IP Library Granted Patent US 8,698,437
Granted Patent B2
US 8,698,437 · App. 13/033,898 · Granted Apr 15, 2014

System and method for providing auxiliary power by regeneration power management in mobile mining equipment

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,698,437
App. No.
13/033,898
Granted
Apr 15, 2014
Kind
B2
Abstract

A method for operating an ultracapacitor system used in a mining excavator powered by an electrical power source. The method includes the step of detecting whether a line power from the electrical power source is present. Next, a voltage level of the ultracapacitor system is measured if the line power is not present. The measured voltage level is then compared with a minimum voltage level for the ultracapacitor system. If the measured voltage level is more than the minimum voltage level, auxiliary power is supplied from the ultracapacitor system to operate mining excavator systems. The auxiliary power may be used to power electronic systems and components such as computers, displays, control systems, gas insulated switchgear and lighting systems.

Claims (34)

1. A method for operating an ultracapacitor system used in a mining excavator powered by an electrical power source, wherein an electrical load of the mining excavator comprises a first electrical load with at least one electrical motor and a second electrical load without an electrical motor, the method comprising the steps of:

detecting whether a line power from the electrical power source is present;

measuring a voltage level of the ultracapacitor system if the line power is not present;

comparing the measured voltage level with a minimum voltage level for the ultracapacitor system; and

supplying auxiliary power from the ultracapacitor system to the second electrical load if the measured voltage level is more than the minimum voltage level.

2. The method according to claim 1 further including the step of stopping operation of the mining excavator if the measured voltage is less than the minimum voltage level.

3. The method according to claim 1 wherein the ultracapacitor system is configured to provide approximately 8 hours of normal operation.

4. The method according to claim 1 wherein the minimum voltage level is 1500V.

5. The method according to claim 1 wherein a nominal voltage for the ultracapacitor system is approximately 1800V.

6. The method of claim 1 , further comprising the step of charging the ultracapacitor system with electrical power drawn from the electrical power source.

7. The method of claim 1 , wherein the electrical power source comprises a direct connection to a public utility electrical power grid.

8. The method of claim 1 , wherein the electrical power source outputs three-phase alternating current with a minimum voltage of at least one kilovolt.

9. The method of claim 8 , wherein the minimum voltage is at least three kilovolts.

10. The method of claim 1 , wherein the at least one mining excavator comprises at least one of:

an electric shovel; and

a dragline.

11. A method for operating an ultracapacitor system used in a mining excavator powered by an electrical power source, wherein an electrical load of the mining excavator comprises a first electrical load with at least one electrical motor and a second electrical load without an electrical motor, the method comprising the steps of:

operating the mining excavator to provide a cyclic load;

charging the ultracapacitor system with electrical power generated by the cyclic load during a regeneration interval;

detecting whether a line power from the electrical power source is interrupted;

measuring a voltage level of the ultracapacitor system if the line power is interrupted;

comparing the measured voltage level with a minimum voltage level for the ultracapacitor system; and

supplying auxiliary power from the ultracapacitor system to the second electrical load if the measured voltage level is more than the minimum voltage level.

12. The method of claim 11 , further comprising the step of charging the ultracapacitor system with electrical power drawn from the electrical power source.

13. The method of claim 11 , wherein the electrical power source comprises a direct connection to a public utility electrical power grid.

14. The method of claim 11 , wherein the electrical power source outputs three-phase alternating current with a minimum voltage of at least one kilovolt.

15. The method of claim 14 , wherein the minimum voltage is at least three kilovolts.

16. The method of claim 11 , wherein the at least one mining excavator comprises at least one of:

an electric shovel; and

a dragline.

17. The method according to claim 11 further including the step of stopping operation of the mining excavator if the measured voltage is less than the minimum voltage level.

18. The method according to claim 11 wherein the ultracapacitor system is configured to provide approximately 8 hours of normal operation.

19. The method according to claim 11 wherein the minimum voltage level is 1500V.

20. The method according to claim 11 wherein a nominal voltage for the ultracapacitor system is approximately 1800V.

Assignments (3)
CHANGE OF NAME Recorded Oct 13, 2023
From: SIEMENS LARGE DRIVES LLC
To: INNOMOTICS LLC
Reel/Frame 065225/0389 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 10, 2023
From: SIEMENS INDUSTRY, INC.
To: SIEMENS LARGE DRIVES LLC.
Reel/Frame 065191/0604 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 24, 2011
From: MAZUMDAR, JOY
To: SIEMENS INDUSTRY, INC.
Reel/Frame 025857/0232 →