IP Library Granted Patent US 12,624,649
Granted Patent B2
US 12,624,649 · App. 19/047,318 · Granted May 12, 2026

Hydrogen fueled electric power plant with thermal energy storage

Inventor: William M. Conlon (Palo Alto, CA)
Assignee: PINTAIL POWER, LLC
F01K1/10F01K3/186F01K15/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,624,649
App. No.
19/047,318
Granted
May 12, 2026
Kind
B2
Abstract

The invention relates generally to methods and apparatus for operation of hydrogen fueled electric power plants integrated with thermal energy storage. It is an object of this invention to reduce the cost of providing reliable electricity from variable renewable energy sources by storing excess renewable energy and using the stored renewable energy to reduce the quantity of fuel required, to reduce the cost of producing hydrogen fuel by electrolysis, and to produce and store hydrogen at the power plant to eliminate the cost of transporting hydrogen and the need to upgrade natural gas pipelines and pipeline compressors.

Claims (43)

1 . A combined cycle power plant comprising:

a combustion turbine generator configured to combust a fuel comprising hydrogen gas to generate electricity and produce hot exhaust gases;

a second heat source, different from the combustion turbine;

a thermal energy storage system configured to store heat from the second heat source;

a steam turbine generator configured to expand superheated steam across a steam turbine to generate electricity;

a feedwater reservoir configured to store feedwater condensed from steam exhausted from the steam turbine;

a boiler configured to boil feedwater from the feedwater reservoir with heat exclusively from the thermal energy storage system to produce steam and to provide a portion of the steam to heat the feedwater reservoir;

a superheater configured to heat steam produced in the boiler with heat exclusively from the thermal energy storage system to produce the superheated steam; and

an electrically powered electrolyzer configured to electrolyze steam produced in the boiler to produce the hydrogen gas.

2 . The combined cycle power plant of claim 1 , wherein the fuel consists essentially of the hydrogen gas.

3 . The combined cycle power plant of claim 1 , wherein the fuel comprises methane mixed with the hydrogen gas.

4 . The combined cycle power plant of claim 1 , comprising:

a compressor configured to compress the hydrogen gas produced in the electrolyzer; and

a hydrogen storage tank configured to store hydrogen gas compressed by the compressor for subsequent combustion in the combustion turbine generator.

5 . The combined cycle power plant of claim 1 , wherein the electrolyzer is electrically connected to be powered by electricity generated by the steam turbine generator.

6 . The combined cycle power plant of claim 1 , wherein the electrolyzer is or comprises a solid oxide electrolyzer.

7 . The combined cycle power plant of claim 1 , wherein the second heat source is an electrically powered heater.

8 . The combined cycle power plant of claim 1 , wherein the thermal energy storage system comprises a molten salt.

9 . The combined cycle power plant of claim 1 , wherein the electrolyzer is fluidly coupled to electrolyze steam produced in the boiler and not further heated before reaching the electrolyzer.

10 . The combined cycle power plant of claim 9 , wherein:

the electrolyzer is or comprises a solid oxide electrolyzer;

the second heat source is an electrically powered heater; and

the thermal energy storage system comprises a molten salt.

11 . The combined cycle power plant of claim 1 , wherein the electrolyzer is fluidly coupled to electrolyze steam produced in the boiler and superheated by heat exchange with the hydrogen produced in the electrolyzer.

12 . The combined cycle power plant of claim 11 , wherein:

the electrolyzer is or comprises a solid oxide electrolyzer;

the second heat source is an electrically powered heater; and

the thermal energy storage system comprises a molten salt.

13 . The combined cycle power plant of claim 1 , wherein the electrolyzer is fluidly coupled to electrolyze steam produced in the boiler, superheated in the superheater, and extracted partially expanded from the steam turbine generator.

14 . The combined cycle power plant of claim 13 , wherein:

the electrolyzer is or comprises a solid oxide electrolyzer;

the second heat source is an electrically powered heater; and

the thermal energy storage system comprises a molten salt.

