an inlet line positioned to provide the return water to the cooling tower;

an outlet comprising an outlet line positioned to direct the supply water toward the industrial production facility, wherein the inlet, the outlet, and the cooling tower form a loop; and

a blowdown line fluidically coupled to the outlet and configured to direct a portion of the supply water away from the loop.

12. A system of for treating cooling water in an industrial production facility, the system comprising:

a cooling tower including a first cell and a second cell, each of the first and second cells including:

a housing positioned to receive a return water, and

a sump below the housing and configured to maintain a level of a supply water, wherein, in operation, (i) the supply water is in direct contact with molten metal from the industrial production facility, and (ii) the molten metal has a temperature of at least 1050° C. prior to contacting the supply water;

a trough below the sump of the cooling tower and extending across a length of the cooling tower including the first cell and the second cell;

an inlet comprising an inlet line positioned to provide the return water to the cooling tower;

an outlet comprising an outlet line positioned to direct the supply water toward the industrial production facility, wherein the inlet, the outlet, and the cooling tower form a loop; and

a blowdown line fluidically coupled to the outlet and configured to direct a portion of the supply water away from the loop.

13. A method for treating cooling water in an industrial production facility, the method comprising:

receiving a return water at a first cell and a second cell of a cooling tower;

cooling the return water via the cooling tower to produce a supply water in a sump of the cooling tower for at least 12 hours continuously;

directing a first portion of the supply water from the cooling tower to directly contact metal in the industrial production facility and produce the return water; and

directing a second portion of the supply water toward an external area not fluidically coupled to the cooling water at a flow rate between 1,000 and 12,000 gallons per minute.

14. The method of claim 13 , further comprising:

measuring a flow rate of the second portion of the supply water; and

introducing a makeup water into the cooling tower at a flow rate at least equivalent to the flow rate measured.

15. The method of claim 13 , wherein the ratio of the second portion of the supply water to metal produced in the industrial production facility is between 100 and 5000 gallons of supply water per ton of metal produced.

16. The method of claim 13 , wherein the ratio of the first portion of the supply water to metal produced in the industrial production facility is between 100 and 5000 gallons of supply water per ton of metal produced.

17. The method of claim 13 , further comprising directing a makeup water from a cooling water treatment system toward the cooling tower at a flow rate between 1,000 and 12,000 gallons per minute.

18. A system for treating cooling water in an iron production facility, the system comprising:

a cooling tower including a first cell and a second cell, each of the first and second cells including:

a housing positioned to receive a return water, and

a sump below the housing and configured to maintain a level of a supply water configured to be in direct contact with molten iron;

an inlet comprising an inlet line positioned to provide the return water to the cooling tower;

an outlet comprising an outlet line positioned to direct the supply water toward the iron production facility, wherein the inlet, the outlet, and the cooling tower form a loop;

a blowdown line fluidically coupled to the outlet and configured to direct a portion of the supply water away from the loop at a flow rate between 1,000 and 12,000 gallons per minute; and

a controller configured to monitor the loop,

wherein the cooling tower is configured to operate for at least 12 hours continuously.

19. The system of claim 1 , wherein the supply water within the loop is turned over between every 100 and 500 minutes.

20. The system of claim 1 , wherein a ratio of (i) the portion of the supply water directed away from the loop to (ii) metal produced in the industrial production facility is at least 100 gallons per ton of metal produced.

