IP Library Granted Patent US 9,024,621
Granted Patent B2
US 9,024,621 · App. 13/436,821 · Granted May 5, 2015

System and method for mounting components within a utility meter

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,024,621
App. No.
13/436,821
Granted
May 5, 2015
Kind
B2
Abstract

An embodiment of a system includes a utility meter having an enclosure, a first component and a second component in the enclosure, and a mounting assembly configured to couple the first and second components together in the enclosure. The mounting assembly includes a first mount having first and second prongs disposed about an intermediate space, a second mount configured to extend bi-directionally into the intermediate space between the first and second prongs in opposite first and second directions, and a snap-fit fastener. The snap-fit fastener includes first and second snap portions configured to bi-directionally engage one another in the opposite first and second directions to secure the first and second mounts.

Claims (27)

1. A system, comprising:

a utility meter, comprising:

an enclosure;

a first component disposed within the enclosure;

a first mount coupled to the first component, the first mount comprising a first and a second prong extending substantially parallel to each other, separated by a distance, and defining an intermediate space therebetween, wherein at least one of the first prong or the second prong comprises a first snap portion;

a second mount configured to extend into the intermediate space between the first and second prongs, wherein the second mount comprises a second snap portion configured to engage with the first snap portion, wherein one of the first or second snap portions comprises a detent and the other one of the first or second snap portions comprises a recess or a hole; and

a second component coupled to the second mount.

2. The system of claim 1 , wherein the first and second prongs comprise first and second cantilevered prongs that extend along one another about the intermediate space.

3. The system of claim 2 , wherein the first and second cantilevered prongs are configured to absorb vibration.

4. The system of claim 1 , wherein the second mount comprises a terminal blade configured to conduct electricity.

5. The system of claim 1 , wherein the first component is a sensor.

6. The system of claim 5 , wherein the utility meter is an electric meter, and the second component is a terminal blade configured to conduct electricity.

7. The system of claim 1 , wherein the first snap portion comprises a detent and the second snap portion comprises a recess or hole.

8. The system of claim 1 , wherein the first component comprises a sensor having an annular structure defining a central region, the first and second prongs are disposed in the central region, and the second component having the second mount is configured to extend into the intermediate space between the first and second prongs in the central region.

9. A system, comprising:

a utility meter comprising a mounting assembly configured to couple first and second components, the mounting assembly comprising a first mount having first and second cantilevered prongs extending substantially parallel to one another and defining a space between the first cantilevered prong and the second cantilevered prong, at least one of the first and second cantilevered prongs comprises a first snap portion of a snap-fit fastener, the first and second cantilevered prongs are configured to receive a second mount into the intermediate space between the first cantilevered prong and the second cantilevered prong, and the first snap portion is configured to engage a second snap portion of the second mount to secure the first and second mounts, wherein one of the first or second snap portions comprises a detent and the other one of the first or second snap portions comprises a recess or a hole.

10. The system of claim 9 , wherein the first and second cantilevered prongs are configured to absorb vibration.

11. The system of claim 9 , wherein the mounting assembly is configured to align the second component within a central region of the first component.

12. The system of claim 9 , wherein the first component is coupled to the first mount, wherein the first component is a sensor.

13. The system of claim 12 , comprising a second component coupled to the second mount, wherein the second mount is a terminal blade configured to conduct electricity.

14. The system of claim 9 , comprising a utility meter comprising the mounting assembly.

15. The system of claim 9 , wherein the first component is a sensor.

16. The system of claim 15 , wherein the sensor has an annular structure, defining a central region.

17. A method, comprising:

receiving a second mount into an intermediate space between first and second prongs of a first mount the first and second prongs extending substantially parallel to one another, wherein the first and second mounts support first and second component;

engaging first and second snap portions to secure the first and second mounts, wherein at least one of the first or second prongs of the first mount comprises the first snap portion, and the second mount comprises the second snap portion, mounting the first component and the second component in a utility meter; and aligning the second component within a central region of the first component, wherein the first component comprises a sensor and the second component comprises a terminal blade configured to conduct electricity.

18. The method of claim 17 , comprising absorbing vibration with the first and second prongs.

Assignments (8)
TERMINATION AND RELEASE OF PATENT SECURITY AGREEMENT Recorded Mar 5, 2018
From: PNC BANK, NATIONAL ASSOCIATION
To: MRH METERS LLC
Reel/Frame 046117/0792 →
RELEASE OF SECURITY INTEREST Recorded Feb 5, 2018
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: ACLARA TECHNOLOGIES LLC; ACLARA METERS LLC
Reel/Frame 045245/0231 →
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Aug 30, 2016
From: CERBERUS BUSINESS FINANCE, LLC
To: ACLARA TECHNOLOGIES LLC; ACLARA METERS LLC F/K/A MRH METERS LLC
Reel/Frame 039880/0908 →
SECURITY AGREEMENT Recorded Aug 30, 2016
From: ACLARA TECHNOLOGIES LLC; ACLARA METERS LLC
To: MORGAN STANLEY SENIOR FUNDING, INC., AS COLLATERAL AGENT
Reel/Frame 039872/0227 →
CHANGE OF NAME Recorded Feb 18, 2016
From: MRH METERS LLC
To: ACLARA METERS LLC
Reel/Frame 037852/0418 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 30, 2015
From: GENERAL ELECTRIC COMPANY
To: MRH METERS LLC (F/K/A LJF METERS LLC)
Reel/Frame 037398/0877 →
SECURITY INTEREST Recorded Dec 22, 2015
From: MRH METERS LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 037359/0375 →
PATENT SECURITY AGREEMENT Recorded Dec 22, 2015
From: MRH METERS LLC
To: CERBERUS BUSINESS FINANCE, LLC, AS AGENT
Reel/Frame 037362/0603 →