IP Library Granted Patent US 8,955,385
Granted Patent B2
US 8,955,385 · App. 13/381,989 · Granted Feb 17, 2015

Pressure monitoring system including multiple pressure switches

Inventors: Roland Baier (Esslingen, DE); Stefan Pfund (Baden-Wurttemberg, DE)
Assignee: Norgren GmbH
G05D16/0605H01H35/2614
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,955,385
App. No.
13/381,989
Granted
Feb 17, 2015
Kind
B2
Abstract

A pressure monitoring system ( 200 ) is provided. The pressure monitoring system ( 200 ) includes a housing ( 201 ) and a fluid port ( 202 ) formed in the housing ( 201 ). The pressure monitoring system ( 200 ) also includes a first pressure switch ( 204 ) positioned within at least a portion of the housing ( 201 ). The first pressure switch ( 204 ) is in fluid communication with the fluid port ( 202 ). The pressure monitoring system ( 200 ) also includes a second pressure switch ( 205 ) positioned within at least a portion of the housing ( 201 ). The second pressure switch ( 205 ) is also in fluid communication with the fluid port ( 202 ).

Claims (22)

1. A pressure monitoring system ( 200 ), comprising:

a housing ( 201 );

a fluid port ( 202 ) formed in the housing ( 201 );

a first pressure switch ( 204 ) positioned within at least a portion of the housing ( 201 ) and in fluid communication with the fluid port ( 202 ); and

a second pressure switch ( 205 ) positioned within at least a portion of the housing ( 201 ) and in fluid communication with the fluid port ( 202 ).

2. The pressure monitoring system ( 200 ) of claim 1 , further comprising a first pressure switch aperture ( 230 ) formed in the housing ( 201 ) and adapted to receive the first pressure switch ( 204 ) and at least a second pressure switch aperture ( 231 ) formed in the housing ( 201 ) and adapted to receive the second pressure switch ( 205 ).

3. The pressure monitoring system ( 200 ) of claim 1 , further comprising a fluid channel ( 315 ) formed in the housing ( 201 ) and providing a fluid communication path between the fluid port ( 202 ) and the first and second pressure switches ( 204 , 205 ).

4. The pressure monitoring system ( 200 ) of claim 1 , further comprising an electrical connector ( 203 ) extending from the housing and in communication with the first pressure switch ( 204 ) and the second pressure switch ( 205 ).

5. The pressure monitoring system ( 200 ) of claim 1 , further comprising:

a first adjustment member ( 206 ) adapted to adjust a threshold actuation pressure of the first pressure switch ( 204 ); and

a second adjustment member ( 207 ) adapted to adjust a threshold actuation pressure of the second pressure switch ( 205 ).

6. The pressure monitoring system ( 200 ) of claim 1 , wherein one of the first or second pressure switches ( 204 , 205 ) comprises a backup pressure switch and the first and second pressure switches ( 204 , 205 ) are configured to actuate at substantially the same pressure.

7. A method for forming a pressure monitoring system including a housing and a fluid port formed in the housing, comprising the steps of:

positioning a first pressure switch in at least a portion of the housing such that the first pressure switch is in fluid communication with the fluid port; and

positioning a second pressure switch in at least a portion of the housing such that the second pressure switch is in fluid communication with the fluid port.

8. The method of claim 7 , wherein the step of positioning the first pressure switch comprises inserting the first pressure switch into a first pressure switch aperture formed in the housing and wherein the step of positioning the second pressure switch comprises inserting the second pressure switch into a second pressure switch aperture formed in the housing.

9. The method of claim 7 , wherein a fluid channel formed in the housing provides fluid communication between the fluid port and the first and second pressure switches.

10. The method of claim 7 , further comprising the steps of extending an electrical connector from the housing and providing electrical communication between the electrical connector and the first pressure switch and the second pressure switch.

11. The method of claim 7 , further comprising the steps of:

adjusting the first pressure switch to actuate at a first threshold actuation pressure; and

adjusting the second pressure switch to actuate at a second threshold actuation pressure.

12. The method of claim 7 , wherein one of the first or second pressure switches comprises a backup pressure switch and the first and second pressure switches are configured to actuate at substantially the same pressure.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2012
From: BAIER, ROLAND; PFUND, STEFAN
To: NORGREN GMBH
Reel/Frame 027468/0205 →
Continuity (2)
Provisional Application 61224144 · Jul 9, 2009
Related Publication 20120111121A1 · May 10, 2012