IP Library Granted Patent US 9,863,286
Granted Patent B2
US 9,863,286 · App. 14/281,335 · Granted Jan 9, 2018

Combined cycle power plant system and related control systems and program products

Inventors: Awadesh Kumar Tiwari (Bangalore, IN); William Forrester Seely (Taylors, SC)
Assignee: General Electric Company
F01K23/101F01K7/165F01K23/18G05B15/02G05B23/0224Y02E20/16
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,863,286
App. No.
14/281,335
Granted
Jan 9, 2018
Kind
B2
Abstract

Various embodiments include a system having: at least one computing device configured to monitor a combined-cycle (CC) power plant during a transient event by performing actions including: determining whether a change in an operating condition of a component of the CC power plant is unintentional, the determining including comparing control system instructions for the component of the CC power plant with a reference look-up table, the reference look-up table including correlation data for the control system instructions for the component and historical data about the operating condition of the component; and providing instructions to a control system of the CC power plant to modify the operating condition in the CC power plant in response to determining that the change in operating condition of the component is unintentional.

Claims (25)

1. A system comprising:

a component of a combined-cycle (CC) power plant

at least one computing device configured to monitor the CC power plant during a transient event, wherein the CC power plant includes at least one steam turbine (ST), at least one gas turbine (GT), and at least one bypass conduit bypassing one of the at least one ST or the at least one GT, the at least one computing device configured to monitor the CC power plant during the transient event by performing actions including:

determining whether a change in an operating condition of the component of the CC power plant is unintentional, the determining including comparing control system instructions for the component of the CC power plant with a reference look-up table, the reference look-up table including correlation data for the control system instructions for the component and historical data about the operating condition of the component, wherein the correlation data indicates a predicted operating condition for the component

wherein the at least one computing device is configured to build the reference look-up table by compiling historical data about the CC power plant, the historical data including, for at least one of the at least one ST or at least one of the at least one of the GT: a temperature rise, an exhaust temperature, a steam flow, an inlet pressure, an inlet air temperature, a drum level or a feed-water flow;

wherein the historical data is updated periodically in order to improve a real-time accuracy of the historical data;

the at least one computing device is configured to determine the change in the operating condition of the component in response to actual data about the operating condition deviating from the predicted operating condition and providing modification instructions to a control system of the CC power plant to modify the operating condition in the CC power plant in response to determining that the change in operating condition of the component is unintentional.

2. The system of claim 1 , wherein the historical data further includes a bypass conduit steam flow and a bypass pressure for the bypass conduit.

3. The system of claim 1 , wherein the operating condition includes a power sharing proportion between the at least one ST and the at least one GT, a load rejection by the at least one ST or the at least one GT, a bypass flow rate through the at least one bypass conduit, or a power drop by the at least one ST or the at least one GT.

4. The system of claim 3 , wherein the operating condition is measured by at least one of ST megawatt output, GT megawatt output or fluid pressure in the bypass conduit.

5. The system of claim 1 , wherein the at least one computing device is further configured to calculate at least one of a degree of degradation of the CC power plant based upon the operating condition, a level of manual intervention required to modify the operating condition, and a prediction of performance of the CC power plant, based upon the modification instructions to modify the operating condition.

6. A system comprising:

a combined-cycle (CC) power plant having:

at least one steam turbine (ST);

at least one gas turbine (GT); and

at least one bypass conduit bypassing one of the at least one ST or the at least one GT; and

at least one computing device configured to monitor the CC power plant during a transient event by performing actions including:

determining whether a change in an operating condition of a component of the CC power plant is unintentional, the determining including comparing control system instructions for the component of the CC power plant with a reference look-up table, the reference look-up table including correlation data for the control system instructions for the component and historical data about the operating condition of the component, wherein the correlation data indicates a predicted operating condition for the component;

wherein the at least one computing device is configured to build the reference look-up table by compiling historical data about the CC power plant, the historical data including, for at least one of the at least one ST or at least one of the at least one of the GT: a temperature rise, an exhaust temperature, a steam flow, an inlet pressure, an inlet air temperature, a drum level or a feed-water flow;

wherein the historical is updated periodically in order to improve a real-time accuracy of the historical data;

the at least one computing device is configured to determine the change in the operating condition of the component in response to actual data about the operating condition deviating from the predicted operating condition and providing a plurality of instructions to a control system of the CC power plant to modify the operating condition in the CC power plant in response to determining that the change in operating condition of the component is unintentional.

7. The system of claim 6 , wherein the historical data further includes a bypass conduit steam flow and a bypass pressure for the bypass conduit.

8. The system of claim 6 , wherein the operating condition includes a power sharing proportion between the at least one ST and the at least one GT, a load rejection by the at least one ST or the at least one GT, a bypass flow rate through the at least one bypass conduit, or a power drop by the at least one ST or the at least one GT.

9. The system of claim 8 , wherein the operating condition is measured by at least one of ST megawatt output, GT megawatt output or fluid pressure in the bypass conduit.

10. The system of claim 6 , wherein the at least one computing device is further configured to calculate at least one of a degree of degradation of the CC power plant based upon the operating condition, a level of manual intervention required to modify the operating condition, and a prediction of performance of the CC power plant, based upon the modification instructions to modify the operating condition.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 065727/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 19, 2014
From: TIWARI, AWADESH KUMAR; SEELY, WILLIAM FORRESTER
To: GENERAL ELECTRIC COMPANY
Reel/Frame 032925/0269 →
Continuity (1)
Related Publication 20150330263A1 · Nov 19, 2015