IP Library Granted Patent US 7,323,038
Granted Patent B2
US 7,323,038 · App. 10/508,163 · Granted Jan 29, 2008

Separation of gases and solids using a cyclone

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,323,038
App. No.
10/508,163
Granted
Jan 29, 2008
Kind
B2
Abstract

Cyclone design comprising an inlet device having an inlet height (Hi) and an inlet width (Wi), a gas outlet pipe having a pipe diameter (Di) and a pipe penetration (P), a barrel having an upper barrel diameter (Db) and a barrel length (Lb), said barrel comprising a cylindrical volume on top of a conical volume, a solids outlet pipe (O), an inlet gas velocity (Ug, i) and an inlet gas flow (Q), characterised in that the ratio of the inlet gas flow to the square of the upper barrel diameter (Q/Db 2 ) is higher than 0.5, preferably higher than 0.7, and lower than 1.5, preferably lower than 1.2 (m/s) and in that the barrel length to diameter ratio (Lb/Db) is higher than 3, preferably higher than 3.5, and lower than 6, preferably lower than 4.5.

Claims (15)

1. A cyclone comprising an inlet device having an inlet height (Hi) and an inlet width (Wi), a gas outlet pipe having a pipe diameter (Di) and a pipe penetration (P), a barrel having an upper barrel diameter (Db) and a barrel length (Lb), said barrel comprising a cylindrical volume on top of a conical volume, a solids outlet pipe (O), an inlet gas velocity (Ug,i) and an inlet gas flow (Q), wherein the ratio of the inlet gas flow to the square of the upper barrel diameter (Q/Db 2 ) is higher than 0.5 and lower than 1.5 and the barrel length to diameter ratio (Lb/Db) is higher than 3 and lower than 6.

2. The cyclone according to claim 1 , wherein the inlet gas velocity is higher than 6 m/s.

3. The cyclone according to claim 1 , wherein the cyclone inlet height (Hi) and the gas outlet pipe penetration (P) are such that the ratio P/Hi is higher than 0.62 and lower than 1.25.

4. The cyclone according to claim 1 , wherein the cyclone does not comprise any vortex stabiliser.

5. A process comprising separating a mixture of gas and solids using the cyclone of any one of claims 1 - 4 .

6. A process comprising separating catalyst and polymer particles from a mixture of gas and solids exiting a gas phase polymerisation fluidised bed reactor using the cyclone of any one of claims 1 - 4 .

7. The process of claim 6 , wherein the gas phase polymerisation fluidised bed reactor is operated at an absolute pressure of between 0.5 and 6 MPa.

8. The cyclone according to claim 1 , wherein the ratio of the inlet gas flow to the square of the upper barrel diameter (Q/Db 2 ) is higher than 0.7.

9. The cyclone according to claim 1 , wherein the ratio of the inlet gas flow to the square of the upper barrel diameter (Q/Db 2 ) is lower than 1.2.

10. The cyclone according to claim 1 , wherein the barrel length to diameter ratio (Lb/Db) is higher than 3.5.

11. The cyclone according to claim 1 , wherein the barrel length to diameter ratio (Lb/Db) is lower than 4.5.

12. The process according to claim 5 , wherein the ratio of the inlet gas flow to the square of the upper barrel diameter (Q/Db 2 ) is higher than 0.7.

13. The process according to claim 5 , wherein the ratio of the inlet gas flow to the square of the upper barrel diameter (Q/Db 2 ) is lower than 1.2.

14. The process according to claim 6 , wherein the ratio of the inlet gas flow to the square of the upper barrel diameter (Q/Db 2 ) is higher than 0.7.

15. The process according to claim 6 , wherein the ratio of the inlet gas flow to the square of the upper barrel diameter (Q/Db 2 ) is lower than 1.2.

Assignments (11)
INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Feb 13, 2014
From: INEOS SALES (UK) LIMITED
To: BARCLAYS BANK PLC
Reel/Frame 032264/0400 →
INTELLECTUAL PROPERTY SECURITY AGREEMENT SUPPLEMENT Recorded Feb 13, 2014
From: INEOS SALES (UK) LIMITED
To: BARCLAYS BANK PLC
Reel/Frame 032264/0470 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 4, 2013
From: INEOS COMMERCIAL SERVICES UK LIMITED
To: INEOS SALES (UK) LIMITED
Reel/Frame 031618/0157 →
SECURITY AGREEMENT Recorded Jun 26, 2012
From: INEOS COMMERCIAL SERVICES UK LIMITED
To: BARCLAYS BANK PLC
Reel/Frame 028444/0639 →
SECURITY INTEREST Recorded Feb 23, 2012
From: INEOS COMMERCIAL SERVICES UK LIMITED
To: BARCLAYS BANK PLC
Reel/Frame 027748/0039 →
SECURITY INTEREST Recorded Nov 28, 2011
From: INEOS COMMERCIAL SERVICES UK LIMITED
To: BARCLAYS BANK PLC
Reel/Frame 027286/0657 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 4, 2011
From: INEOS EUROPE LIMITED
To: INEOS COMMERCIAL SERVICES UK LIMITED
Reel/Frame 027060/0015 →
CHANGE OF NAME Recorded Sep 5, 2007
From: O & D TRADING LIMITED
To: INNOVENE EUROPE LIMITED
Reel/Frame 019809/0548 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 5, 2007
From: BP CHEMICALS LIMITED
To: O&D TRADING LIMITED
Reel/Frame 019809/0550 →
CHANGE OF NAME Recorded Sep 5, 2007
From: INNOVENE EUROPE LIMITED
To: INEOS EUROPE LIMITED
Reel/Frame 019810/0457 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 5, 2007
From: REILING, VINCE
To: BP CHEMICALS LIMITED
Reel/Frame 019155/0108 →