IP Library Granted Patent US 7,895,017
Granted Patent B2
US 7,895,017 · App. 12/179,179 · Granted Feb 22, 2011

System to increase SNR of CPV-generated power signal

Assignee: Solfocus, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,895,017
App. No.
12/179,179
Granted
Feb 22, 2011
Kind
B2
Abstract

A system may include acquisition of power information from a signal line in accordance with a first signal characteristic. The power information is associated with power generated by a solar collector, and the first signal characteristic is substantially orthogonal to a corresponding signal characteristic of at least one noise source associated with the signal line. In some aspects, a solar tracking error associated with the solar collector is determined based on the acquired power information, a servo feedback signal is determined based on the acquired power information, and determination of the solar tracking error includes determination of the solar tracking error based on the servo feedback signal.

Claims (59)

1. A method comprising:

acquiring power information from a signal line in accordance with a first signal characteristic, the power information associated with power generated by a solar collector,

wherein the first signal characteristic is substantially orthogonal to a corresponding signal characteristic of at least one noise source associated with the signal line.

2. A method according to claim 1 , wherein the first signal characteristic comprises a first frequency that is substantially orthogonal to an operating frequency of a control servo of an inverter coupled to the signal line.

3. A method according to claim 2 , wherein the first frequency is substantially orthogonal to a frequency of a power grid coupled to the signal line.

4. A method according to claim 1 , further comprising:

determining a solar tracking error associated with the solar collector based on the acquired power information.

5. A method according to claim 4 , further comprising:

determining a servo feedback signal based on the acquired power information,

wherein determining the solar tracking error comprises determining the solar tracking error based on the servo feedback signal.

6. A method according to claim 5 , wherein determining the solar tracking error further comprises:

determining the solar tracking error based on the servo feedback signal and on a relationship between a response of the solar collector and tracking error.

7. A method according to claim 6 , wherein determining the solar tracking error comprises:

determining a servo feedback signal based on the acquired power information and on a servo feedback signal equation; and

determining the solar tracking error based on the servo feedback signal and on a determined relationship between servo feedback signals and tracking error, the determined relationship associated with the solar collector and based on the servo feedback signal equation and the relationship between the response of the solar collector and tracking error.

8. A method according to claim 4 , wherein acquiring power information comprises:

estimating a first solar position corresponding to a first time;

aligning the solar collector with a first position at the first time, the first position offset from the estimated first solar position in a first direction;

determining a first power generated while the solar collector is aligned with the first position;

estimating a second solar position corresponding to a second time;

aligning the solar collector with a second position at the second time, the second position offset from the estimated second solar position in a second direction substantially opposite to the first direction; and

determining a second power generated while the solar collector is aligned with the second position, and

wherein determining the solar tracking error comprises determining a solar tracking error based on the first power and the second power.

9. A method according to claim 8 , wherein determining the solar tracking error comprises:

determining the solar tracking error based on the first power, the second power, and on a relationship between a response of the solar collector and tracking error, the relationship associated with the solar collector.

10. A method according to claim 9 , wherein determining the solar tracking error comprises:

determining a servo feedback signal based on the first power, the second power, and a servo feedback signal equation; and

determining the solar tracking error based on the servo feedback signal and on a determined relationship between servo feedback signals and tracking error, the determined relationship associated with the solar collector and based on the servo feedback signal equation and the relationship between the response of the solar collector and tracking error.

11. A system comprising:

a solar collector to generate power;

a signal line to carry power generated by the solar collector; and

a device to acquire power information associated with power generated by the solar collector from the signal line in accordance with a first signal characteristic,

wherein the first signal characteristic is substantially orthogonal to a corresponding signal characteristic of at least one noise source associated with the signal line.

12. A system according to claim 11 , further comprising:

an inverter coupled to the signal line,

wherein the first signal characteristic comprises a first frequency that is substantially orthogonal to an operating frequency of a control servo of the inverter.

13. A system according to claim 12 , wherein the first frequency is substantially orthogonal to a frequency of a power grid coupled to the signal line.

14. A system according to claim 11 , further comprising:

a processor to determine a solar tracking error associated with the solar collector based on the acquired power information.

15. A system according to claim 14 , the processor further to determine a servo feedback signal based on the acquired power information,

wherein determination of the solar tracking error comprises determination of the solar tracking error based on the servo feedback signal.

