IP Library Granted Patent US 7,324,977
Granted Patent B2
US 7,324,977 · App. 10/314,053 · Granted Jan 29, 2008

Historical database system for resolving energy imbalance requirements in real-time

Assignee: Siemens Power Transmission & Distribution, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,324,977
App. No.
10/314,053
Granted
Jan 29, 2008
Kind
B2
Abstract

A method and apparatus for resolving energy imbalance in a real-time manner is disclosed. A plurality of market user interfaces are coupled to an imbalance engine which determines optimal dispatch requirements corresponding to supply and demand requirements of the market participants. The imbalance engine resolves in a real-time manner the dispatch requirements while considering the transmission limitations, ramping limitations, transmission facilities, and price data.

Claims (162)

1. A computer readable medium having computer readable instructions embedded therein, which, when executed by a computer, cause the computer to implement a method for adjusting energy generation and energy load in an energy imbalance market to remedy energy generation and energy load imbalances therein, comprising:

receiving from a plurality of imbalance market participants, including energy generating participants and energy-consuming load participants, energy supply and energy demand requirements for imbalance energy in an energy imbalance market;

archiving historical bidding data from said imbalance market participants;

collecting control area analog measurements;

determining optimal dispatch of energy generation and energy load for each imbalance market participant for balancing generation and load imbalances in the imbalance market corresponding to said energy supply and energy demand requirements, said historical bidding data; and said control area analog measurements; and

determining ex post settlement prices for the imbalance market participants corresponding to the optimal dispatch according to the relationship:

BP

mp

T

=

t

T

(

IncMW

t

*

BP

mp

t

-

DecMW

t

*

BP

mp

t

)

t

T

(

IncMW

t

+

DecMW

t

)

,

wherein BP mp T is a settlement billing price for imbalance market participant mp for a time period T, IncMW t and DecMW t are the incremental and decremental

balancing energies, respectively, during a time interval t of the time period T, and BP mp t is a billing price for market participant mp for a time interval t; and

using the ex post settlement prices to settle with the imbalance market participants.

2. The computer readable medium of claim 1 , wherein the method further comprises collecting and processing tie-line analog measurements.

3. The computer readable medium of claim 1 , wherein the method further comprises calculating loads of each control area.

4. The computer readable medium of claim 1 , wherein the method further comprises collecting weather data that may be required for very short-term load forecasts and imbalance energy forecast.

5. The computer readable medium of claim 1 , wherein the method further comprises a calculating control area errors.

6. The computer readable medium of claim 1 , wherein the method further comprises tracking unit response to energy imbalance controls.

7. The computer readable medium of claim 1 , wherein the method further comprises predicting response for tracking measurements.

8. A method for adjusting energy generation and energy load in an energy imbalance market to remedy energy generation and energy load imbalances therein determining prices in an energy trading market, comprising:

receiving energy supply and energy demand requirements for imbalance energy in an energy imbalance market pricing and load information from a plurality of imbalance market participants, including energy generating participants and energy-consuming load participants;

determining optimal balancing energy prices for each participant, the optimal prices for balancing generation and load imbalances responsive to a minimum of the sum of the bid costs over all participants and over all resource types, subject to flow gate congestion and line loss constraints;

archiving historical bidding data from said imbalance market participants; and

collecting control area analog measurements;

determining optimal dispatch of energy generation and energy load for each imbalance market participant for balancing generation and load imbalances in the imbalance market corresponding to said energy supply and energy demand requirements, said historical bidding data; and said control area analog measurements;

issuing dispatch instructions responsive to the optimal dispatch of energy generation and energy load to each imbalance market participant; for use in controlling their respective energy generation and energy load to remedy energy generation and energy load imbalances in the imbalance market;

determining ex post settlement prices for the imbalance market participants corresponding to the optimal dispatch according to the relationship:

BP

mp

T

=

t

T

(

IncMW

t

*

BP

mp

t

-

DecMW

t

*

BP

mp

t

)

t

T

(

IncMW

t

+

DecMW

t

)

,

wherein BP mp T is a settlement billing price for imbalance market participant mp for a time period T, IncMW t and DecMW t are the incremental and decremental balancing energies, respectively, during a time interval t of the time period T, and BP mp t is a billing price for market participant mp for a time interval t; and

using the ex post settlement prices to settle with the imbalance market participants.

9. A method for adjusting and pricing energy generation and energy load in an energy imbalance market of an energy distribution system separate from a bilateral energy trading market and an automatic generation control function of the energy distribution system, the energy distribution system including an energy distribution region subdivided into a plurality of different control areas including imbalance market participants, the method comprising:

receiving from a plurality of imbalance market participants, including energy generation participants and energy consuming load participants in an energy distribution region, energy supply and energy demand requirements for imbalance energy in an energy imbalance market;

archiving historical bidding data from said market participants;

collecting control area analog measurements;

determining optimal dispatch of energy generation and energy load for each imbalance market participant for balancing generation and load imbalances in the imbalance market corresponding to said energy supply and energy demand requirements, said historical bidding data, and said control area analog measurements;

determining ex post settlement prices for the imbalance market participants corresponding to the optimal dispatch according to the relationship:

BP

mp

T

=

t

T

(

IncMW

t

*

BP

mp

t

-

DecMW

t

*

BP

mp

t

)

t

T

(

IncMW

t

+

DecMW

t

)

,

wherein BP mp T is a settlement billing price for imbalance market participant mp for a time period T, IncMW t and DecMW t are the incremental and decremental balancing energies, respectively, during a time interval t of the time period T, and BP mp t is a billing price for market participant mp for a time interval t; and

using the ex post settlement prices to settle with the imbalance market participants.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 28, 2011
From: SIEMENS ENERGY, INC.
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 027286/0887 →
MERGER Recorded Sep 30, 2009
From: SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC.
To: SIEMENS POWER GENERATION, INC.
Reel/Frame 023304/0259 →
CHANGE OF NAME Recorded Sep 30, 2009
From: SIEMENS POWER GENERATION, INC.
To: SIEMENS ENERGY, INC.
Reel/Frame 023304/0588 →
CORRECTIVE ASSIGNMENT TO CORRECT THE DELETE ASIGNEE: SIEMENS POWER GENERATION, INC., 4400 ALAFAYA TRAIL ORLANDO, FL 32826 PREVIOUSLY RECORDED ON REEL 020378 FRAME 0170. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGN TO: SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC. 7000 SIEMENS ROAD WENDELL, NORTH CAROLINA 27626. Recorded Feb 4, 2008
From: PELJTO, HASO; RISTANOVIC, PETAR
To: SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC.
Reel/Frame 020463/0255 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 17, 2008
From: PELJTO, HASO; RISTANOVIC, PETAR
To: SIEMENS POWER GENERATION, INC.; SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC.
Reel/Frame 020378/0170 →
Continuity (2)
Provisional Application 6033842400 · Dec 7, 2001
Related Publication 20030216994A1 · Nov 20, 2003