Method for operating a combined-cycle power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,631,521
App. No.
14/199,506
Granted
Apr 25, 2017
Kind
B2
Abstract

Method for operating a combined-cycle power plant is provided. The plant includes at least a gas turbine and at least a steam power generation system. The plant activates at least one electric generator connectable to an electric grid, wherein the gas turbine includes a compressor. The steam power generation system includes a steam turbine, a heat recovery steam generator and a bypass line. The method is such that the gas turbine de-loads to a condition, where the compressor operates at its nominal speed. The method is such that the steam turbine de-loads in coordination with the de-load of the gas turbine, to a condition where the total load exported by the plant to the grid is substantially equal to zero, being both the gas turbine and the steam power generation system connected.

Claims (14)

1. A method for operating a combined-cycle power plant, the plant comprising at least a gas turbine and at least a steam power generation system, the plant activating at least one electric generator connectable to an electric grid, wherein the gas turbine comprises a compressor and wherein the steam power generation system comprises a steam turbine, a heat recovery steam generator and a bypass line, wherein the gas turbine de-loads to a condition, where the compressor operates at its nominal speed, the method comprising:

de-loading the steam turbine in coordination with the de-loading of the gas turbine to a condition where the total load exported by the plant to the grid is substantially equal to zero, wherein the gas turbine and the steam power generation system are connected; and

with the de-loading of the steam turbine, opening the bypass line to reduce the steam pressure to a fixed value relative to the nominal pressure,

wherein the de-loading of the steam turbine and the reduction of the steam pressure by acting on the bypass are such that the minimum steam turbine load and the minimum steam pressure are reached prior to the reduction of the steam temperature caused by the reduction of the gas turbine exhaust temperature during the de-loading of the gas turbine.

2. The method of claim 1 , wherein the steam turbine de-loads to a condition such that the steam turbine covers the internal auxiliary load demand of the plant and also covers the load necessary for maintaining the compressor operating at its nominal speed.

3. The method according to claim 1 , wherein the gas turbine is de-loaded following a gradient such that the steam temperature at the outlet of the heat recovery steam generator is above the allowable temperature required by the steam turbine, before the steam turbine has reached the minimum load condition.

4. The method according to claim 1 , wherein the bypass line opens to reduce the steam pressure to a fixed value between 15% and 100% of the nominal pressure.

5. The method according to claim 1 , wherein the bypass line opens to reduce the steam pressure to a fixed value between 30% and 50% of the nominal pressure.

6. The method according to claim 1 , wherein the generator is connected to the grid.

7. The method according to claim 1 , wherein the generator is disconnected from the grid.

8. A method for operating a combined-cycle power plant, the plant comprising at least a gas turbine and at least a steam power generation system, the plant activating at least one electric generator connectable to an electric grid, wherein the gas turbine comprises a compressor and wherein the steam power generation system comprises a steam turbine, a heat recovery steam generator and a bypass line, wherein the gas turbine de-loads to a condition, where the compressor operates at its nominal speed, the method comprising:

de-loading the steam turbine in coordination with the de-loading of the gas turbine to a condition where the total load exported by the plant to the grid is substantially equal to zero, wherein the gas turbine and the steam power generation system are connected, and the steam turbine provides primary frequency support to the plant by acting on a steam turbine control valve.

9. The method according to claim 8 , wherein with the de-loading of the steam turbine, the bypass line opens to reduce the steam pressure to a fixed value relative to the nominal pressure.

10. The method of claim 9 , wherein the de-loading of the steam turbine and the reduction of the steam pressure by acting on the bypass are such that the minimum steam turbine load and the minimum steam pressure are reached prior to the reduction of the steam temperature caused by the reduction of the gas turbine exhaust temperature during the de-loading of the gas turbine.

Assignments (2)
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 7, 2014
From: OLIA, HAMID; SCHLESIER, JAN; BREITFELD, MICHAEL; BRUNNER, PHILIPP
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 032837/0480 →