15 . The combined cycle power plant of claim 1 , wherein the electrolyzer is fluidly coupled to electrolyze steam produced in the boiler, superheated in the superheater, extracted partially expanded from the steam turbine generator, and reheated by heat exchange with the hydrogen produced in the electrolyzer.

16 . The combined cycle power plant of claim 15 , wherein:

the electrolyzer is or comprises a solid oxide electrolyzer;

the second heat source is an electrically powered heater; and

the thermal energy storage system comprises a molten salt.

17 . The combined cycle power plant of claim 1 , wherein the electrolyzer is fluidly coupled to electrolyze steam produced in the boiler, superheated in the superheater, and bypassing the steam turbine generator.

18 . The combined cycle power plant of claim 17 , wherein:

the electrolyzer is or comprises a solid oxide electrolyzer;

the second heat source is an electrically powered heater; and

the thermal energy storage system comprises a molten salt.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 5, 2025
From: CONLON, WILLIAM M.
To: PINTAIL POWER, LLC
Reel/Frame 070409/0182 →
Continuity (4)
Continuation 18230914 · Aug 7, 2023
Continuation In Part PCTUS2022015417 · Feb 7, 2022
Provisional Application 63147044 · Feb 8, 2021
Related Publication 20250361822A1 · Nov 27, 2025
References Cited (34)
US 5444972A · Moore · 1995 [cited by examiner]
US 7491309B2 · Peter et al. · 2009 [cited by applicant]
US 8203225B2 · Devine · 2012 [cited by applicant]
US 8286431B2 · Briesch et al. · 2012 [cited by applicant]
US 8327641B2 · Freund · 2012 [cited by examiner]
US 9238598B2 · Hammad · 2016 [cited by examiner]
US 9885257B2 · Bergins et al. · 2018 [cited by applicant]
US 10458284B2 · Apte · 2019 [cited by examiner]
US 11181041B2 · Smith et al. · 2021 [cited by applicant]
US 11670960B2 · Hunt et al. · 2023 [cited by applicant]
US 11753993B1 · Terwilliger et al. · 2023 [cited by applicant]
US 11867092B2 · Broy et al. · 2024 [cited by applicant]
US 12129773B2 · Conlon · 2024 [cited by examiner]
US 12146424B2 · O'Donnell · 2024 [cited by examiner]
US 12176117B2 · Cheatham, III · 2024 [cited by examiner]
US 12221903B2 · Conlon · 2025 [cited by applicant]
US 20060204801A1 · Sandaker · 2006 [cited by applicant]
US 20080047502A1 · Morse · 2008 [cited by applicant]
US 20080127647A1 · Leitner · 2008 [cited by examiner]
US 20080163618A1 · Paul · 2008 [cited by applicant]
US 20120102950A1 · Turchi · 2012 [cited by applicant]
US 20130147197A1 · Goebel · 2013 [cited by examiner]
US 20140203557A1 · Kim · 2014 [cited by applicant]
US 20150329979A1 · Reytier et al. · 2015 [cited by applicant]
US 20160017800A1 · Simpson · 2016 [cited by applicant]
US 20180245485A1 · Conlon · 2018 [cited by applicant]
US 20190226462A1 · Conlon · 2019 [cited by applicant]
US 20190264582A1 · Hinders · 2019 [cited by applicant]
DE 1020122149072B4 · 2015 [cited by applicant]
JP H1172028A · 1999 [cited by applicant]
WO 2022170161A1 · 2022 [cited by applicant]
Machine Translation, DE102012214907B4, May 21, 2015, Siemens AG, 17 pages. [cited by applicant]
The extended European Search Report, EP22750513, 8-Dec. 16, 2024, 9 pages. [cited by applicant]
From the USPTO as the ISA, Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration, PCT/US2022/015417, May 11, 2022, 9 pages. [cited by applicant]