IP Library Granted Patent US 7,681,663
Granted Patent B2
US 7,681,663 · App. 11/416,009 · Granted Mar 23, 2010

Methods and systems for determining angular orientation of a drill string

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,681,663
App. No.
11/416,009
Granted
Mar 23, 2010
Kind
B2
Abstract

Preferred methods and systems generate a control input based on a periodically-varying characteristic associated with the rotation of a drill string. The periodically varying characteristic can be correlated with the magnetic tool face and gravity tool face of a rotating component of the drill string, so that the control input can be used to initiate a response in the rotating component as a function of gravity tool face.

Claims (75)

1. A method, comprising:

causing a drill string to rotate within an earthen formation;

monitoring the magnetic field of the earthed formation as the drill string rotates;

generating an electrical signal in response to a periodically-varying characteristic of the magnetic field;

sending the electrical signal to a component of the drill string that is responsive to the electrical signal;

determining gravity tool face and magnetic tool face of the component of the drill while the component of the drill string is not rotating;

calculating a difference between the gravity tool face and magnetic tool face determined while the component of the drill string is not rotating;

calculating a first angular position of the component corresponding to a difference between an angular position at which an action of the component of the drill string will be initiated, and the difference between the gravity tool face and magnetic tool face determined while the component of the drill string is not rotating; and

timing the generation of the electrical signal based on the difference between the angular position at which a response of the component of the drill string will be initiated, and the difference between the gravity tool face and magnetic tool face determined while the component of the drill string is not rotating.

2. The method of claim 1 , further comprising:

calculating an angular velocity of the component of the drill string based on a period of rotation of the component;

calculating a time required for the component of the drill string to rotate from a second angular position at which the periodically-varying characteristic of the magnetic field occurs, to the first angular position based on the angular velocity; and

generating the electrical signal based on the time required for the component of the drill string to rotate from the second angular position to the first angular position.

3. The method of claim 2 , wherein the magnetic tool face of the component of the drill string is approximately zero when the component of the drill string is in the second position.

4. The method of claim 2 , wherein the periodically-varying characteristic of the magnetic field is a measurement of a component of a local geomagnetic field as measured by a magnetometer that rotates with the drill string.

5. The method of claim 4 , wherein the periodically-varying characteristic of the magnetic field is a zero value for the component of the local geomagnetic field.

6. The method of claim 2 , wherein generating the electrical signal based on the time required for the component of the drill string to rotate from the second angular position to the first angular position comprises generating the electrical signal approximately when the time required for the component of the drill string to rotate from the second angular position to the first angular position elapses after the component of the drill string is in the second angular position.

7. The method of claim 2 , wherein generating the electrical signal based on the time required for the component of the drill string to rotate from the second angular position to the first angular position comprises:

calculating a quantity of time equal to a difference between a response time of the component of the drill string to the electrical signal and the time required for the component of the drill string to rotate from the second angular position to the first angular position; and

generating the electrical signal approximately when the quantity of time elapses after the component of the drill string is in the second angular position.

8. The method of claim 4 , wherein the magnetometer is mounted on the component of the drill string at approximately the same angular position as a portion of the component of the drill string that is responsive to the electrical signal.

9. The method of claim 4 , wherein the magnetometer is mounted on the drill string up-hole of the component of the drill string.

10. The method of claim 9 , further comprising calculating a difference between an angular position of the magnetometer and an angular position of a portion of the component of the drill string that is responsive to the electrical signal; wherein the first angular position further corresponds to the difference between the angular position at which the action of the component of the drill string will be initiated, and the difference between the angular position of the magnetometer and the angular position of the portion of the component that is responsive to the electrical signal.

11. The method of claim 5 , wherein calculating the angular velocity of the component of the drill string based on the period of rotation of the component of the drill string comprises calculating the angular velocity of the component of the drill string based on a periodic occurrence of the zero value for the component of the local geomagnetic field.

12. The method of claim 5 , wherein calculating the angular velocity of the component of the drill string based on the period of rotation of the component of the drill string comprises calculating the angular velocity of the component of the drill string based on four periodic occurrences of the zero value for the component of the local geomagnetic field.

13. The method of claim 1 , further comprising calculating the angular position at which the action of the component of the drill string will be initiated by calculating a difference between a desired heading along which the drill string is to be steered and 180°.

14. A method, comprising:

drilling a subsurface bore using a rotating drill string;

calculating a time required for a rotating component of the drill string to rotate through an angular displacement approximately equal to an angular distance between a first angular position of the rotating component, and a second angular position of the rotating component at which a predetermined action of the rotating component will be initiated;

determining when the rotating component reaches the first angular position by measuring a quantity that varies with the angular position of the rotating component; and

monitoring the time that elapses after the rotating component reaches the first angular position until at least the time that it reaches approximately the second angular position.

15. The method of claim 14 , wherein the quantity that varies with the rotation of the rotating component varies periodically with the rotation of the drill string.

16. The method of claim 14 , wherein the quantity that varies with the rotation of the rotating component is a component of a magnetic field measured by a magnetometer that rotates with the rotating component.

