IP Library Granted Patent US 11,923,682
Granted Patent B1
US 11,923,682 · App. 18/467,988 · Granted Mar 5, 2024

Systems and methods for transferring a behind-the-meter load between renewable energy power plants

Inventor: Nadim Kanan (Irving, TX)
Assignee: 8ME NOVA, LLC
H02J3/0075H02J3/32H02J3/381H02J2203/10H02J2300/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,923,682
App. No.
18/467,988
Granted
Mar 5, 2024
Kind
B1
Abstract

The present disclosure describes a system that includes a behind-the-meter load, a switching system, and a controller. The controller can be configured to receive, from the REPP controller of each of the plurality of REPPs, energy data regarding available energy of the REPP; determine first energy data received from a first REPP controller of a first REPP of the plurality of REPPs satisfies a condition; and responsive to the determination, adjust a switching position of the switching system to a first switching position to enable the first REPP to provide energy to the behind-the-meter load.

Claims (60)

1. A system, comprising:

a behind-the-meter load;

a switching system configured to selectively couple the behind-the-meter load with one or more of a plurality of renewable energy power plants (REPPs) over time, each of the plurality of REPPs comprising a REPP controller and at least one of an energy storage system (ESS) or a renewable energy source (RES); and

a controller in communication with the switching system and the REPP controller of each of the plurality of REPPs, the controller configured to:

receive, from the REPP controller of each of the plurality of REPPs, energy data regarding available energy of the REPP;

determine first energy data received from a first REPP controller of a first REPP of the plurality of REPPs satisfies a condition; and

responsive to the determination, adjust a switching position of the switching system to a first switching position to enable the first REPP to provide energy to the behind-the-meter load.

2. The system of claim 1 , wherein the first energy data indicates a first amount of energy generated by the RES of the first REPP that is being curtailed at the first REPP, the first amount of energy being curtailed being available energy of the first REPP; and

wherein the controller is configured to determine the first amount of energy being curtailed satisfies the condition.

3. The system of claim 1 , wherein the behind-the-meter load is selectively coupled with an energy grid with a connection outside of the switching system; and

wherein the behind-the-meter load is configured to draw energy from the energy grid when the behind-the-meter load is not receiving enough energy from the switching system to operate.

4. The system of claim 1 , wherein the switching system comprises a plurality of switches, each of the plurality of switches configured to selectively connect the behind-the-meter load with a different REPP of the plurality of REPPs, and

wherein the controller is configured to adjust the switching position of the switching system to the first switching position to enable the first REPP to provide energy to the behind-the-meter load by causing a first switch configured to connect the first REPP with the behind-the-meter load to be closed and each other switch of the plurality of switches to be open.

5. The system of claim 1 , wherein the switching system comprises a plurality of power flow devices, each of the plurality of power flow devices configured to selectively activate to couple the behind-the-meter load with a different REPP of the plurality of REPPs, and

wherein the controller is configured to adjust the switching position of the switching system to enable the first REPP to provide energy to the behind-the-meter load by causing a first power flow device to be activated to connect the behind-the-meter load with the first REPP and each other power flow device of the plurality of power flow devices to be inactivated.

6. The system of claim 5 , wherein the first power flow device is a power conversion system (PCS).

7. The system of claim 1 , wherein the controller is configured to:

compare the energy data received from each of the plurality of REPPS; and

determine the first energy data received from the first REPP controller of the first REPP satisfies a condition based on the comparison.

8. The system of claim 1 , wherein the controller is configured to:

identify energy requirements of the behind-the-meter load;

assign allocations of energy to two or more of the plurality of REPPs based on the energy data received from the REPP controllers of each of the two or more REPPs; and

adjust the switching position of the switching system to enable the two or more REPPs to provide energy to the behind-the-meter load according to the assigned allocations.

9. The system of claim 8 , wherein the switching system comprises a plurality of power flow devices, each of the plurality of power flow devices configured to selectively activate to couple the behind-the-meter load with a different REPP of the plurality of REPPs,

wherein the controller is configured to adjust the switching position of the switching system to enable the two or more REPPs to provide energy to the behind-the-meter load according to the assigned allocations by causing two or more power flow devices connected between the two or more REPPs and the behind-the-meter load to be activated to connect the behind-the-meter load with the two or more REPPs and each other power flow device of the plurality of power flow devices to be inactivated.

10. The system of claim 9 , wherein the controller is configured to activate the two or more power flow devices by transmitting one or more control signals to the two or more power flow devices that cause the two or more power flow devices to draw amounts of energy corresponding to allocations that respectively correspond to the two or more renewable energy power plants.

