IP Library Patent Application 19194919
Patent Application
App. No. 19/194,919

LIFECYCLE MANAGEMENT FOR INFORMATION TECHNOLOGY INFRASTRUCTURE

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
19/194,919
Abstract

A method for managing an information technology infrastructure is provided. The method may include generating a workspace configured to maintain configurations for the information technology infrastructure. A configuration file specifying configurations to apply to the information technology infrastructure may be merged into the workspace. An execution plan may be generated based on the workspace. The execution plan may include operations to apply, to the information technology infrastructure, the configurations specified in the configuration file. The configurations may be applied, based on the execution plan, by at least provisioning, modifying, and/or de-provisioning one or more resources at the information technology infrastructure. Related systems and articles of manufacture, including computer program products, are also provided.

Claims (7)

1 . A system, comprising:

at least one data processor; and

at least one memory storing instructions which, when executed by the at least one data processor, result in operations comprising:

generating a first workspace and a second workspace, the first workspace configured to maintain a first set of configurations for an information technology infrastructure, and the second workspace configured to maintain a second set of configurations for the information technology infrastructure;

merging, into the first workspace and/or the second workspace, a configuration file specifying one or more configurations to apply to the information technology infrastructure;

generating, based at least on the first workspace and/or the second workspace, an execution plan that includes one or more operations to apply, to the information technology infrastructure, the one or more configurations specified in the configuration file; and

applying, based at least on the execution plan, the one or more configurations including by at least provisioning, modifying, and/or de-provisioning one or more resources at the information technology infrastructure.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 16, 2025
From: HASHICORP, INC.
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 072265/0943 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 30, 2025
From: HASHIMOTO, MITCHELL; DADGAR, ARMON; HINZE, PAUL
To: HASHICORP
Reel/Frame 071143/0462 →