16. A system according to claim 15 , wherein determination of the solar tracking error further comprises:

determination of the solar tracking error based on the servo feedback signal and on a relationship between a response of the solar collector and tracking error.

17. A system according to claim 16 , wherein determination the solar tracking error comprises:

determination of a servo feedback signal based on the acquired power information and on a servo feedback signal equation; and

determination of the solar tracking error based on the servo feedback signal and on a determined relationship between servo feedback signals and tracking error, the determined relationship associated with the solar collector and based on the servo feedback signal equation and the relationship between the response of the solar collector and tracking error.

18. A system according to claim 14 , the processor further to:

estimate a first solar position corresponding to a first time;

align the solar collector with a first position at the first time, the first position offset from the estimated first solar position in a first direction;

determine a first power generated while the solar collector is aligned with the first position;

estimate a second solar position corresponding to a second time;

align the solar collector with a second position at the second time, the second position offset from the estimated second solar position in a second direction substantially opposite to the first direction; and

determine a second power generated while the solar collector is aligned with the second position, and

wherein determination of the solar tracking error comprises determination of a solar tracking error based on the first power and the second power.

19. A system according to claim 18 , wherein determination of the solar tracking error comprises:

determination of the solar tracking error based on the first power, the second power, and on a relationship between a response of the solar collector and tracking error, the relationship associated with the solar collector.

20. A system according to claim 19 , wherein determination of the solar tracking error comprises:

determination of a servo feedback signal based on the first power, the second power, and a servo feedback signal equation; and

determination of the solar tracking error based on the servo feedback signal and on a determined relationship between servo feedback signals and tracking error, the determined relationship associated with the solar collector and based on the servo feedback signal equation and the relationship between the response of the solar collector and tracking error.

Assignments (12)
RELEASE OF SECURITY INTEREST Recorded Mar 27, 2015
From: SILICON VALLEY BANK
To: SOLFOCUS, INC.
Reel/Frame 035276/0682 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 27, 2015
From: SOLFOCUS, INC.
To: SOLFOCUS (ASSIGNMENT FOR THE BENEFIT OF CREDITORS), LLC
Reel/Frame 035276/0065 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 27, 2015
From: INNOVATION CORE SEI, INC.
To: SUMITOMO ELECTRIC INDUSTRIES, LTD.
Reel/Frame 035276/0396 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 27, 2015
From: SOLFOCUS (ASSIGNMENT FOR THE BENEFIT OF CREDITORS), LLC
To: INNOVATION CORE SEI, INC.
Reel/Frame 035276/0202 →
RELEASE OF SECURITY INTEREST Recorded Mar 27, 2015
From: GOLD HILL CAPITAL 2008, LP
To: SOLFOCUS, INC.
Reel/Frame 035276/0812 →
RELEASE OF SECURITY INTEREST Recorded Mar 27, 2015
From: CPV SOLAR LLC C/O HARPER CONSTRUCTION COMPANY, INC.
To: SOLFOCUS, INC.
Reel/Frame 035276/0875 →
SECURITY AGREEMENT Recorded Feb 1, 2013
From: SOLFOCUS, INC.
To: CPV SOLAR LLC C/O HARPER CONSTRUCTION COMPANY, INC.
Reel/Frame 029733/0583 →
SECURITY AGREEMENT Recorded Jan 31, 2013
From: SOLFOCUS, INC.
To: SILICON VALLEY BANK
Reel/Frame 029732/0658 →
SECURITY AGREEMENT Recorded Jan 31, 2013
From: SOLFOCUS, INC.
To: SILICON VALLEY BANK; GOLD HILL CAPITAL 2008, LP
Reel/Frame 029732/0687 →
RELEASE OF SECURITY INTEREST AT REEL/FRAME 023973/0826 Recorded Jun 16, 2011
From: NEW ENTERPRISE ASSOCIATES 12 LIMITED PARTNERSHIP
To: SOLFOCUS, INC.
Reel/Frame 026464/0821 →
SECURITY AGREEMENT Recorded Feb 24, 2010
From: SOLFOCUS, INC.
To: NEW ENTERPRISE ASSOCIATES 12 LIMITED PARTNERSHIP, AS COLLATERAL AGENT
Reel/Frame 023973/0826 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 24, 2008
From: MCDONALD, MARK; HORNE, STEPHEN J.
To: SOLFOCUS, INC.
Reel/Frame 021287/0489 →
Continuity (1)
Related Publication 20100023138A1 · Jan 28, 2010