17. The method of claim 14 , further comprising sending a control input to the rotating component to cause the predetermined response of the rotating component to take place when the rotating component is located approximately at the second position.

18. The method of claim 17 , further comprising sending the control input to the rotating component approximately when the time required for the rotating component to translate through the angular distance elapses after the rotating component reaches the first angular position.

19. The method of claim 17 , further comprising:

calculating a time interval equal to a difference between the time required for the rotating component to translate through the angular distance and a response time of the rotating component to the control input; and

sending the control input to the rotating component approximately when the time interval elapses after the rotating component reaches the first angular position.

20. The method of claim 16 , wherein the component of the magnetic field measured by the magnetometer is approximately zero when the rotating component is in the first position.

21. The method of claim 17 , wherein sending a control input to the rotating component to cause the predetermined response of the rotating component to take place when the rotating component is located approximately at the second position comprises sending the control input electrical to cause an arm of the rotating component to extend and push against the earth formation thereby steering the drill string.

22. The method of claim 21 , wherein the rotating component is a rotary steerable motor.

23. The method of claim 16 , wherein the magnetometer is mounted on the rotating component at approximately the same angular position as a portion of the rotating component that is responsive to the control input.

24. The method of claim 16 , wherein the magnetometer is mounted on the drill string up hole of the rotating component.

25. A method, comprising:

drilling a subsurface bore using a rotating drill string;

calculating a time required for a rotating component of the drill string to rotate through an angular displacement approximately equal to an angular distance between a first angular position of the rotating component, and a second angular position of the rotating component at which a predetermined action of the rotating component will be initiated;

determining when the rotating component reaches the first angular position by measuring a quantity that varies with the angular position of the rotating component, wherein the quantity that varies with the rotation of the rotating component varies periodically with the rotation of the drill string;

monitoring the time that elapses after the rotating component reaches the first angular position until at least the time that it reaches approximately the second angular position;

determining gravity tool face and magnetic tool face of the component while the rotating component is not rotating;

calculating a difference between the gravity tool face and magnetic tool face determined while the rotating component is not rotating; and

determining the second angular position by calculating a difference between an angular position at which a response of the rotating component is to be initiated, and the difference between the gravity tool face and magnetic tool face determined while the rotating component is not rotating.

26. The method of claim 25 , further comprising:

calculating an angular velocity of the rotating component based on a period of rotation of the rotating component; and

calculating the time required for a rotating component of the drill string to rotate through the angular displacement based on the angular velocity of the rotating component.

27. The method of claim 25 , wherein the magnetic tool face of the component is approximately zero when the component is in the first position.

28. The method of claim 26 , wherein calculating an angular velocity of the rotating component based on a period of rotation of the rotating component comprises calculating the angular velocity of the rotating component based on a periodic occurrence of a zero value for a value of a magnetic field measured by a magnetometer that rotates with the rotating component.

29. The method of claim 26 , wherein calculating an angular velocity of the rotating component based on a period of rotation of the rotating component comprises calculating the angular velocity of the rotating component based on four periodic occurrences of a zero value for a value of a magnetic field measured by a magnetometer that rotates with the rotating component.

30. The method of claim 25 , further comprising calculating the angular position at which the action of the component is to be initiated by calculating a difference between a desired heading along which the drill string is to be steered and 180°.

31. A method, comprising:

determining gravity tool face and apparent magnetic tool face of a rotatable component while the rotatable component is not rotating;

determining an offset between the gravity tool face and the apparent magnetic tool face;

determining a first angular position by calculating a difference between the offset and an angular position at which a desired action of the rotatable component is to be initiated;

measuring a component of a geomagnetic field around the rotatable component while the rotatable component is rotating;

calculating an angular distance between the first angular position and a second angular position at which a measured value of the geomagnetic field is approximately zero; and

calculating a time required for the rotatable component to rotate from the second angular position to the first angular position.

32. The method of claim 31 , further comprising sending an electrical signal to the rotatable component to cause a response to be initiated approximately when the time required for the rotatable component to rotate from the first angular position to the second angular position elapses after the rotatable component is in the first angular position.

33. The method of claim 31 , wherein magnetic tool face is approximately zero when the rotatable component is in the second angular position.

34. A system, comprising:

at least two accelerometers that measure components of a gravitational field around a rotatable component of a drill string;

a two or three-axis magnetometer that measures components of a magnetic field around the rotatable component;

a first controller communicatively coupled to the accelerometers and the magnetometer, wherein the controller generates an electrical signal in response to a periodically-varying characteristic of the magnetic field, and sends the electrical signal to a component of the drill string that is responsive to the electrical signal; and

a second controller communicatively coupled to the accelerometers, and a telemetry system that communicatively couples the first and second controllers, the second controller mounted up hole of the telemetry system,

wherein the first controller determines gravity tool face and magnetic tool face of the component while the component is not rotating; calculates a difference between the gravity tool face and magnetic tool face determined while the component is not rotating; and calculates a first angular position corresponding to a difference between an angular position at which an action of the component will be initiated, and the difference between the gravity tool face and magnetic tool face determined while the component is not rotating.

