IP Library Granted Patent US 8,787,316
Granted Patent B2
US 8,787,316 · App. 13/336,798 · Granted Jul 22, 2014

Mechanism for 3rd generation partnership project multiple inter-network quality of service continuity

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,787,316
App. No.
13/336,798
Granted
Jul 22, 2014
Kind
B2
Abstract

A system to promote connectivity for inter-radio access technology (RAT) handover from a first radio access network (RAN) to a second radio access network (RAN) is provided. The system comprises a component configured such that for each access point name (APN) in communication with the first radio access network (RAN), the maximum bit rate (MBR) for each active non-guaranteed bit rate (non-GBR) bearer in the second radio access network (RAN) is determined based on each respective access point name's (APN's) used aggregate maximum bit rate (AMBR) and the number of active non-guaranteed bit rate(s) (non-GBR) bearers for the respective access point name (APN).

Claims (25)

1. A method for quality of service (QoS) parameters mapping during a handover from a first radio access network (RAN) to a second RAN, the first RAN and the second RAN having communication with one or more access point names (APNs), comprising:

deriving, for the second RAN, an APN aggregated maximum bit rate (APN-AMBR) for each of the one or more APNs based on a maximum bit rate (MBR) of one or more packet data protocol (PDP) contexts of the first RAN, the first RAN including one of a universal terrestrial radio access network (UTRAN) or a global system for mobiles (GSM) enhanced data for GSM evolution radio access network (GERAN) and the second RAN including an evolved universal terrestrial radio access network (E-UTRAN).

2. The method of claim 1 , further comprising providing a local user equipment (UE) aggregated maximum bit rate (UE-AMBR) until a subscribed UE-AMBR is available for the UE.

3. The method of claim 2 , further comprising:

acquiring the subscribed UE-AMBR;

calculating a derived UE-AMBR; and

comparing the derived UE-AMBR to the local UE-AMBR.

4. The method of claim 3 , wherein calculating a derived UE-AMBR comprises taking the minimum of the subscribed UE-AMBR and the sum of the derived APN-AMBRs of the one or more APNs associated with the UE.

5. The method of claim 2 , wherein the local UE-AMBR is based on a sum of the one or more derived APN-AMBR.

6. The method of claim 3 further comprising notifying the derived UE-AMBR to the second RAN by initiating a subscribed quality of service (QoS) modification procedure.

7. The method of claim 6 , wherein the notification of the derived UE-AMBR is a first notification and the subscribed QoS modification procedure further provides a second notification of a subscribed APN-AMBR, and wherein the first notification is provided to an enhanced node-B (eNB) of the second RAN and the second notification is provided to a serving gateway and packet data network gateway.

8. The method of claim 6 , wherein the subscribed QoS modification procedure is initiated if the local UE-AMBR is different from the derived UE-AMBR.

9. A device configured to provide quality of service (QoS) parameters mapping during a handover from a first radio access network (RAN) to a second RAN, the first RAN and the second RAN having communication with one or more access point names (APNs), the device comprising:

one or more hardware processors configured to:

derive, for the second RAN, an APN aggregated maximum bit rate (APN-AMBR) for each of the one or more APNs based on a maximum bit rate (MBR) of one or more packet data protocol (PDP) contexts of the first RAN, the first RAN including one of a universal terrestrial radio access network (UTRAN) or a global system for mobiles (GSM) enhanced data for GSM evolution radio access network (GERAN) and the second RAN including an evolved universal terrestrial radio access network (E-UTRAN).

10. The device of claim 9 , wherein the one or more hardware processors are further configured to provide a local user equipment (UE) aggregated maximum bit rate (UE-AMBR) until a subscribed UE-AMBR is available for the UE.

11. The device of claim 10 , wherein the one or more hardware processors are further configured to:

acquire the subscribed UE-AMBR;

calculate a derived UE-AMBR; and

compare the derived UE-AMBR to the local UE-AMBR.

12. The device of claim 11 , wherein calculating a derived UE-AMBR comprises taking the minimum of the subscribed UE-AMBR and the sum of the derived APN-AMBRs of the one or more APNs associated with the UE.

13. The device of claim 10 , wherein the local UE-AMBR is based on a sum of the one or more derived APN-AMBR.

14. The device of claim 11 , the one or more hardware processors are further configured to the notify the derived UE-AMBR to the second RAN by initiating a subscribed quality of service (QoS) modification procedure.

15. The device of claim 14 , wherein the notification of the derived UE-AMBR is a first notification and the subscribed QoS modification procedure further provides a second notification of a subscribed APN-AMBR, and wherein the first notification is provided to an enhanced node-B (eNB) of the second RAN and the second notification is provided to a serving gateway and packet data network gateway.

16. The device of claim 14 , wherein the subscribed QoS modification procedure is initiated if the local UE-AMBR is different from the derived UE-AMBR.

Assignments (9)
CORRECTIVE ASSIGNMENT TO CORRECT THE ADDED PATENT NUMBER TO REMOVE PATENT NO. 8,873,407 AT PREVIOUSLY RECORDED ON REEL 64066 FRAME 1. ASSIGNOR(S) HEREBY CONFIRMS THE NUNC PRO TUNC ASSIGNMENT EFFECTIVE DATE MARCH 20, 2023. Recorded Feb 2, 2026
From: BLACKBERRY LIMITED
To: MALIKIE INNOVATIONS LIMITED
Reel/Frame 074921/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT 12817157 APPLICATION NUMBER PREVIOUSLY RECORDED AT REEL: 064015 FRAME: 0001. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Sep 5, 2023
From: OT PATENT ESCROW, LLC
To: MALIKIE INNOVATIONS LIMITED
Reel/Frame 064807/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE COVER SHEET AT PAGE 50 TO REMOVE 12817157 PREVIOUSLY RECORDED ON REEL 063471 FRAME 0474. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Sep 5, 2023
From: BLACKBERRY LIMITED
To: OT PATENT ESCROW, LLC
Reel/Frame 064806/0669 →
NUNC PRO TUNC ASSIGNMENT Recorded Jun 19, 2023
From: BLACKBERRY LIMITED
To: MALIKIE INNOVATIONS LIMITED
Reel/Frame 064066/0001 →
NUNC PRO TUNC ASSIGNMENT Recorded Jun 16, 2023
From: OT PATENT ESCROW, LLC
To: MALIKIE INNOVATIONS LIMITED
Reel/Frame 064015/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 27, 2023
From: BLACKBERRY LIMITED
To: OT PATENT ESCROW, LLC
Reel/Frame 063471/0474 →
CHANGE OF NAME Recorded May 7, 2014
From: RESEARCH IN MOTION LIMITED
To: BLACKBERRY LIMITED
Reel/Frame 032836/0938 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 6, 2012
From: RESEARCH IN MOTION CORPORATION
To: RESEARCH IN MOTION LIMITED
Reel/Frame 027492/0339 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 6, 2012
From: ZHAO, XIAOMING; WU, WEI
To: RESEARCH IN MOTION CORPORATION
Reel/Frame 027492/0305 →