IP Library Granted Patent US 7,604,047
Granted Patent B2
US 7,604,047 · App. 12/049,093 · Granted Oct 20, 2009

Universal tubing hanger suspension assembly and well completion system and method of using same

Assignee: Argus Subsea, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,604,047
App. No.
12/049,093
Granted
Oct 20, 2009
Kind
B2
Abstract

A tubing hanger suspension assembly for an oil and gas well completion system and a method of installing same. The tubing hanger suspension assembly includes a tubing hanger housing which is positioned in the wellhead housing. The tubing hanger assembly includes a sealing and lockdown mechanism capable of providing sealing and load support of the production tubing in the production casing string. A stab sub assembly connected to the upper end of the tubing hanger suspension assembly and lower end of the Christmas tree assembly provides downhole hydraulic and electric functionality and annulus access to the production tubing.

Claims (41)

1. In a well assembly having a wellhead housing ( 14 ) defining a wellhead bore, a production casing string ( 18 ) extending down a well bore (B) to a production zone and coupled to the wellhead housing, and a production tubing string ( 22 ) connected to a tubing hanger housing ( 24 ), the improvement comprising:

a lower assembly ( 32 ) coupled to a lower end of the tubing hanger housing and having a bore therethrough, the production tubing string extending through said lower assembly bore and defining a lower assembly production annulus ( 32 a ) between said lower assembly and the production tubing string, and said lower assembly including a movement prevention locking apparatus ( 40 ) locking said lower assembly to a non-profiled surface of the production casing string.

2. The well assembly of claim 1 , wherein the tubing hanger housing ( 24 ) is solely vertically supported via said lower assembly ( 32 ).

3. The well assembly of claim 2 , wherein the tubing hanger housing ( 24 ) vertical support is provided by the engagement of said movement prevention locking apparatus ( 40 ) with the production casing string ( 18 ).

4. The well assembly of claim 1 , wherein said lower assembly ( 32 ) further comprises a sealing apparatus ( 38 ) forming a fluid-tight seal between said lower assembly and the production casing string.

5. The well assembly of claim 1 , wherein said lower assembly ( 32 ) includes a lower member and said movement prevention locking apparatus ( 40 ) locks said lower member to the production casing string ( 18 ).

6. The well assembly of claim 1 , wherein said lower assembly ( 32 ) includes a lower member and said movement prevention locking apparatus ( 40 ) has a locked condition and an unlocked condition, said locked condition includes locking said lower member to the production casing string ( 18 ).

7. The well assembly of claim 6 , wherein said movement prevention locking apparatus ( 40 ) can be activated from said unlocked to locked condition and from said locked to unlocked condition.

8. The well assembly of claim 4 , wherein said sealing apparatus ( 38 ) forms a fluid-tight seal between a lower member of said lower assembly and the production casing string ( 18 ).

9. The well assembly of claim 8 , wherein said sealing apparatus ( 38 ) has a sealed condition and an unsealed condition, said sealing apparatus can be activated from said unsealed to sealed condition and from said sealed to unsealed condition.

10. The well assembly of claim 1 , wherein said movement prevention locking apparatus ( 40 ) is arranged and designed for activation to extend radially outwardly from a lower member into locking engagement with the production casing string ( 18 ).

11. The well assembly of claim 10 , wherein said lower member transfers the load of the tubing hanger housing ( 24 ) and the production tubing string ( 22 ) to the production casing string ( 18 ) independently of the production tubing string ( 22 ).

12. The well assembly of claim 6 , wherein the tubing hanger housing ( 24 ) is positioned axially within the wellhead housing ( 14 ) so that when said movement prevention locking apparatus ( 40 ) is activated to said locked condition, the tubing hanger housing ( 24 ) and said lower member are supported axially solely by said movement prevention locking apparatus ( 40 ) in engagement with the production casing string ( 18 ).

13. The well assembly of claim 1 , wherein the tubing hanger housing ( 24 ) is freestanding in the wellhead housing ( 14 ).

14. The well assembly of claims 1 , wherein the tubing hanger housing ( 24 ) includes an annulus passageway ( 24 b ) in fluid communication with said lower assembly production annulus ( 32 a ).