Assignments (2)
SECURITY INTEREST Recorded Jul 25, 2025
From: SUNCOKE TECHNOLOGY AND DEVELOPMENT LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 072254/0272 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 12, 2024
From: QUANCI, JOHN FRANCIS; RICHARDSON, JOHN MICHAEL; MULLARKEY, PATRICK JAMES; SCHWAKE, DAVID JAMES; BUTOR, ANDREW MICHAEL; PERKINS, JONATHAN HALE; CHOI, CHU WAI
To: SUNCOKE TECHNOLOGY AND DEVELOPMENT LLC
Reel/Frame 069571/0471 →
Continuity (2)
Provisional Application 63581946 · Sep 11, 2023
Related Publication 20250083980A1 · Mar 13, 2025
References Cited (90)
US 2052783A · Mart · 1936 [cited by examiner]
US 3316075A · Grady · 1967 [cited by applicant]
US 3548919A · Gyongyos et al. · 1970 [cited by applicant]
US 3720404A · Carlson et al. · 1973 [cited by applicant]
US 3810542A · Gloster · 1974 [cited by examiner]
US 3888956A · Klint · 1975 [cited by applicant]
US 3898037A · Lange · 1975 [cited by examiner]
US 3923935A · Cates · 1975 [cited by examiner]
US 4139369A · Kandler et al. · 1979 [cited by applicant]
US 4153965A · Merly · 1979 [cited by applicant]
US 4294784A · Mailund · 1981 [cited by applicant]
US 4402884A · Koike et al. · 1983 [cited by applicant]
US 4416707A · Foster et al. · 1983 [cited by applicant]
US 4546907A · Kemble · 1985 [cited by applicant]
US 4694886A · Sakaguchi · 1987 [cited by applicant]
US 4786322A · Green · 1988 [cited by applicant]
US 4893568A · Adams · 1990 [cited by applicant]
US 5017218A · Lundström et al. · 1991 [cited by applicant]
US 5084093A · Yamaoka et al. · 1992 [cited by applicant]
US 5458671A · Butler et al. · 1995 [cited by applicant]
US 5552058A · Fanning · 1996 [cited by examiner]
US 5673779A · Spickelmire · 1997 [cited by applicant]
US 6041906A · Howard · 2000 [cited by applicant]
US 6287362B1 · Levey et al. · 2001 [cited by applicant]
US 8646700B2 · Lundström et al. · 2014 [cited by applicant]
US 9840746B2 · Lundström · 2017 [cited by applicant]
US 10486234B2 · Lundström · 2019 [cited by applicant]
US 10618112B2 · Lundström · 2020 [cited by applicant]
US 20010002535A1 · Liebig · 2001 [cited by examiner]
US 20020026967A1 · Buenemann, Jr. et al. · 2002 [cited by applicant]
US 20030015315A1 · Atsushi et al. · 2003 [cited by applicant]
US 20030164062A1 · Lundstrom et al. · 2003 [cited by applicant]
US 20050133192A1 · Meszaros et al. · 2005 [cited by applicant]
US 20090015028A1 · Zamorano Jones · 2009 [cited by applicant]
US 20090171512A1 · Duncan · 2009 [cited by examiner]
US 20130180360A1 · Kim et al. · 2013 [cited by applicant]
US 20150330725A1 · Gurney · 2015 [cited by examiner]
US 20200122237A1 · Kemper et al. · 2020 [cited by applicant]
CN 1847411A · 2006 [cited by applicant]
CN 101301683A · 2008 [cited by applicant]
CN 102700957A · 2012 [cited by applicant]
CN 103661440B · 2016 [cited by applicant]
CN 205496553U · 2016 [cited by applicant]
CN 107385135A · 2017 [cited by applicant]
CN 207205279U · 2018 [cited by applicant]
CN 212049627U · 2020 [cited by applicant]
CN 112305944A · 2021 [cited by applicant]
CN 113549715A · 2021 [cited by applicant]
CN 214470214U · 2021 [cited by applicant]
CN 113828788A · 2021 [cited by applicant]
CN 114433854A · 2022 [cited by applicant]
CN 216709283U · 2022 [cited by applicant]
CN 115417184A · 2022 [cited by applicant]
CN 115889716A · 2023 [cited by applicant]
CN 116550982A · 2023 [cited by applicant]
GB 1287510A · 1972 [cited by applicant]
JP H02236212A · 1990 [cited by applicant]
JP H06212212A · 1994 [cited by applicant]
JP 2001107118A · 2001 [cited by applicant]
JP 2002282866A · 2002 [cited by applicant]
JP 2005154847A · 2005 [cited by applicant]
JP 2020164992A · 2020 [cited by applicant]
JP 7033949B2 · 2022 [cited by applicant]
JP 2022149432A · 2022 [cited by applicant]
KR 20010111750A · 2001 [cited by applicant]
KR 100370611B1 · 2003 [cited by applicant]
KR 100847667B1 · 2008 [cited by applicant]
KR 101086315B1 · 2011 [cited by applicant]
KR 101091977B1 · 2011 [cited by applicant]
KR 20130076110A · 2013 [cited by applicant]
KR 20140102742A · 2014 [cited by applicant]
KR 20140120631A · 2014 [cited by applicant]
KR 20160034000A · 2016 [cited by applicant]
KR 101649584B1 · 2016 [cited by applicant]
KR 20230028951A · 2023 [cited by applicant]
WO 2007105039A2 · 2007 [cited by applicant]
“Granulation of Hot Metal,” by 360 Editor, Apr. 23, 2018, 4 pages. [cited by applicant]
Beskow et al., “Industrial and High-Capacity Production of Granulated Pig Iron,” Association for Iron & Steel Technology, AISTech, May 6-9, 2019, pp. 485-493. [cited by applicant]
Beskow et al., “World's First High-capacity Granshot@ Iron Granulation in Operation at SSAB Oxelosund,” AISTech 2009 Proceedings—vol. I, pp. 211-218. [cited by applicant]
Dupon et al., “Granshot Iron Granulation for Optimized Plant Logistics,” METEC InSteelCon Jun. 27-Jul. 1, 2011, Düsseldorf, Germany; 7 pages. [cited by applicant]
Granulated Pig Iron (GPI), International Iron Metallics Association, accessed Sep. 17, 2024 from https://www.metallics.org/gpi.html; 4 pages. [cited by applicant]
Industrial and High Capacity Granulation of Pig Iron, Data Sheet, Uvån Hagfors Teknologi AB, Jun. 2019, 4 pages. [cited by applicant]
Love et al., “Energy Recovery in Granshot©—Process,” KTH Industrial Engineering and Management, Stockholm, Sweden, Nov. 25, 2008, 70 pages. [cited by applicant]
Lundstrom et al., “Pig Iron Granulation at Iscor Saldanha Steel,” AISTech 2004 Proceedings—vol. I, pp. 517-524. [cited by applicant]
Lundstrom, P. “Iron Granulation in Integrated Steel Plants,” Nordic Steel & Mining Review 2006, pp. 16-17. [cited by applicant]
Polanco et al., “Granulation Methods for Metals and Ferroalloys,” pp. 401-410. In: 72nd ABM Annual Congress, São Paulo, 2017. [cited by applicant]
Vesterberg et al., “Granulated metal product from direct tapped furnace—experience from operation at Befesa Sweden,” ATS-JSI Conference, Dec. 17-18, 2012, Paris, France, 2 pages. [cited by applicant]
International Iron Metallics Association (IIMA), “Use of Granulated Pig Iron (GPI) in the Electric Arc Furnace (EAF),” downloaded Nov. 30, 2024, dated 2018 (no month) (two pages) [wayback machine date of Feb. 9, 2022]. [cited by applicant]
International Search Report and Written Opinion for International Application No. PCT/US2024/046280; Date of Mailing: Dec. 20, 2024; 10 pages. [cited by applicant]
Italimpianti Orafi, “Atomized metal powder: the revolution of the precious metals market,” Online article, May 20, 2021; 2 pages. [cited by applicant]