IP Library Granted Patent US 8,862,280
Granted Patent B1
US 8,862,280 · App. 13/425,195 · Granted Oct 14, 2014

Dynamic load curtailment system and method

Inventors: Danny K. Dyess (Roanoke, VA); Armand J. Tamagni, Jr. (Troutville, VA); Mark W. Vinson (Roanoke, VA)
Assignee: GridPoint, Inc.
H02J3/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,862,280
App. No.
13/425,195
Granted
Oct 14, 2014
Kind
B1
Abstract

A system that dynamically learns the optimum energy consumption operating condition for a building and monitors/controls energy consuming equipment to keep the peak demand interval at a minimum. The algorithm employs two separate control schemes, one for HVAC loads and one for non-HVAC loads, and uses historical peak demand measurements in its real-time limiting strategy. The algorithm continuously attempts to reduce peak demand within user configured parameters. When a new peak is inevitable, the algorithm removes and/or introduces loads to limit the new peak magnitude and places the operating conditions within the user configured parameters. The algorithm can examine the previous seven days of metering information to identify a peak demand interval, use real-time load information to predict the demand peak of the upcoming interval, and curtail loads in order to limit the demand peak so as not to set a new peak.

Claims (21)

1. A method of load curtailment for a facility, comprising:

examining a number of previous days of metering information to identify a demand peak target, wherein the examining step comprises

calculating a target total facility KW value such that the target total facility KW is the greater of:

a first proportion times recent total facility demand peak, where recent total facility demand peak is equal to the highest total facility demand value for the number of previous days, and

a second proportion times recent occupied average total facility load, where recent occupied average total facility load is equal to the average value of total facility load during occupied hours for the number of previous days;

utilizing real-time load information to predict the demand peak of the upcoming interval; and,

strategically curtailing assigned loads in order to limit the demand peak so as not to set a new peak;

whereby an automated tuning operation is created and the building operates with improved efficiency.

2. The method of load curtailment in accordance with claim 1 , wherein the first proportion is 0.95.

3. The method of load curtailment in accordance with claim 1 , wherein the second proportion is 1.05.

4. The method of load curtailment in accordance with claim 1 , wherein the first and second proportions are configurable.

5. The method of load curtailment in accordance with claim 1 , wherein the number of previous days of metering information is configurable.

6. The method of load curtailment in accordance with claim 1 , wherein the number of previous days of metering information that is examined is seven.

7. Computer program process code, tangibly stored on at least one non-transitory computer readable medium, the computer program process code comprising instructions implementing a method for using a computing device to perform dynamic load curtailment, comprising instructions for:

examining a number of previous days of metering information to identify a demand peak target, wherein the examining step comprises

calculating a target total facility KW value such that the target total facility KW is the greater of:

a first proportion times recent total facility demand peak, where recent total facility demand peak is equal to the highest total facility demand value for the number of previous days, and

a second proportion times recent occupied average total facility load, where recent occupied average total facility load is equal to the average value of total facility load during occupied hours for the number of previous days;

utilizing real-time load information to predict the demand peak of the upcoming interval; and,

strategically curtailing assigned loads in order to limit the demand peak so as not to set a new peak;

whereby an automated tuning operation is created and the building operates with improved efficiency.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE PREVIOUSLY RECORDED AT REEL: 048834 FRAME: 0274. ASSIGNOR(S) HEREBY CONFIRMS THE RELEASE OF SECURITY INTEREST. Recorded Apr 25, 2019
From: MCHENRY LLC
To: GRIDPOINT, INC
Reel/Frame 049009/0882 →
SECURITY INTEREST Recorded Apr 9, 2019
From: MCHENRY LLC
To: GRIDPOINT, INC
Reel/Frame 048834/0274 →
SECURITY AGREEMENT Recorded Jan 28, 2014
From: GRIDPOINT, INC.
To: MCHENRY LLC
Reel/Frame 032133/0617 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 31, 2012
From: DYESS, DANNY K.; TAMAGNI, ARMAND J., JR; VINSON, MARK W.
To: GRIDPOINT, INC.
Reel/Frame 028307/0174 →
Continuity (2)
Provisional Application 61496422 · Jun 13, 2011
Provisional Application 61496431 · Jun 13, 2011