IP Library Granted Patent US 9,991,713
Granted Patent B2
US 9,991,713 · App. 15/117,094 · Granted Jun 5, 2018

Energy storage system comprising a modular multi-level converter

Inventors: Tomas Tengner (Västerås, SE); Christopher Townsend (Newcastle, AU); Hector Zelaya de la Parra (Västerås, SE); Alireza Nami (Västerås, SE)
Assignee: ABB SCHWEIZ AB
H02J3/1857H02J3/28H02J3/36H02M7/483H02M2007/4835
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,991,713
App. No.
15/117,094
Granted
Jun 5, 2018
Kind
B2
Abstract

An energy storage system (ESS) for an electrical system includes an energy storage, and a converter interface arranged for connecting the energy storage to the electrical system. The converter interface includes a modular multilevel converter in which each phase leg includes a plurality of series connected cells of which at least one is a half-bridge cell and at least one is a full-bridge cell.

Claims (9)

1. A method performed in an energy storage system (ESS) being connected to a high voltage AC electrical system, the ESS comprising an energy storage and a converter interface having a DC link and connecting the energy storage to the high voltage AC electrical system, wherein the converter interface comprises a modular multilevel converter in which each phase leg comprises an upper arm connected to a positive pole of the DC link of the modular multilevel converter and a lower arm connected to a negative pole of the DC link of the modular multilevel converter, each arm comprising a plurality of series connected cells of which at least one is a half-bridge cell and at least one is a full-bridge cell, the method comprising:

when a DC link voltage (VDC, batt) provided by the energy storage is more than or equal to a peak-to-peak voltage (VAC, peak-peak) of the high voltage AC electrical system, operating the at least one full-bridge cell to produce positive voltage; and subsequently

when the DC link voltage (VDC, batt) provided by the energy storage is less than the peak-to-peak voltage (VAC, peak-peak) of the high voltage AC electrical system, operating the at least one full-bridge cell to produce negative voltage.

2. The method of claim 1 , wherein the ESS has a nominal voltage of at least 30 kV or at least 50 kV, and/or up to 70 kV or up to 100 kV.

3. The method of claim 1 , wherein the modular multilevel converter has three, and only three, phase legs.

4. The method of claim 3 , wherein the ESS has a nominal voltage of at least 30 kV or at least 50 kV, and/or up to 70 kV or up to 100 kV.

5. The method of claim 1 , wherein the energy storage comprises an electrochemical battery or a supercapacitor.

6. The method of claim 5 , wherein the modular multilevel converter has three, and only three, phase legs.

7. The method of claim 5 , wherein the ESS has a nominal voltage of at least 30 kV or at least 50 kV, and/or up to 70 kV or up to 100 kV.

Assignments (5)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 15, 2021
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 055589/0769 →
MERGER Recorded Aug 9, 2016
From: ABB TECHNOLOGY LTD
To: ABB SCHWEIZ AG
Reel/Frame 039380/0825 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2016
From: TENGNER, TOMAS; TOWNSEND, CHRISTOPHER; ZELAYA DE LA PARRA, HECTOR; NAMI, ALIREZA
To: ABB TECHNOLOGY LTD
Reel/Frame 039363/0691 →
Continuity (1)
Related Publication 20170170658A1 · Jun 15, 2017