IP Library Granted Patent US 9,258,946
Granted Patent B2
US 9,258,946 · App. 14/089,798 · Granted Feb 16, 2016

Round baler accumulation area of width greater than bale chamber

Inventors: Brian D. Olander (Buhler, KS); Charlie O. James (Newton, KS); Cedric J. Blough (Moundridge, KS)
Assignee: AGCO Corporation
A01F15/0705A01F15/106
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,258,946
App. No.
14/089,798
Granted
Feb 16, 2016
Kind
B2
Abstract

A continuous baling method comprising conveying crop material on a rotating conveyor toward a baler while the baler is traversing a field, the conveyor comprising a conveying surface having an entire crop material-carrying width of a first distance; narrowing the flow of the crop material to transition the crop material flow from the conveyor to the baler; and receiving the narrowed flow at an inlet to a baling chamber of the baler, the inlet comprising a width having a second distance smaller than the first distance.

Claims (16)

1. A continuous baling system, comprising:

an accumulation frame comprising longitudinal first and second side walls;

a pickup mechanism configured to pick up crop material as the continuous baling system traverses a field;

a first conveyor rotatably coupled to the accumulation frame extending from a first end adjacent the pickup mechanism to a second end and disposed between the first and second side walls, the conveyor comprising a conveying surface moveable from front to back for conveying crop material deposited on the first conveyor by the pickup mechanism;

a screed positioned adjacent the second end of the first conveyor comprising a rotatable second conveyor, the screed configured to be movable between a raised position and a lowered position relative to the first conveyor; and

a baler coupled to, and adjacent to, the accumulation frame, the baler comprising a bale chamber for bale formation, the bale chamber comprising plural side walls,

wherein when the screed is in the raised position, a gap is formed between the screed and the first conveyor so that crop material conveyed by the first conveyor passes through the gap between the screed and the first conveyor and into the bale chamber, and when the screed is in the lowered position, the screed closes the gap thereby obstructing the conveyed crop material to the baler so that crop material conveyed by the first conveyor remains on the first conveyor and does not enter the bale chamber while the baler is traversing a field; and

wherein the accumulation frame comprises a first width defined by a first distance transverse to the direction of movement of the conveying surface and starting from the first side wall and ending at the second side wall, and wherein the bale chamber comprises a second width defined by a second distance between the plural side walls, the first distance greater than the second distance.

2. The continuous baling system of claim 1 , further comprising an active narrowing sub-system disposed proximal to an inlet to the bale chamber and the conveying surface.

3. The continuous baling system of claim 2 , wherein the active narrowing sub-system comprises one or more augers coupled to a shaft of a rotatable feeding rotor of the baler.

4. The continuous baling system of claim 2 , wherein the active narrowing sub-system comprises plural stub augers rotatably coupled to the respective first and second side walls.

5. The continuous baling system of claim 4 , wherein the plural stub augers are located proximal to a screed coupled to the accumulation frame.

6. The continuous baling system of claim 1 , further comprising a passive narrowing sub-system disposed proximal to an inlet to the bale chamber and adjacent the conveying surface.

7. The continuous baling system of claim 6 , wherein the passive narrowing sub-system comprises plural wedges coupled to the respective first and second side walls.

8. The continuous baling system of claim 7 , wherein plural wedges are located proximal to a screed coupled to the accumulation frame.

9. The continuous baling system of claim 1 , wherein the first distance is approximately two feet greater than the second distance.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 26, 2013
From: OLANDER, BRIAN D.; JAMES, CHARLIE O.; BLOUGH, CEDRIC J.
To: AGCOC CORPORATION
Reel/Frame 031675/0005 →
Continuity (2)
Provisional Application 61730070 · Nov 27, 2012
Related Publication 20140144119A1 · May 29, 2014