IP Library Granted Patent US 11,588,439
Granted Patent B1
US 11,588,439 · App. 17/972,863 · Granted Feb 21, 2023

Solar forecasting for networked power plants

Inventors: Lukas Hansen (El Dorado Hills, CA); Gautham Ramesh (San Francisco, CA)
Assignee: 8ME NOVA, LLC
H02S50/00H02J3/004H02J3/381H02J13/00001H02J2300/24
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,588,439
App. No.
17/972,863
Granted
Feb 21, 2023
Kind
B1
Abstract

A method may include obtaining irradiance data at a first time and a second time from sensors, determining whether one or more solar modules of a plurality of networked power plants will be covered by a shadow or shade at a third time based on the irradiance data, and generating, based on the determination, a power output prediction for each power plant of the networked power plants at the third time. The method may further include receiving power delivery profiles for first and second loads, adjusting a power output of one or more power plants of the networked power plants based at least in part on the power output prediction and the power delivery profiles for the first and second loads, and allocating a combined power output of the power plants to the first and second loads based on first and second load reliability thresholds.

Claims (40)

1. A method comprising:

determining a power output capability of a first renewable energy power plant (REPP);

determining a power output capability of a second REPP;

setting a power output for the first REPP and a power output for the second REPP based on a power delivery profile for the first and second loads and power output capabilities of the first and second REPPs;

allocating a combined power output of the first and second REPPs to the first and second loads for a time period;

transmitting a first indication of a first portion of the combined output for the time period to the first load and a second indication of a second portion of the combined output for the time period to the second load; and

subsequent to transmitting the first indication and the second indication, delivering the allocated combined power output to a grid.

2. The method of claim 1 , wherein the first load receives more power from the grid than indicated in the first indication during the time period.

3. The method of claim 2 , further comprising recording a difference between the first indication and a total amount of power received from the grid during the time period.

4. The method of claim 1 , wherein allocating the combined power output of the first and second REPPs to the first and second loads for the time period comprises allocating the combined power output of the first and second REPPs according to a ranking of the first and second loads.

5. The method of claim 4 , wherein allocating the combined power output of the first and second REPPs to the first and second loads according to the ranking of the first and second loads comprises satisfying the power delivery profile for the first load but not the second load.

6. The method of claim 1 , wherein determining the power output capabilities of the first and second REPPs comprises generating a first power output prediction for the first REPP and a second power output prediction for the second REPP.

7. The method of claim 6 , wherein generating the first and second power output predictions comprises determining a first amount of irradiance for the first REPP and a second amount of irradiance for the second REPP.

8. A system comprising:

a controller configured to:

determine a power output capability of a first renewable energy power plant (REPP);

determine a power output capability of a second REPP;

set a power output for the first REPP and a power output for the second REPP based on a power delivery profile for the first and second loads and power output capabilities of the first and second REPPs;

allocate a combined power output of the first and second REPPs to the first and second loads for a time period;

transmit a first indication of a first portion of the combined output for the time period to the first load and a second indication of a second portion of the combined output for the time period to the second load; and

subsequent to transmitting the first indication and the second indication, deliver the allocated combined power output to a grid.

9. The system of claim 8 , wherein the first load receives more power from the grid than indicated in the first indication during the time period.

10. The system of claim 9 , wherein the controller is further configured to record a difference between the first indication and a total amount of power received from the grid during the time period.

11. The system of claim 8 , wherein the controller is further configured to allocate the combined power output of the first and second REPPs to the first and second loads for the time period by allocating the combined power output of the first and second REPPs according to a ranking of the first and second loads.

12. The system of claim 11 , wherein the controller is further configured to allocate the combined power output of the first and second REPPs to the first and second loads according to the ranking of the first and second loads to satisfy the power delivery profile for the first load but not the second load.

13. The system of claim 8 , wherein the controller is further configured to determine the power output capabilities of the first and second REPPs by generating a first power output prediction for the first REPP and a second power output prediction for the second REPP.

14. The system of claim 13 , wherein the controller is further configured to generate the first and second power output predictions by determining a first amount of irradiance for the first REPP and a second amount of irradiance for the second REPP.

15. A non-transitory, computer-readable medium comprising instructions which, when executed by a processor, cause the processor to:

determine a power output capability of a first renewable energy power plant (REPP);

determine a power output capability of a second REPP;

set a power output for the first REPP and a power output for the second REPP based on a power delivery profile for the first and second loads and power output capabilities of the first and second REPPs;

allocate a combined power output of the first and second REPPs to the first and second loads for a time period;

transmit a first indication of a first portion of the combined output for the time period to the first load and a second indication of a second portion of the combined output for the time period to the second load; and

subsequent to transmitting the first indication and the second indication, deliver the allocated combined power output to a grid.

16. The medium of claim 15 , wherein the first load receives more power from the grid than indicated in the first indication during the time period.

17. The medium of claim 16 , wherein the instructions further cause the processor to record a difference between the first indication and a total amount of power received from the grid during the time period.

18. The medium of claim 15 , wherein the instructions further cause the processor to allocate the combined power output of the first and second REPPs to the first and second loads for the time period by allocating the combined power output of the first and second REPPs according to a ranking of the first and second loads.

19. The medium of claim 18 , wherein the instructions further cause the processor to allocate the combined power output of the first and second REPPs to the first and second loads according to the ranking of the first and second loads to satisfy the power delivery profile for the first load but not the second load.

20. The medium of claim 15 , wherein the instructions further cause the processor to determine the power output capabilities of the first and second REPPs by generating a first power output prediction for the first REPP and a second power output prediction for the second REPP.

21. The medium of claim 20 , wherein the instructions further cause the processor to generate the first and second power output predictions by determining a first amount of irradiance for the first REPP and a second amount of irradiance for the second REPP.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 27, 2024
From: 8ME NOVA, LLC
To: 1ST AVENUE NOVA, LLC
Reel/Frame 068723/0860 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 26, 2023
From: HANSEN, LUKAS; RAMESH, GAUTHAM; BUTTGENBACH, THOMAS
To: 8ME NOVA, LLC
Reel/Frame 062497/0038 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 25, 2022
From: HANSEN, LUKAS; RAMESH, GAUTHAM
To: 8ME NOVA, LLC
Reel/Frame 061528/0393 →
Continuity (4)
Continuation 17879270 · Aug 2, 2022
Continuation In Part 17742980 · May 12, 2022
Continuation In Part 17344706 · Jun 10, 2021
Continuation 17210399 · Mar 23, 2021
Cited By (3)
US 12,244,147 US 12,603,498 US 12,665,545