Method and device for conveying particulate material during the layer-wise production of patterns

Inventors: Ingo Ederer (Geltendorf, DE); Andreas Hartman (Stadtbergen, DE)
Assignee: Voxeljet AG
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,727,672
App. No.
12/681,961
Granted
May 20, 2014
Kind
B2
Abstract

The present invention relates to a method for conveying particulate material during the manufacture of patterns in layers, wherein powder is conveyed out of a reservoir into a spreader unit and, if applicable, excess powder fed to the spreader unit is again conveyed back into the reservoir and wherein this conveying takes place in a closed conveying circuit.

Claims (25)

1. A method comprising:

forming three dimension objects comprising the steps of:

1) providing a device for conveying particulate material comprising:

a) a reservoir;

b) a spreader unit; and

c) a plurality of particulate material conveying systems including a first particulate material conveying system having a screw conveyor and a second particulate material conveying system having a screw conveyor;

2) forming a first layer of the three dimension object by a layer forming step comprising:

a) conveying the particulate material out of the reservoir into the spreader unit with at least the first particulate material conveying system;

b) spreading the particulate material unit unto a build platform with the spreader; and

c) conveying excess particulate material that was fed to the spreader unit back into the reservoir after the step of spreading; and

3) forming a second layer of the three dimensional object by a layer forming step by repeating steps 2 a , 2 b and 2 c;

wherein the steps 2 a and 2 c of conveying takes place in a closed conveying circuit that includes the plurality of particulate material conveying systems.

2. The method of claim 1 , wherein the step of conveying the excess particulate material back into the reservoir takes place using a bypass opening in the particulate material conveying system.

3. The method according to claim, wherein the step 2 a of conveying the particulate material takes place via low pressure.

4. The method according to claim 1 , wherein the closed conveying circuit conveys the excess particulate material back into the reservoir after a coating process.

5. The method of claim 1 , wherein the device for conveying particulate material includes an ejection system.

6. The method of claim 1 , wherein the reservoir is arranged below the spreader unit in a vertical direction, when viewed in a direction at a right angle to a coating direction, at least during a filling process.

7. The method of claim 1 , wherein at least one of the plurality of particulate material conveying systems comprises at least one conveyor belt, and

wherein the device for conveying particulate material includes a junction for introducing anew powder material into the reservoir.

8. The method of claim 1 , wherein the step 2 a of conveying the particulate material out of the reservoir into the spreader further employs the second particulate material conveying system, and

wherein the device for conveying particulate material includes a junction for introducing a new powder material into the reservoir.

9. The method of claim 1 , wherein at least one of the particulate material conveying systems comprises a suction device for low pressure conveying, and

wherein the device for conveying particulate material includes a junction for introducing anew powder material into the reservoir.

10. The method of claim 5 , wherein the ejection system comprises two covers comprising slits, and

wherein the device for conveying particulate material includes a junction for introducing anew powder material into the reservoir.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 28, 2014
From: VOXELJET TECHNOLOGY GMBH
To: VOXELJET AG
Reel/Frame 032552/0095 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 12, 2010
From: EDERER, INGO; HARTMANN, ANDREAS
To: VOXELJET TECHNOLOGY GMBH
Reel/Frame 024215/0668 →
Priority Claims (1)
DE 10 2007 050 679 · Oct 21, 2007 · national
Continuity (1)
Related Publication 20100272519A1 · Oct 28, 2010