IP Library Granted Patent US 11,486,804
Granted Patent B1
US 11,486,804 · App. 17/846,945 · Granted Nov 1, 2022

Device for simulating full-scale pile-sinking process of static pressure pile by air bag preloading and test method thereof

Inventors: Yonghong Wang (Qingdao, CN); Mingyi Zhang (Qingdao, CN); Jun Wang (Qingdao, CN); Bo Han (Qingdao, CN); Jiangbin Wu (Qingdao, CN); Chuantong Zhang (Qingdao, CN); Xiang Fang (Qingdao, CN); Yishun Jiang (Qingdao, CN); Yuning Ge (Qingdao, CN); Qijun Zhang (Qingdao, CN); Weihui Tian (Qingdao, CN); Yan Li (Qingdao, CN); Xun Zhu (Qingdao, CN); Baochang Zhang (Qingdao, CN); Guodong Shao (Qingdao, CN)
Assignees: QINGDAO UNIVERSITY OF TECHNOLOGY; Qingdao Green Technology Geotechnical Engineering Co., Ltd.; China State Construction Zhongxin Construction Engineering Co., Ltd. Shandong Branch; Shandong Luqiao Group Co., Ltd., Jinan, China; Zhongji Jiurui Geotechnical Engineering Co., Ltd.
G01N3/12E02B17/027G01N2203/0048
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,486,804
App. No.
17/846,945
Granted
Nov 1, 2022
Kind
B1
Abstract

Provided are a device for simulating a full-scale pile-sinking process of a static pressure pile by air bag preloading and a test method thereof. The device comprises a frame, a beam, a hydraulic jack, a model box, a model pile, a first sand layer, an undisturbed soil mass, a second sand layer, a rubber pad, a forcing air bag, a counter-force steel plate, a model box top cover, a forcing pipe, a pressure relief pipe, a steel casing and a control system. The first sand layer, the undisturbed soil mass, the second sand layer, the rubber pad, the forcing air bag and the counter-force steel plate are laid in the model box in sequence; and the steel casing passes through the model box top cover, the counter-force steel plate, the forcing air bag and the rubber pad in sequence and then reaches a bottom portion of the second sand layer.

Claims (15)

1. A device for simulating a full-scale pile-sinking process of a static pressure pile by air bag preloading, comprising a frame formed by surrounding a plurality of counter-force frames ( 1 ), a beam ( 3 ) connected between adjacent counter-force frames ( 1 ), a hydraulic jack ( 2 ) mounted on the beam ( 3 ), a model box ( 4 ) located inside the frame, a model pile ( 5 ) pressed by the hydraulic jack ( 2 ), a first sand layer ( 71 ), an undisturbed soil mass ( 13 ), a second sand layer ( 72 ), a rubber pad ( 6 ), a forcing air bag ( 10 ), a counter-force steel plate ( 9 ), a model box top cover ( 15 ) covered on an upper surface of the model box ( 4 ), a forcing pipe ( 11 ) and a pressure relief pipe ( 12 ) which are both connected with the forcing air bag ( 10 ), a steel casing ( 8 ), and a control system ( 14 ) connected with both the hydraulic jack ( 2 ) and the forcing air bag ( 10 ), wherein the first sand layer ( 71 ), the undisturbed soil mass ( 13 ), the second sand layer ( 72 ), the rubber pad ( 6 ), the forcing air bag ( 10 ) and the counter-force steel plate ( 9 ) are laid in the model box ( 4 ) in sequence; the steel casing ( 8 ) passes through the model box top cover ( 15 ), the counter-force steel plate ( 9 ), the forcing air bag ( 10 ) and the rubber pad ( 6 ) in sequence and then reaches a bottom portion of the second sand layer ( 72 ); and the model pile ( 5 ) is inserted into the steel casing ( 8 ) to contact with a surface layer of the undisturbed soil mass ( 13 ).

2. The device for simulating the full-scale pile-sinking process of the static pressure pile by air bag preloading according to claim 1 , wherein the beam ( 3 ) is connected between adjacent counter-force frames ( 1 ) through a guide sliding sleeve.

3. The device for simulating the full-scale pile-sinking process of the static pressure pile by air bag preloading according to claim 1 , wherein two forcing pipes ( 11 ) and two pressure relief pipes ( 12 ) which are oppositely arranged and extend in opposite directions are both provided.

4. The device for simulating the full-scale pile-sinking process of the static pressure pile by air bag preloading according to claim 1 , wherein the rubber pad ( 6 ), the forcing air bag ( 10 ), the counter-force steel plate ( 9 ) and the model casing top cover ( 15 ) are all provided with a pile position hole ( 5 - 1 ) for the model pile ( 5 ) to pass through.