15. The well assembly of claim 1 , wherein the production tubing string has a tubing string length and said lower assembly ( 32 ) has a lower assembly length, and said lower assembly length is less than 50% of the tubing string length.

16. The well assembly of claim 1 , wherein the production tubing string has a tubing string length and said lower assembly ( 32 ) has a lower assembly length, and said lower assembly length is less than 25% of the tubing string length.

17. The well assembly of claim 1 , wherein the production tubing string has a tubing string length and said lower assembly ( 32 ) has a lower assembly length, and said lower assembly length is less than 15% of the tubing string length.

18. The well assembly of claim 1 , wherein said lower assembly ( 32 ) has a length in the range of 1 foot to 1,500 feet.

19. The well assembly of claim 1 , wherein said lower assembly ( 32 ) has a length in the range of 1 foot to 300 feet.

20. The well assembly of claim 1 , wherein said lower assembly ( 32 ) has a length in the range of 5 feet to 100 feet.

21. The well assembly of claim 1 , wherein the tubing hanger housing ( 24 ) is adapted for a range of vertical elevations relative to the wellhead housing ( 14 ).

22. The well assembly of claim 4 , further comprising a second sealing apparatus and a second movement prevention locking apparatus on said lower assembly, said second sealing apparatus adapted to form a fluid-tight seal between said lower assembly and the production casing string, and said second movement prevention locking apparatus adapted to lock said lower assembly to the production casing string.

23. In a well assembly having a wellhead housing ( 14 ) defining a wellhead bore, a production casing string ( 18 ) extending down a well bore (B) and coupled to the wellhead housing, and a production tubing string ( 22 ) connected to a tubing hanger housing ( 24 ), the improvement comprising:

a lower assembly ( 32 ) coupled to a lower end of the tubing hanger housing and having a bore therethrough, the production tubing string extending through said lower assembly bore and defining a lower assembly production annulus ( 32 a ) between said lower assembly and the production tubing string, and said lower assembly including a movement prevention locking apparatus ( 40 ) locking said lower assembly to the production casing string,

wherein a production casing hanger ( 18 a ) is coupled to the production casing string ( 18 ) and a stop apparatus ( 80 ) is attached to the tubing hanger housing ( 24 ), said stop apparatus cooperating with the casing hanger to limit downward movement of the tubing hanger housing.

24. The well assembly of claim 23 , wherein said stop apparatus ( 80 ) is adjustable in length.

25. In a well assembly having a wellhead housing ( 14 ) defining a wellhead bore, a production casing string ( 18 ) extending down a well bore (B) and coupled to the wellhead housing, and a production tubing string ( 22 ) connected to a tubing hanger housing ( 24 ), the improvement comprising:

a lower assembly ( 32 ) coupled to a lower end of the tubing hanger housing and having a bore therethrough, the production tubing string extending through said lower assembly bore and defining a lower assembly production annulus ( 32 a ) between said lower assembly and the production tubing string, and said lower assembly including a movement prevention locking apparatus ( 40 ) locking said lower assembly to the production casing string;

the tubing hanger housing ( 24 ) having a production bore ( 24 a ) and an annulus bore ( 24 b );

a tree assembly ( 60 ) having a production bore ( 62 ) and an annulus bore ( 70 ), said tree assembly mounting to the wellhead housing ( 14 ); and

a stab sub assembly ( 74 ) having a first end connected to said tree assembly and a second end connected to the tubing hanger housing, said stab sub assembly having a production bore ( 74 a ) providing fluid communication between said production bores of said tree assembly and the tubing hanger housing, and said stab sub assembly having an annulus bore ( 74 b ) providing fluid communication between said annulus bores of said tree assembly and the tubing hanger housing.

26. The well assembly of claim 25 , wherein the tubing hanger housing ( 24 ) is adapted for a range of vertical elevations relative to the wellhead housing ( 14 ).

27. The well assembly of claim 25 , wherein said lower assembly production annulus ( 32 a ) being in fluid communication with said annulus bore ( 24 b ) of the tubing hanger housing ( 24 ).