11. The system of claim 8 , wherein the controller is configured to assign allocations of energy to the two or more of the plurality of REPPs by:

identifying an amount of available energy for each of the plurality of REPPs from the energy data received from each of the plurality of REPP controllers;

selecting the two or more REPPs responsive to determining the amount of available energy for the two or more REPPS satisfies energy requirements of the behind-the-meter load; and

assign the allocations of energy to the two or more REPPS such that the allocations satisfy the energy requirements of the behind-the-meter load.

12. The system of claim 1 , wherein the controller is configured to:

identify a value of energy in the energy data received from each of the plurality of REPPs;

compare the values of energy between energy data received from the plurality of REPPs;

determine first energy data received from a first REPP controller of a first REPP of the plurality of REPPs satisfies the condition responsive to determining a first value of energy of the first energy data is the lowest of the values of energy.

13. The system of claim 1 , wherein the controller is configured to:

receive, from the REPP controller of each of the plurality of REPPs subsequent to adjusting the switching position of the switching system to the first position, subsequent energy data regarding available energy of the REPP;

determine second energy data received from a second REPP controller of a second REPP of the plurality of REPPs satisfies the condition or a second condition; and

responsive to the determination, adjust the switching position of the switching system from the first switching position to a second switching position to enable the second REPP to provide energy to the behind-the-meter load.

14. The system of claim 13 , wherein the controller is configured to adjust the switching position of the switching system from the first switching position to the second switching position by disabling the first REPP from providing energy to the behind-the-meter load.

15. A method, comprising:

receiving, by a controller from a renewable energy power plant (REPP) controller of each of a plurality of REPPs, energy data regarding available energy of an REPP controlled by the REPP controller, each of the plurality of REPPs comprising a REPP controller and at least one of an energy storage system (ESS) or a renewable energy source (RES);

determining, by the controller, first energy data received from a first REPP controller of a first REPP of the plurality of REPPs satisfies a condition; and

responsive to the determining, adjusting, by the controller, a switching position of a switching system to a first switching position to enable the first REPP to provide energy to a behind-the-meter load, the switching system configured to selectively couple the behind-the-meter load with one or more of a plurality of renewable energy power plants (REPPs) over time.

16. The method of claim 15 , wherein the first energy data indicates a first amount of energy generated by the RES of the first REPP that is being curtailed at the first REPP, the first amount of energy being curtailed being available energy of the first REPP; and

wherein determining the first energy data satisfies the condition comprises determining, by the controller, the first amount energy being curtailed satisfies the condition.

17. The method of claim 15 , comprising:

identifying, by the controller, energy requirements of the behind-the-meter load;

assigning, by the controller, allocations of energy to two or more of the plurality of REPPs based on the energy data received from the REPP controllers of each of the two or more REPPs; and

adjusting, by the controller, the switching position of the switching system to enable the two or more REPPs to provide energy to the behind-the-meter load according to the assigned allocations.

18. A non-transitory computer-readable medium comprising computer-executable instructions embodied thereon that, when executed by a processor, cause the processor to perform a method comprising:

receiving, from a renewable energy power plant (REPP) controller of each of a plurality of REPPs, energy data regarding available energy of an REPP controlled by the REPP controller, each of the plurality of REPPs comprising a REPP controller and at least one of an energy storage system (ESS) or a renewable energy source (RES);

determining first energy data received from a first REPP controller of a first REPP of the plurality of REPPs satisfies a condition; and

responsive to the determining, adjusting a switching position of a switching system to a first switching position to enable the first REPP to provide energy to a behind-the-meter load, the switching system configured to selectively couple the behind-the-meter load with one or more of a plurality of renewable energy power plants (REPPs) over time.

19. The non-transitory computer-readable medium of claim 18 , wherein

the first energy data indicates a first amount of energy generated by the RES of the first REPP that is being curtailed at the first REPP, the first amount of energy being curtailed being available energy of the first REPP; and

wherein determining the first energy data satisfies the condition comprises determining, by the controller, the first amount of energy being curtailed satisfies the condition.

20. The non-transitory computer-readable medium of claim 18 , wherein the method comprises:

identifying energy requirements of the behind-the-meter load;

assigning allocations of energy to two or more of the plurality of REPPs based on the energy data received from the REPP controllers of each of the two or more REPPs; and

adjusting the switching position of the switching system to enable the two or more REPPs to provide energy to the behind-the-meter load according to the assigned allocations.