IP Library Granted Patent US 9,846,002
Granted Patent B2
US 9,846,002 · App. 14/574,469 · Granted Dec 19, 2017

Method and apparatus to determine an effective temperature of coolant fluid for a heat generating device

Inventor: Daniel J. Berry (Macomb Township, MI)
Assignee: GM Global Technology Operations LLC
F28F27/00F28D15/00G01K13/02H02K9/19H02K9/24G01K2013/026H02K11/25
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,846,002
App. No.
14/574,469
Granted
Dec 19, 2017
Kind
B2
Abstract

A method for dynamically monitoring temperature of a fluid at a heat generating device includes monitoring, using a temperature sensor, temperature of the fluid held in a fluidic sump. A first fluidic flow rate and a second fluidic flow rate are determined. A third fluidic flow rate and a temperature drop of the fluid across the heat exchanger in the active coolant circuit are determined based upon the temperature of the fluid and the third fluidic flow rate through the active coolant circuit. A fluid temperature supplied to the electric machine through the active coolant circuit is determined based upon the third fluidic flow rate and the temperature drop of the fluid across the heat exchanger. An effective temperature of the fluid is determined based upon the temperature of the fluid in the sump and the temperature of the fluid supplied to the electric machine through the active coolant circuit.

Claims (10)

1. A method for dynamically monitoring temperature of fluid employed in a cooling system for an electric machine, the cooling system including a fluidic pump fluidly connected to a passive coolant circuit and an active coolant circuit each in fluidic communication with the electric machine, wherein the active coolant circuit includes an air-cooled heat exchanger and a passive bypass control valve and a bypass circuit, the method comprising:

monitoring, using a temperature sensor, temperature of the fluid held in a fluidic sump supplying the fluid to the fluidic pump;

determining a first fluidic flow rate through the passive coolant circuit and a second fluidic flow rate through the active coolant circuit;

determining a third fluidic flow rate and a temperature drop of the fluid across the heat exchanger in the active coolant circuit based upon the temperature of the fluid and the third fluidic flow rate through the active coolant circuit, including determining a magnitude of opening of the passive bypass control valve based upon the temperature of the fluid, and determining the third fluidic flow rate across the heat exchanger based upon the magnitude of opening of the passive bypass control valve,

wherein the third fluidic flow rate is equal to the second fluidic flow rate when the temperature of the fluid is greater than an upper threshold temperature for activating the passive bypass control valve;

determining a fluid temperature supplied to the electric machine through the active coolant circuit based upon the third fluidic flow rate and the temperature drop of the fluid across the heat exchanger; and

determining an effective fluid temperature at the electric machine based upon the temperature of the fluid in the sump and the temperature of the fluid supplied to the electric machine through the active coolant circuit.

2. The method of claim 1 , wherein the third fluidic flow rate is zero when the temperature of the fluid is less than a minimum threshold temperature for activating the passive bypass control valve.

3. The method of claim 1 , wherein the heat exchanger comprises an air-cooled heat exchanger, and wherein determining a temperature drop of the fluid across the heat exchanger in the active coolant circuit based upon the temperature of the fluid and the third fluidic flow rate through the active coolant circuit further comprises determining the temperature drop of the fluid across the heat exchanger based upon the temperature of the fluid, the third fluidic flow rate and an ambient air temperature.

4. The method of claim 1 , wherein determining the effective fluid temperature based upon the temperature of the fluid in the sump and the temperature of the fluid supplied to the electric machine through the active coolant circuit comprises aggregating the first flow rate and the temperature of the fluid in the sump and aggregating the second flow rate and the temperature of the fluid supplied to the electric machine through the active coolant circuit.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 18, 2014
From: BERRY, DANIEL J.
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 034540/0055 →
Continuity (1)
Related Publication 20160178548A1 · Jun 23, 2016