IP Library Granted Patent US 9,325,021
Granted Patent B2
US 9,325,021 · App. 14/252,672 · Granted Apr 26, 2016

Systems and methods for selective cell and/or stack control in a flowing electrolyte battery

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,325,021
App. No.
14/252,672
Granted
Apr 26, 2016
Kind
B2
Abstract

The invention provides in various embodiments methods and systems relating to controlling energy storage units in flowing electrolyte batteries.

Claims (22)

1. A method for individual stack control in a flowing electrolyte battery including at least a first battery cell stack and a second battery cell stack interconnected with each other and sharing a common flowing electrolyte, the method comprising the steps of:

individually controlling a charging condition of the first battery cell stack, at least by regulating a duty cycle of a first control signal to one or more first switches, based at least in part on information regarding an operating condition of the first battery cell stack; and

individually controlling a charging condition of the second battery cell stack, at least by regulating a duty cycle of a second control signal to one or more second switches, based at least in part on information regarding an operating condition of the second battery cell stack.

2. The method of claim 1 , wherein:

the step of individually controlling the charging condition of the first battery cell stack comprises increasing the charging condition of the first battery cell stack;

the step of individually controlling the charging condition of the second battery cell stack comprises decreasing the charging condition of the second battery cell stack while continuing to charge the second battery cell stack; and

the steps of individually controlling the charging condition of the first battery cell stack and individually controlling the charging condition of the second battery cell stack are performed simultaneously.

3. The method of claim 1 , wherein:

the step of individually controlling the charging condition of the first battery cell stack comprises holding the charging condition of the first battery cell stack substantially constant;

the step of individually controlling the charging condition of the second battery cell stack comprises changing the charging condition of the second battery cell stack; and

the steps of individually controlling the charging condition of the first battery cell stack and individually controlling the charging condition of the second battery cell stack are performed simultaneously.

4. The method of claim 1 , wherein:

the step of individually controlling the charging condition of the first battery cell stack comprises stripping the first battery cell stack;

the step of individually controlling the charging condition of the second battery cell stack comprises controlling the charging condition of the second battery cell stack without stripping the second battery cell stack; and

the steps of individually controlling the charging condition of the first battery cell stack and individually controlling the charging condition of the second battery cell stack are performed simultaneously.

5. The method of claim 1 , wherein the operating condition of the first battery cell stack is selected from the group consisting of current flow in the first battery cell stack, voltage of the first battery cell stack, present charge capacity of the first battery cell stack, temperature of at least a portion of the first battery cell stack, an internal resistance of the first battery cell stack, and electrolyte leak information regarding the first battery cell stack.

6. The method of claim 1 , wherein the operating condition of the first battery cell stack includes electrode plating rate in the first battery cell stack.

7. The method of claim 1 , wherein the operating condition of the first battery cell stack includes a load demand for a load for which the flowing electrolyte battery is tasked with providing power.

8. The method of claim 1 , wherein the operating condition of the first battery cell stack includes a state of a primary power source to a load for which the flowing electrolyte battery is tasked with providing power.

9. The method of claim 1 , wherein the operating condition of the first battery cell stack includes a status of electrolyte flow to the first battery cell stack.

10. The method of claim 1 , wherein the operating condition of the first battery cell stack includes a chemical composition of an electrolyte available to the first battery cell stack.

11. The method of claim 1 , wherein the operating condition of the first battery cell stack includes stack weight for the first battery cell stack.

Assignments (6)
RELEASE OF SECURITY INTEREST Recorded Dec 29, 2020
From: VANTAGEPOINT VENTURE PARTNER 2006 (Q), L.P.
To: VIONX ENERGY CORPORATION
Reel/Frame 054767/0755 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 14, 2020
From: VIONX ENERGY CORPORATION
To: VXE (ABC), LLC
Reel/Frame 054639/0719 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 14, 2020
From: VXE (ABC), LLC
To: LARGO ENERGY LIMITED
Reel/Frame 054639/0856 →
CHANGE OF NAME Recorded Dec 14, 2020
From: LARGO ENERGY LIMITED
To: LARGO CLEAN ENERGY CORP.
Reel/Frame 054749/0388 →
SECURITY INTEREST Recorded Apr 6, 2017
From: VIONX ENERGY CORPORATION
To: VANTAGEPOINT VENTURE PARTNERS 2006 (Q), L.P.
Reel/Frame 041873/0546 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 5, 2015
From: PREMIUM POWER CORPORATION
To: VIONX ENERGY CORPORATION
Reel/Frame 035841/0364 →