IP Library Granted Patent US 7,007,760
Granted Patent B2
US 7,007,760 · App. 10/483,657 · Granted Mar 7, 2006

Method of expanding a tubular element in a wellbore

Assignee: Shell Oil Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,007,760
App. No.
10/483,657
Granted
Mar 7, 2006
Kind
B2
Abstract

There is provided a method of radially expanding a tubular element extending into a wellbore, the tubular element having a first section to be expanded to a first diameter and a second section to be expanded to a second diameter, the first diameter being larger than the second diameter. The method involves arranging an expander in the wellbore, the expander including a first expander member and a second expander member, wherein the first member has a larger outer diameter than the second member, said members being releasably interconnected. The expander is moved through the first tubular section thereby expanding the first tubular section to the first diameter, whereafter the second expander member is released from the first expander member. The second expander member is then moved through the second tubular section so as to expand the latter to the second diameter.

Claims (17)

1. A method of radially expanding a tubular element extending into a wellbore, the tubular element having a first section to be expanded to a first diameter and a second section to be expanded to a second diameter, the first diameter being larger than the second diameter, the method comprising the steps of:

a) arranging an expander in the wellbore, the expander including a first expander member and a second expander member, wherein the first member has a larger outer diameter than the second member, said members being releasably interconnected;

b) moving the expander through the first tubular section so as to expand the first tubular section to the first diameter;

c) releasing the second expander member from the first expander member; and

d) moving the second expander member through the second tubular section so as to be expanded to the second diameter.

2. The method of claim 1 , wherein the first tubular section is a lower end part of the tubular element, and the second tubular section is the remaining part of the tubular element.

3. The method of claim 2 , wherein the tubular element is a previous tubular element and wherein the tubular string includes a next tubular element, the method further comprising:

e) after step d) lowering the next tubular element through the previous tubular element until an upper end.

4. The method of claim 3 , wherein said upper end part of the next tubular element is expanded to substantially the second diameter.

5. The method of claim 3 , wherein the first expander member remains in the lower end part of the previous tubular element, and wherein the next tubular element is provided at the lower end thereof with the second expander member, the method further comprising:

f) upon passage of the second expander member through the lower end part of the previous tubular element, connecting the second expander member to the first expander member;

g) before step f), moving the expander through a lower end part of the next tubular element so as to expand said lower end part of the next tubular element to substantially the first diameter;

h) releasing the first expander member from the second expander member; and

i) moving the second expander member through the remaining part of the next tubular element so as to expand said remaining part to substantially the second diameter.

6. The method of claim 5 , wherein a plurality of said next tubular elements are expanded in the wellbore, and wherein steps e)–i) are repeated for each set of adjacent tubular elements.

7. The method of claim 1 , wherein said expander members are interconnected by a latching system.

8. The method of claim 1 , wherein the tubular element is a casing string of the wellbore.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 22, 2011
From: SHELL OIL COMPANY
To: ENVENTURE GLOBAL TECHNOLOGY, L.L.C.
Reel/Frame 025843/0861 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 12, 2004
From: LOHBECK, WILHELMUS, CHRISTIANUS, MARIA
To: SHELL OIL COMPANY
Reel/Frame 015353/0187 →
Priority Claims (1)
EP 01306050 · Jul 13, 2001 · regional
Continuity (1)
Related Publication 20040173361A1 · Sep 9, 2004