28. In a well assembly having a wellhead housing ( 14 ) defining a wellhead bore, an inner casing string ( 18 ) coupled to the wellhead housing and extending down a well bore (B) to a producing zone (Z), and a production tubing string ( 22 ) connected to a tubing hanger housing ( 24 ), the improvement comprising:

a lower assembly ( 32 ) coupled to a lower end of the tubing hanger housing and having a bore therethrough, the production tubing string extending through said lower assembly bore and defining a lower assembly production annulus ( 32 a ) between said lower assembly and the production tubing string, and said lower assembly including a movement prevention locking apparatus ( 40 ) locking said lower assembly to the inner casing string.

29. The well assembly of claim 28 , wherein said lower assembly ( 32 ) is retrievable.

30. The well assembly of claim 28 , wherein said movement prevention locking apparatus ( 40 ) locks said lower assembly ( 32 ) to a non-profiled surface of the inner casing string.

31. In a well assembly having a wellhead housing ( 14 ) defining a wellhead bore, a string of production casing ( 18 ) extending down a well bore (B) and connected to a production casing hanger ( 18 a ) coupled to the wellhead housing, and a production tubing string ( 22 ) connected to a tubing hanger housing ( 24 ), the improvement comprising:

a lower assembly ( 32 ) connected to the tubing hanger housing and having a bore therethrough, the production tubing string extending through said lower assembly bore and defining a lower assembly production annulus ( 32 a ) between said lower assembly and the production tubing string, and said lower assembly including a movement prevention locking apparatus ( 40 ) locking said lower assembly to a non-profiled surface of the production casing.

