IP Library Granted Patent US 9,588,166
Granted Patent B2
US 9,588,166 · App. 14/685,550 · Granted Mar 7, 2017

Ground quality check systems and methods

Inventors: Mark L. Stephenson (Bellingham, WA); Aaron Michelle (Bellingham, WA)
Assignee: WOOD STONE CORPORATION
G01R31/025G01R31/42G01R29/027
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,588,166
App. No.
14/685,550
Granted
Mar 7, 2017
Kind
B2
Abstract

A ground check system for checking a ground conductor of a power supply comprising at least one line conductor comprises a pulse generator and a compare circuit. The pulse generator applies a test signal to a test circuit formed at least in part by the ground conductor and the at least one line conductor when an AC voltage on the at least one line conductor is approximately zero volts. The compare circuit compares the test signal passing through the test circuit with at least one test criteria indicative of an unacceptable ground.

Claims (44)

1. A ground check system for checking a ground conductor of a power supply comprising at least one line conductor, the ground check system comprising:

a pulse generator for applying a test signal to a test circuit formed at least in part by the ground conductor and the at least one line conductor when an AC voltage on the at least one line conductor is approximately zero volts; and

a compare circuit for comparing the test signal passing through the test circuit with at least one test criteria indicative of an unacceptable ground.

2. A ground check system as recited in claim 1 , in which the test criteria is indicative of at least one of a missing ground and a faulty ground.

3. A ground check system as recited in claim 1 , in which the test criteria determines whether a peak of the test signal falls within predetermined peak reference criteria.

4. A ground check system as recited in claim 1 , in which the test criteria determines whether a shape of the test signal falls within predetermined shape reference criteria.

5. A ground check system as recited in claim 1 , in which the test criteria determines whether a peak of the test signal falls within predetermined peak reference criteria and whether a shape of the test signal falls within predetermined shape reference criteria.

6. A ground check system as recited in claim 1 , further comprising a zero cross detector for generating a zero cross signal indicative of when an AC voltage on the at least one line conductor is at zero volts.

7. A ground check system as recited in claim 1 , further comprising a pulse peak detect system for generating a pulse peak data value indicative of the peak voltage of the test signal, where the compare circuit compares the pulse peak data value with a reference peak data value.

8. A ground check system as recited in claim 1 , further comprising a pulse shape detect system for generating a pulse data value indicative of the voltage of the test signal after a predetermined period of time, where the compare circuit compares the pulse shape data value with a reference shape data value.

9. A ground check system as recited in claim 1 , further comprising:

a pulse peak detect system for generating a pulse peak data value indicative of the peak voltage of the test signal;

a pulse shape detect system for generating a pulse data value indicative of the voltage of the test signal after a predetermined period of time; wherein

the compare circuit compares

the pulse peak data value with a reference peak data value; and

the pulse shape data value with a reference shape data value.

10. A method of checking a ground conductor of a power supply comprising at least one line conductor, the method comprising the steps of:

forming a test circuit including at least the ground conductor and the at least one line conductor;

applying a test signal to a test circuit when an AC voltage on the at least one line conductor is approximately zero volts; and

comparing the test signal passing through the test circuit with at least one test criteria indicative of an unacceptable ground.

11. A method recited in claim 10 , in which the test criteria is indicative of at least one of a missing ground and a faulty ground.

12. A method as recited in claim 10 , in which the test criteria determines whether a peak of the test signal falls within predetermined peak reference criteria.

13. A method as recited in claim 10 , in which the test criteria determines whether a shape of the test signal falls within predetermined shape reference criteria.

14. A method as recited in claim 10 , in which the test criteria determines whether a peak of the test signal falls within predetermined peak reference criteria and whether a shape of the test signal falls within predetermined shape reference criteria.

15. A method as recited in claim 10 , further comprising the step of detecting when an AC voltage on the at least one line conductor is at zero volts.

16. A method as recited in claim 10 , further comprising the step of generating a pulse peak data value indicative of the peak voltage of the test signal, where the step of comparing the test signal passing through the test circuit with at least one test criteria comprises the step of comparing the pulse peak data value with a reference peak data value.

17. A method as recited in claim 10 , further comprising the step of generating a pulse data value indicative of the voltage of the test signal after a predetermined period of time, where the step of comparing the test signal passing through the test circuit with at least one test criteria comprises the step of comparing the pulse shape data value with a reference shape data value.

18. A method as recited in claim 10 , further comprising the steps of:

generating a pulse peak data value indicative of the peak voltage of the test signal;

generating a pulse data value indicative of the voltage of the test signal after a predetermined period of time;

wherein the step of comparing the test signal passing through the test circuit with at least one test criteria comprises the steps of

comparing the pulse peak data value with a reference peak data value

comparing the pulse shape data value with a reference shape data value.

19. A ground check system for checking a ground conductor of a power supply comprising at least one line conductor, the ground check system comprising:

a zero cross detector for generating a zero cross signal indicative of when an AC voltage on the at least one line conductor is at zero volts;

a pulse generator for applying a test signal to a test circuit formed at least in part by the ground conductor and the at least one line conductor based on the zero cross signal;

a pulse peak detect system for generating a pulse peak data value indicative of the peak voltage of the test signal;

a pulse shape detect system for generating a pulse data value indicative of the voltage of the test signal after a predetermined period of time; and

a processor for generating a ground pass signal when the pulse peak data value meets predetermined peak criteria and the pulse shape data value meets predetermined shape criterial.

20. A ground check system as recited in claim 19 , in which;

the pulse shape detect system generating the pulse data value such that the pulse data value is indicative of the voltage of the test signal a predetermined period of time after a leading edge of the test signal; and

the processor generates the ground pass signal when

the pulse peak data value exceeds a reference peak data value;

the pulse shape data value exceeds a reference shape data value.

Assignments (3)
SECURITY INTEREST Recorded Apr 21, 2022
From: HENNY PENNY CORPORATION; HPC INVESTMENT COMPANY, LLC; HPC REAL ESTATE INVESTMENT I LTD.; WOOD STONE CORPORATION; WOOD STONE IDEAS, L.L.C.; IWD INNOVATIONS, LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 059747/0602 →
SECURITY INTEREST Recorded Dec 8, 2017
From: HENNY PENNY CORPORATION; HPC INVESTMENT COMPANY, LLC; HPC REAL ESTATE INVESTMENT I LTD.; WOOD STONE CORPORATION; WOOD STONE IDEAS, L.L.C.; IWD INNOVATIONS, LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 044777/0439 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 18, 2015
From: STEPHENSON, MARK L.; MICHELLE, AARON
To: WOOD STONE CORPORATION
Reel/Frame 035661/0951 →
Continuity (2)
Provisional Application 61978629 · Apr 11, 2014
Related Publication 20150293164A1 · Oct 15, 2015