IP Library Granted Patent US 8,963,368
Granted Patent B2
US 8,963,368 · App. 13/117,380 · Granted Feb 24, 2015

Maximum power point tracking method, photovoltaic system controller and photovoltaic system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,963,368
App. No.
13/117,380
Granted
Feb 24, 2015
Kind
B2
Abstract

Consistent with an example embodiment, a method of tracking a maximum power point (MPP) of a PV (photovoltaic) system comprises a circuit with a controller controlling a DC voltage-DC voltage converter for converting an output current of the PV system; the controller further comprises a memory. The method comprises measuring a first value of a PV system voltage at an initial MPP; storing said first value in said memory; periodically sampling a power output level of said PV system, and upon detecting a change in said power output level exceeding a first threshold, reading the first value from the memory; and adjusting a duty cycle of the DC voltage-DC voltage converter until the circuit voltage matches said first value; the method further comprising fine-tuning the duty cycle of the DC voltage-DC voltage converter to a further MPP following detecting a change in said power output level exceeding a first threshold.

Claims (34)

1. A method of tracking a maximum power point of a photovoltaic system including a circuit including a controller controlling a DC voltage-DC voltage converter for converting an output current of the photovoltaic system, the controller including a memory, the method comprising:

measuring a first value of a photovoltaic system operating voltage at an initial maximum power point;

storing said first value in the memory;

periodically sampling a power output level of the photovoltaic system, and upon detecting a change in the power output level exceeding a first threshold,

determining the actual value of the photovoltaic system operating voltage and comparing the actual value with the first value, and

conditional upon a difference between the actual value and the first value exceeding a further threshold:

reading the first value from the memory and

adjusting a duty cycle of the DC voltage-DC converter until the photovoltaic system operating voltage matches the first value;

the method further comprising, upon detecting a change in the power output level exceeding the first threshold, fine tuning the duty cycle for the DC voltage-DC voltage converter to a further maximum power point.

2. The method of claim 1 , wherein detecting the change in power level comprises detecting the change as a function of the delay between subsequent samples.

3. The method of claim 1 , wherein said fine-tuning comprises:

tracking the power output of the photovoltaic system following said adjusting step; and

adjusting the power output of the photovoltaic system by alternately increasing and decreasing the duty cycle of the DC voltage-DC voltage converter until a further maximum power point of the photovoltaic system is reached.

4. The method of claim 3 , further comprising:

measuring a second value of the photovoltaic system operating voltage at the further maximum power point; and

storing the second value in the memory, by overwriting the first value or by adding the second value to the memory.

5. The method of claim 4 , wherein:

the step of increasing the duty cycle of the DC voltage-DC voltage converter comprises stepwise increasing the duty cycle of the DC voltage-DC voltage converter in a number of steps each having a defined step size and measuring the power output of the photovoltaic system after each step until the power output measured after the penultimate step exceeds the power output measured after the last step;

the step of decreasing the duty cycle of the DC voltage-DC voltage converter comprises stepwise decreasing the duty cycle of the DC voltage-DC voltage converter in a number of steps each having a defined step size and measuring the power output of the photovoltaic system after each step until the power output measured after the penultimate step exceeds the power output measured after the last step; and

reducing the defined step size following the termination of a stepwise increasing or stepwise decreasing of the duty cycle.

6. The method of claim 4 , wherein the total number of alternate increases and decreases of the duty cycle is 3.

7. The method of claim 4 , wherein the step of tracking the power output of the photovoltaic system following said adjusting step comprises performing a two-point power output measurement for determining a differential power output of the photovoltaic system; and

initiating said adjusting step of the differential power output lies below a second threshold.

8. The method of claim 7 , further comprising:

performing a two-point power output measurement for determining a differential power output of the photovoltaic system during said fine-tuning; and

restarting said fine-tuning upon said determined differential power output exceeding a third threshold.

9. A photovoltaic system controller comprising:

a DC voltage-DC voltage converter for converting a direct current from a photovoltaic system into a further current; and

a controller for controlling a duty cycle of the DC voltage-DC voltage converter,

wherein the controller comprises a memory and a microprocessor having a set of instructions for implementing the method of claim 1 .

10. A photovoltaic system, comprising the photovoltaic system controller of claim 9 , the system further comprising at least one photovoltaic cell having an output conductively coupled to an input of the DC voltage-DC voltage converter.

11. The photovoltaic system of claim 10 , further comprising at least one battery having an input conductively coupled to an output of the DC voltage-DC voltage converter.

12. The photovoltaic system of claim 10 , further comprising a sensor for sensing the power output of the at least one photovoltaic cell, the controller being responsive to said sensor.

13. A computer program product, stored on a non-transitory computer-readable medium, comprising program code for, when executed on a computer processor, executing the steps of the method of claim 1 .

Assignments (12)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12298143 PREVIOUSLY RECORDED ON REEL 042762 FRAME 0145. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Oct 22, 2019
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 051145/0184 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12298143 PREVIOUSLY RECORDED ON REEL 038017 FRAME 0058. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Oct 22, 2019
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 051030/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12298143 PREVIOUSLY RECORDED ON REEL 039361 FRAME 0212. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Oct 22, 2019
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 051029/0387 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12298143 PREVIOUSLY RECORDED ON REEL 042985 FRAME 0001. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Oct 22, 2019
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 051029/0001 →
RELEASE OF SECURITY INTEREST Recorded Sep 10, 2019
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: NXP B.V.
Reel/Frame 050745/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12681366 PREVIOUSLY RECORDED ON REEL 038017 FRAME 0058. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded May 9, 2017
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 042985/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12681366 PREVIOUSLY RECORDED ON REEL 039361 FRAME 0212. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded May 9, 2017
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 042762/0145 →
PATENT RELEASE Recorded Aug 17, 2016
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: NXP B.V.
Reel/Frame 039707/0471 →
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVE APPLICATION 12092129 PREVIOUSLY RECORDED ON REEL 038017 FRAME 0058. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY AGREEMENT SUPPLEMENT. Recorded Jul 14, 2016
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 039361/0212 →
SECURITY AGREEMENT SUPPLEMENT Recorded Mar 7, 2016
From: NXP B.V.
To: MORGAN STANLEY SENIOR FUNDING, INC.
Reel/Frame 038017/0058 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 7, 2015
From: NXP B.V.
To: III HOLDINGS 6, LLC
Reel/Frame 036304/0330 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 9, 2011
From: NAIR, MUKESH BALANCHANDRAN; MURTY, NAGAVOLU SRINIVASA; BHAT, DATTATREYA SHANKAR
To: NXP, B.V.
Reel/Frame 026721/0049 →