32. The well assembly of claim 31 , wherein said lower assembly ( 32 ) is retrievable.

Assignments (26)
SECURITY INTEREST Recorded Apr 1, 2025
From: INNOVEX DOWNHOLE SOLUTIONS, LLC; INNOVEX INTERNATIONAL, INC.; TERCEL OILFIELD PRODUCTS USA L.L.C.; DOWNHOLE WELL SOLUTIONS, LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 070692/0509 →
SECURITY INTEREST Recorded Dec 20, 2024
From: INNOVEX DOWNHOLE SOLUTIONS, LLC; INNOVEX INTERNATIONAL, INC.; TERCEL OILFIELD PRODUCTS USA L.L.C.; TOP-CO INC.
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 069746/0780 →
CHANGE OF NAME Recorded Oct 16, 2024
From: DRIL-QUIP, INC.
To: INNOVEX INTERNATIONAL, INC.
Reel/Frame 069175/0551 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 10, 2020
From: PROSERV OPERATIONS, LLC
To: DRIL-QUIP, INC.
Reel/Frame 054606/0312 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENT COLLATERAL Recorded Mar 22, 2018
From: RIVERSTONE V ACQUISITION HOLDINGS LTD.
To: PROSERV OPERATIONS, INC.
Reel/Frame 045663/0904 →
ASSIGNMENT OF PATENT SECURITY AGREEMENT Recorded Mar 20, 2018
From: UBS AG, STAMFORD BRANCH
To: RIVERSTONE V ACQUISITION HOLDINGS LTD.
Reel/Frame 045662/0200 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENT COLLATERAL Recorded Mar 8, 2018
From: HSBC BANK USA, NATIONAL ASSOCIATION
To: PROSERV OPERATIONS, INC.
Reel/Frame 045538/0279 →
SECURITY INTEREST Recorded Apr 14, 2015
From: PROSERV OPERATIONS INC.; PROSERV UK LIMITED
To: HSBC BANK, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 035404/0208 →
SECURITY INTEREST Recorded Apr 14, 2015
From: PROSERV OPERATIONS INC.
To: UBS AG, STAMFORD BRANCH, AS COLLATERAL AGENT
Reel/Frame 035404/0603 →
CHANGE OF NAME Recorded Mar 17, 2015
From: ARGUS SUBSEA INC.
To: ARGUS SUBSEA LLC
Reel/Frame 035216/0028 →
CHANGE OF NAME Recorded Mar 17, 2015
From: PROSERV OPERATIONS LLC
To: PROSERV EMPLOYING LLC
Reel/Frame 035220/0509 →
MERGER AND CHANGE OF NAME Recorded Mar 17, 2015
From: ARGUS SUBSEA LLC; PROSERV OFFSHORE LLC; PROSERV OPERATIONS, INC.
To: PROSERV OPERATIONS, INC.
Reel/Frame 035182/0351 →
MERGER AND CHANGE OF NAME Recorded Mar 17, 2015
From: PROSERV OPERATIONS INC.; PROSERV OPERATIONS LLC
To: PROSERV OPERATIONS LLC
Reel/Frame 035184/0486 →
MERGER Recorded Mar 17, 2015
From: PROSERV EMPLOYING LLC
To: PROSERV OPERATIONS INC.
Reel/Frame 035184/0706 →
RELEASE OF SECURITY INTEREST Recorded Jan 29, 2015
From: HSBC CORPORATE TRUSTEE COMPANY (UK) LIMITED AS SECURITY AGENT
To: PROSERV GROUP INC.; AZURA ENERGY SYSTEMS OFFSHORE INC.; GILMORE VALVE COMPANY; ARGUS SUBSEA INC.
Reel/Frame 034839/0404 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS Recorded Jan 26, 2015
From: HSBC CORPORATION TRUSTEE COMPANY (UK) LIMITED
To: PROSERV OPERATIONS, LLC; AZURA ENERGY SYSTEMS OFFSHORE, INC.; GILMORE VALVE COMPANY; ARGUS SUBSEA INC.
Reel/Frame 034810/0135 →
MERGER Recorded May 6, 2013
From: GILMORE VALVE COMPANY; ARGUS SUBSEA LLC; PROSERV OFFSHORE LLC
To: PROSERV OPERATIONS, INC.
Reel/Frame 030353/0045 →
MERGER Recorded May 6, 2013
From: ARGUS SUBSEA LLC; GILMORE VALVE COMPANY; PROSERV OFFSHORE, LLC
To: PROSERV OFFSHORE, INC.
Reel/Frame 030353/0458 →
RELEASE OF SECURITY INTEREST Recorded Jan 8, 2013
From: HAYMARKET FINANCIAL LLP, A SECURITY AGENT
To: AZURA ENERGY SYSTEMS, INC.; GILMORE VALVE COMPANY; ARGUS SUBSEA INC.
Reel/Frame 029586/0764 →
PATENT SECURITY AGREEMENT SUPPLEMENT DATED DECEMBER 8, 2012 Recorded Dec 20, 2012
From: PROSERV OPERATIONS LLC; PROSERV HOLDINGS INC.; PROSERV OFFSHORE INC.; ARGUS SUBSEA LLC; GILMORE VALVE COMPANY; PROSERV INTERNATIONAL HOLDINGS LLC; PROSERV OFFSHORE HOLDINGS, INC.
To: HSBC CORPORATE TRUSTEE COMPANY (UK) LIMITED
Reel/Frame 029529/0937 →
RELEASE OF SECURITY INTEREST Recorded Jul 11, 2011
From: THE ROYAL BANK OF SCOTLAND PLC
To: ARGUS SUBSEA INC.
Reel/Frame 026573/0888 →
SECURITY AGREEMENT Recorded Jul 5, 2011
From: AZURA ENERGY SYSTEMS OFFSHORE, INC.
To: HAYMARKET FINANCIAL LLP, AS SECURITY AGENT
Reel/Frame 026544/0827 →
AMENDED AND RESTATED PATENT SECURITY AGREEMENT SUPPLEMENT Recorded Feb 2, 2010
From: ARGUS SUBSEA INC.
To: THE ROYAL BANK OF SCOTLAND PLC
Reel/Frame 023882/0153 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2009
From: GALATHEA GROUP INC
To: ARGUS SUBSEA INC
Reel/Frame 022764/0917 →
CHANGE OF NAME Recorded May 4, 2009
From: AZURA ENERGY SYSTEMS, INC.
To: AESI HOLDINGS, INC.
Reel/Frame 022634/0106 →
CHANGE OF NAME Recorded May 4, 2009
From: AESI HOLDINGS, INC.
To: GALATHEA GROUP INC.
Reel/Frame 022634/0111 →
Continuity (3)
Continuation 1121622700 · Aug 31, 2005
Provisional Application 6068225000 · May 18, 2005
Related Publication 20080156478A1 · Jul 3, 2008