35. The system of claim 34 , wherein the first controller calculates an angular velocity of the component based on a period of rotation of the component; calculates a time required for the component to rotate from a second angular position at which the periodically-varying characteristic of the magnetic field measurement occurs, to the first angular position based on the angular velocity; and generates the electrical signal based on the time required for the component to rotate from the second angular position to the first angular position.

36. The method of claim 35 , wherein the magnetic tool face of the component is approximately zero when the component is in the second position.

Assignments (15)
RELEASE OF SECURITY INTEREST Recorded Feb 1, 2024
From: KEYBANK NATIONAL ASSOCIATION
To: APS TECHNOLOGY INC; APS INDUSTRIES INC; APST INTERNATIONAL INC
Reel/Frame 066405/0762 →
SECURITY INTEREST Recorded Jan 17, 2024
From: APS TECHNOLOGY LLC
To: BALANCE POINT CAPITAL PARTNERS III, LP, AS AGENT
Reel/Frame 066341/0846 →
SECURITY INTEREST Recorded Feb 7, 2019
From: APS TECHNOLOGY, INC.; APS INDUSTRIES, INC.; APST INTERNATIONAL, INC.
To: KEYBANK NATIONAL ASSOCIATION
Reel/Frame 048375/0848 →
AMENDED AND RESTATED INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Feb 7, 2019
From: APS TECHNOLOGY, INC.; APS INDUSTRIES, INC.; APST INTERNATIONAL, INC.
To: BALANCE POINT CAPITAL PARTNERS III, LP
Reel/Frame 049856/0434 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CONVEYING PARTY NAME PREVIOUSLY RECORDED ON REEL 038077 FRAME 0218. ASSIGNOR(S) HEREBY CONFIRMS THE TERMINATES SECURITY AGREEMENT. Recorded Dec 21, 2017
From: ENHANCED CAPITAL CONNECTICUT FUND I, LLC, ENHANCED CAPITAL CONNECTICUT FUND II, ENHANCED CAPITAL CONNECTICUT FUND III, LLC
To: APS TECHNOLOGY
Reel/Frame 044935/0603 →
CORRECTIVE ASSIGNMENT TO CORRECT THE RECEIVING PARTY NAME PREVIOUSLY RECORDED ON REEL 038088 FRAME 0615. ASSIGNOR(S) HEREBY CONFIRMS THE TRADEMARK SECURITY AGREEMENT. Recorded Dec 21, 2017
From: TD BANKNORTH NA
To: APS TECHNOLOGY
Reel/Frame 044935/0125 →
SECURITY INTEREST Recorded Oct 10, 2017
From: APS TECHNOLOGY, INC.; APS INDUSTRIES, INC.; APST INTERNATIONAL, INC.
To: BALANCE POINT CAPITAL PARTNERS III, LP
Reel/Frame 044169/0053 →
RELEASE OF SECURITY INTEREST Recorded Oct 4, 2017
From: CITIZENS BANK, N.A., AS AGENT, FORMERLY KNOWN AS RBS CITIZENS, NATIONAL ASSOCIATION
To: APS TECHNOLOGY, INC.
Reel/Frame 043782/0731 →
RELEASE OF SECURITY INTEREST Recorded Mar 24, 2016
From: TD BANKNORTH NA
To: TD BANKNORTH NA
Reel/Frame 038088/0615 →
RELEASE OF SECURITY INTEREST Recorded Mar 14, 2016
From: APS TECHNOLOGY, INC.
To: ENHANCED CAPITAL CONNECTICUT FUND I, LLC, ENHANCED CAPITAL CONNECTICUT FUND II, LLC, ENHANCED CAPITAL CONNECTICUT FUND III, LLC
Reel/Frame 038077/0218 →
SECURITY INTEREST Recorded Jun 6, 2014
From: APS TECHNOLOGY, INC.
To: RBS CITIZENS, NATIONAL ASSOCIATION
Reel/Frame 033101/0795 →
SECURITY AGREEMENT Recorded Apr 20, 2012
From: APS TECHNOLOGY, INC.
To: ENHANCED CAPITAL CONNECTICUT FUND I, LLC; ENHANCED CAPITAL CONNECTICUT FUND II, LLC; ENHANCED CAPITAL CONNECTICUT FUND III, LLC
Reel/Frame 028080/0080 →
SECURITY AGREEMENT Recorded Dec 17, 2010
From: APS TECHNOLOGY, INC.; APS OILFIELD SERVICES, LP
To: TD BANK, N.A.
Reel/Frame 025522/0274 →
CONFIRMATORY LICENSE Recorded Sep 1, 2009
From: APS TECHNOLOGY, INC.
To: ENERGY, UNITED STATES DEPARTMENT OF
Reel/Frame 023162/0551 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 31, 2006
From: COBERN, MARTIN E.
To: APS TECHNOLOGY, INC.
Reel/Frame 018037/0077 →