IP Library Granted Patent US 8,860,246
Granted Patent B2
US 8,860,246 · App. 12/567,169 · Granted Oct 14, 2014

Systems and methods to balance solar panels in a multi-panel system

Inventors: Ron Hadar (Cupertino, CA); Shmuel Arditi (Los Gatos, CA)
Assignee: Tigo Energy, Inc.
H02J3/385Y02E10/58
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,860,246
App. No.
12/567,169
Granted
Oct 14, 2014
Kind
B2
Abstract

Systems and methods to balance currents among a plurality of photovoltaic units connected in series. In aspect, a management unit is coupled between a photovoltaic energy production unit and a string of energy production units. The management unit has an energy storage element (e.g., a capacitor) connected to the photovoltaic energy production unit. The management unit further has a switch to selectively couple to the energy storage element and the photovoltaic energy production unit to the string. The management unit allows the current in the string to be larger than the current in the photovoltaic energy production unit.

Claims (28)

1. A photovoltaic energy production system, comprising:

a power bus;

a plurality of photovoltaic energy production units;

a plurality of first management units coupled between the plurality of photovoltaic energy production units and the power bus to supply electricity generated by the photovoltaic energy production units onto the power bus, wherein

the power bus connects outputs of the first management units in series,

each respective management unit of the first management units is connected in parallel to an output of a respective photovoltaic energy production unit of the plurality of photovoltaic energy production units to receive electricity generated by the respective photovoltaic energy production unit and has only one output, the output of the respective management unit providing the electricity generated by the respective photovoltaic energy production unit to the power bus that connects the outputs of the first management units in series, wherein the respective management unit is configured to

determine operating parameters of the respective photovoltaic energy production unit, and

adjust the respective photovoltaic energy production unit to track a maximum power point of the respective photovoltaic energy production unit; and

an inverter coupled to the power bus to receive the electricity generated by the photovoltaic energy production units, the inverter configured to track a maximum power point while receiving the electricity from the power bus.

2. The system of claim 1 , wherein the inverter performs maximum power point tracking on the power bus, while at least one of the first management units adjusts a respective photovoltaic energy production unit to a maximum power point.

3. The system of claim 1 , further comprising:

a second management unit configured to determine at least one control parameter for the first management units, wherein each of the first management units is configured to adjust a respective photovoltaic energy production unit based on the at least one control parameter.

4. The system of claim 3 , wherein the second management unit is configured to determine a plurality of values of the at least one control parameter for the plurality of first management units respectively.

5. A method, comprising:

transmitting, from a plurality of first management units, operating parameters of a plurality of solar modules, wherein

a power bus connects outputs of the first management units in series,

each respective management unit of the plurality of first management units is connected in parallel to an output of a respective solar module of the plurality of solar modules to receive electricity generated by the respective solar module and has only one output, the output of the respective management unit providing the electricity generated by the respective solar module to the power bus that connects the outputs of the first management units in series, wherein the respective management unit is configured to

determine operating parameters of the respective solar module and,

adjust the respective solar module to track a maximum power point of the respective solar module;

receiving, by the first management units, at least one control parameter to operate at least one of the solar modules at a maximum power point, wherein the at least one control parameter is determined based on the operating parameters of the plurality of solar modules; and

performing, by an inverter connected to the power bus, maximum power point tracking, while the at least one of the solar module is operated by the first management units according to the at least one control parameter.

6. The method of claim 5 , further comprising:

determining the operating parameters of the plurality of solar modules by the plurality of first management units while the inverter is performing maximum power point tracking.

7. The method of claim 5 , further comprising:

stopping maximum power point tracking at the inverter while determining the operating parameters of the plurality of solar modules by the plurality of first management units; and

resuming maximum power point tracking at the inverter after determining the operating parameters of the plurality of solar modules by the plurality of first management units.

8. The method of claim 5 , wherein at least one of the first management units adjusts at least one of the solar modules according to the at least one control parameter, while the maximum power point tracking is performed by the inverter.

9. The method of claim 8 , wherein the at least one control parameter is selected from the group consisting of: duty cycle, phase shift, and synchronization pulse.

Assignments (10)
SECURITY INTEREST Recorded Mar 31, 2026
From: TIGO ENERGY, INC.
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 075306/0414 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN INTELLECTUAL PROPERTY RECORDED AT REEL 52252, FRAME 0289 Recorded Mar 30, 2026
From: GALLAGHER IP SOLUTIONS LLC, AS SUCCESSOR TO NEWLIGHT CAPITAL, LLC; UMB BANK, NATIONAL ASSOCIATION
To: TIGO ENERGY, INC.
Reel/Frame 075311/0457 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 20, 2026
From: TIGO ENERGY, INC.
To: TIGO ENERGY INNOVATIONS LLC
Reel/Frame 074447/0465 →
CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE PREVIOUSLY RECORDED AT REEL: 58755 FRAME: 516. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 2, 2025
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL LLC
Reel/Frame 072868/0423 →
RELEASE OF SECURITY INTEREST Recorded Feb 22, 2023
From: NEWLIGHT CAPITAL LLC; UMB BANK, NATIONAL ASSOCIATION, AS TRUSTEE
To: TIGO ENERGY, INC.
Reel/Frame 062821/0250 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 18, 2022
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL LLC
Reel/Frame 058755/0516 →
RELEASE OF SECURITY INTEREST Recorded Apr 7, 2020
From: WESTERN ALLIANCE BANK
To: TIGO ENERGY INC.
Reel/Frame 052329/0758 →
SECURITY INTEREST Recorded Mar 27, 2020
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL, LLC; UMB BANK, NATIONAL ASSOCIATION, AS TRUSTEE
Reel/Frame 052252/0289 →
SECURITY INTEREST Recorded Feb 12, 2018
From: TIGO ENERGY, INC.
To: WESTERN ALLIANCE BANK
Reel/Frame 045312/0467 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 29, 2009
From: HADAR, RON; ARDITI, SHMUEL
To: TIGO ENERGY, INC.
Reel/Frame 023300/0292 →
Continuity (4)
Continuation 12411317 · Mar 25, 2009
Provisional Application 61200601 · Dec 2, 2008
Provisional Application 61200279 · Nov 26, 2008
Related Publication 20100127571A1 · May 27, 2010