5. The device for simulating the full-scale pile-sinking process of the static pressure pile by air bag preloading according to claim 1 , wherein the counter-force steel plate ( 9 ) and the model casing top cover ( 15 ) are both provided with a forcing pipe position hole ( 11 - 1 ) and a pressure relief pipe position hole ( 12 - 1 ) for the forcing pipe ( 11 ) and the pressure relief pipe ( 12 ) to pass through respectively.

6. The device for simulating the full-scale pile-sinking process of the static pressure pile by air bag preloading according to claim 1 , wherein the first sand layer ( 71 ) and the second sand layer ( 72 ) are both a sand layer with a thickness no less than 50 mm.

7. A test method of the device for simulating the full-scale pile-sinking process of the static pressure pile by air bag preloading according to claim, comprising the following steps of:

surrounding the plurality of counter-force frames ( 1 ) to form the frame, slidably connecting the beam ( 3 ) between adjacent counter-force frames ( 1 ), placing the model box ( 4 ) in the frame, and fixing the hydraulic jack ( 2 ) on the beam ( 3 ) and positioning the hydraulic jack above the model box ( 4 );

paving the first sand layer ( 71 ) on the bottom portion of the model box ( 4 ) firstly, then placing the undisturbed soil mass ( 13 ) in the model box ( 4 ), and finally covering the second sand layer ( 72 ) on the undisturbed soil mass ( 13 );

covering the rubber pad ( 6 ), the forcing air bag ( 10 ) and the counter-force steel plate ( 9 ) on a surface of the second sand layer ( 72 ) in sequence firstly, and then respectively penetrating the forcing pipe ( 11 ) and the pressure relief pipe ( 12 ) which are connected with the forcing air bag ( 10 ) through the counter-force steel plate ( 9 );

arranging the model box top cover ( 15 ) on the model box ( 4 ), and respectively penetrating the forcing pipe ( 11 ) and the pressure relief pipe ( 12 ) through the model box top cover ( 15 );

coating lubricating oil on an inner wall of the steel casing ( 8 ) firstly, penetrating the steel casing ( 8 ) through the model box top cover ( 15 ), the counter-force steel plate ( 9 ), the forcing air bag ( 10 ) and the rubber pad ( 6 ) in sequence to reach the bottom portion of the second sand layer ( 72 ); then grabbing the sand layer in the steel casing ( 8 ) and avoiding disturbing the undisturbed soil mass ( 13 ) below the second sand layer ( 72 ); and finally inserting the model pile ( 5 ) into the steel casing ( 8 ) to contact with the surface layer of the undisturbed soil mass ( 13 ); and

connecting both the hydraulic jack ( 2 ) and the forcing air bag ( 10 ) with the control system ( 14 ), and controlling a pile pressing force and an upper layer soil weight in the pile-sinking process.

8. The test method of the device for simulating the full-scale pile-sinking process of the static pressure pile by air bag preloading according to claim 7 , wherein the undisturbed soil mass ( 13 ) is placed in the model box ( 4 ) and avoided from being disturbed.

9. The test method of the device for simulating the full-scale pile-sinking process of the static pressure pile by air bag preloading according to claim 7 , further comprising the step of: through multiple tests, simulating pile pressing processes at different depths by changing the undisturbed soil mass in the model box ( 4 ) and a pressure of the forcing air bag ( 10 ), and finally simulating the whole pile pressing process by superimposing results of the multiple tests.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 22, 2022
From: WANG, YONGHONG; ZHANG, MINGYI; WANG, JUN; HAN, BO; WU, JIANGBIN; ZHANG, CHUANTONG; FANG, XIANG; JIANG, YISHUN; GE, YUNING; ZHANG, QIJUN; TIAN, WEIHUI; LI, YAN; ZHU, XUN; ZHANG, BAOCHANG; SHAO, GUODONG
To: QINGDAO UNIVERSITY OF TECHNOLOGY; QINGDAO GREEN TECHNOLOGY GEOTECHNICAL ENGINEERING CO., LTD.; CHINA STATE CONSTRUCTION ZHONGXIN CONSTRUCTION ENGINEERING CO., LTD. SHANDONG BRANCH; SHANDONG LUQIAO GROUP CO., LTD., JINAN, CHINA; ZHONGJI JIURUI GEOTECHNICAL ENGINEERING CO., LTD.
Reel/Frame 061188/0788 →
Priority Claims (1)
CN 202210479564.2 · May 5, 2022 · national