IP Library Granted Patent US 9,694,521
Granted Patent B2
US 9,694,521 · App. 14/665,494 · Granted Jul 4, 2017

Ozone adhesion process for insulating container manufacture

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,694,521
App. No.
14/665,494
Granted
Jul 4, 2017
Kind
B2
Abstract

Systems and methods for improving adhesion of an insulating foam to a molded polymeric insulating structure through use of ozone gas for functionalization of molded polymeric surfaces of an internal cavity of the insulating structure.

Claims (56)

1. A method of manufacturing an insulating container, comprising:

molding an external structure of the insulating container from a polymer, the external structure comprising:

an inner trough;

an outer shell coupled to the inner trough by a top edge surface;

an internal cavity spaced between the inner trough and the outer shell and extending around four sides and a base of the external structure;

a first opening extending into the internal cavity at a first corner of a base surface of the outer shell;

a second opening extending into the internal cavity at a second corner, opposite the first corner, of the base surface of the outer shell;

positioning the external structure such that the second opening is above the first opening;

injecting an ozone gas containing 5-7.5% ozone into the first opening;

filling at least 80% of the cavity with the ozone gas to displace a mass of air out through the second opening;

flushing the cavity with air to remove ozone gas from the cavity; and

filling the cavity with an insulating foam.

2. The method of claim 1 , wherein a volume flow rate of the ozone gas into the first opening is such that a volume of the cavity is filled in at least 4 minutes.

3. The method of claim 1 , wherein a volume flow rate of the ozone gas into the first opening is such that a volume of the cavity is filled in at most 10 minutes.

4. The method of claim 1 , wherein the flushing the cavity with air further comprises flushing for at least 2 minutes.

5. The method of claim 1 , wherein the flushing the cavity with air to remove ozone gas comprises removing at least 95% of the ozone gas from the cavity.

6. The method of claim 1 , wherein the flushing the cavity with air to remove ozone gas comprises removing at least 97% of the ozone gas from the cavity.

7. The method of claim 1 , wherein the flushing the cavity with air to remove ozone gas comprises removing at least 99% of the ozone gas from the cavity.

8. The method of claim 1 , wherein the molding of the external structure utilizes a rotational molding process.

9. The method of claim 1 , wherein the polymer is polyethylene.

10. The method of claim 1 , wherein the insulating foam is polyurethane.

11. The method of claim 1 , wherein the ozone gas is injected at room temperature.

12. The method of claim 1 , wherein the outer shell has a substantially cuboidal shape.

13. A method for producing an insulating structure, comprising:

(a) molding an outer shell of the insulating structure from a polymer, the outer shell comprising:

an internal cavity;

a first opening extending into the internal cavity;

a second opening extending into the internal cavity;

(b) positioning the outer shell such that the second opening is above the first opening;

(c) injecting an ozone gas containing 5-7.5% ozone into the first opening;

(d) filling the cavity with the ozone gas to displace a mass of air out through the second opening;

(e) at a time after step (d), filling the cavity with a gas to remove at least 97% of the ozone gas from the cavity; and

(f) injecting an insulating foam into the cavity.

14. The method of claim 13 , wherein a volume flow rate of the ozone gas into the first opening is such that a volume of the cavity is filled in at least 4 minutes.

15. The method of claim 13 , wherein a volume flow rate of the ozone gas into the first opening is such that a volume of the cavity is filled in approximately 4-10 minutes.

16. The method of claim 13 , wherein step (e) begins approximately 4 to 10 minutes after step (c) began.

17. The method of claim 13 , wherein step (e) is completed within no more than two minutes after step (e) began.

18. The method of claim 13 , wherein step (d) of filling the cavity with the ozone gas to displace a mass of air out through the second opening comprises filling at least 90% of the cavity with ozone gas.

19. The method of claim 13 , wherein step (d) of filling the cavity with the ozone gas to displace a mass of air out through the second opening comprises filling at least 95% of the cavity with ozone gas.

20. The method of claim 13 , wherein the molding of the outer shell utilizes a rotational molding process.

21. The method of claim 13 , wherein the polymer is polyethylene.

22. The method of claim 13 , wherein the gas is air.

23. The method of claim 13 , wherein the first opening is adjacent a bottom portion of the internal cavity and the second opening is adjacent a top portion of the internal cavity.

24. A method for manufacturing a cooler, comprising:

(a) molding an external structure of the cooler from polyethylene, the external structure comprising:

an inner trough;

an outer shell coupled to the inner trough by a top edge surface;

an internal cavity spaced between the inner trough and the outer shell and extending around four sides and a base of the external structure;

a first opening extending into the internal cavity at a first corner of a base surface of the outer shell;

a second opening extending into the internal cavity at a second corner, opposite the first corner, of the base surface of the outer shell;

(b) positioning the external structure such that the second opening is above the first opening;

(c) injecting an ozone gas containing 5-7.5% ozone into the first opening;

(d) filling at least 90% of the cavity with the ozone gas in at least four minutes to displace a mass of air out through the second opening;

(e) flushing the cavity with air for at least two minutes to remove ozone gas from the cavity; and

(f) filling the cavity with polyurethane insulating foam.

25. The method of claim 24 , wherein the outer shell has a substantially cuboidal shape.

Assignments (2)
SECURITY AGREEMENT Recorded May 20, 2016
From: YETI COOLERS, LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 038765/0066 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 13, 2015
From: FRENCH, JOHN; LAXAMANA, FRANCIS; ADARLO, ARGEL; NUGENT, PAUL
To: YETI COOLERS, LLC
Reel/Frame 035393/0659 →