IP Library Granted Patent US 9,225,587
Granted Patent B2
US 9,225,587 · App. 13/514,184 · Granted Dec 29, 2015

Mechanism for alarm management of Femto related systems to avoid alarm floods

Inventors: Yi Zhang (Beijing, CN); Wei Hua Zhou (Beijing, CN); Shun Liang Zhang (Beijing, CN); Christian Markwart (Munich, DE)
Assignee: NOKIA SOLUTIONS AND NETWORKS OY
H04L41/06H04L43/06H04L43/0823H04W24/02H04W8/265
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,225,587
App. No.
13/514,184
Granted
Dec 29, 2015
Kind
B2
Abstract

A method of alarm management in a communications system having a number of Femto base stations, the method comprising the steps of: detecting disruption of a communication link between a Femto base station and a management system via which alarms are communicated; blocking the sending of alarms by the Femto base station; generating a report representative of the accumulation of alarms; detecting re-establishment of the communication link; sending the report to the management system; and reporting alarms to the management system on the basis of the report.

Claims (35)

1. A method of alarm management in a communications system performed by a node, the method of alarm management comprising the steps of: detecting disruption of a communication link between a node and a management system due to a communication link failure; blocking the sending of alarms by the node; generating a report representative of an accumulation of alarms, wherein the report is periodically updated over the time period of the communication disruption; detecting re-establishment of the communication link; and sending the report to the management system upon the re-establishment of the communication link; wherein the alarms are reported to the management system on the basis of the report, wherein the management system carries out alarm synchronization with the node to avoid alarm information inconsistencies.

2. A method according to claim 1 in which the node comprises a Femto base station.

3. A method according to claim 1 in which the alarms are generated when the node detects a problem and then generates a corresponding internal indication.

4. A method according to claim 1 in which the node puts the alarms into alarm lists.

5. A method according to claim 4 in which after the communication link is re-established, the node sends at least some alarms that have been stored in the alarm lists during the period that the communication link was disrupted.

6. A method according to claim 1 in which the report includes information relating to a number of pending alarms which are indicated as needing to be sent to the management system.

7. A method according to claim 1 in which a fault management functionality of the node applies blocking if the communication link is disrupted.

8. A method according to claim 1 in which blocking involves application of a command to block temporarily transfer of expedited and queued alarms until the block is removed.

9. A method according to claim 1 in which blocking is applied by the node.

10. A method according to claim 1 in which during blocking a list of current alarms remains unblocked.

11. A method according to claim 1 in which unblocking is applied by the management system.

12. A method according to claim 1 in which the management system uses a synchronisation command to obtain from the node a list of current alarms.

13. A method of alarm management in a communications system performed by a node, the method of alarm management comprising the steps of:

detecting disruption of a communication link between a node and a management system via which alarms are communicated;

blocking the sending of alarms by the node;

generating a report representative of an accumulation of alarms;

detecting re-establishment of the communication link; and

sending the report to the management system;

wherein the alarms are reported to the management system on the basis of the report,

wherein the management system carries out alarm synchronization with the node to avoid alarm information inconsistencies or alarm flooding,

wherein the node puts the alarms into alarm lists, and

wherein the report is generated in a report generation block which receives a notification that there is a disruption to the communication link and responds by establishing connections to various alarm lists in the node and obtaining from them information which is to be used to generate the report.

14. A method of alarm management in a communications system performed by a node, the method of alarm management comprising the steps of:

detecting disruption of a communication link between a node and a management system via which alarms are communicated;

blocking the sending of alarms by the node;

generating a report representative of an accumulation of alarms;

detecting re-establishment of the communication link; and

sending the report to the management system;

wherein the alarms are reported to the management system on the basis of the report,

wherein the management system carries out alarm synchronization with the node to avoid alarm information inconsistencies or alarm flooding, and

wherein after re-establishment of the communication link, the management system synchronises alarms with the node by carrying out at least one of the following: sending pending alarms to the management system if it is determined that there is a sufficiently small number of alarms to be reported, resetting the node if it is determined that there is too large a number of alarms to be reported, and re-constructing overwritten alarms.

15. A communications system capable of managing alarms, the system comprising: a node being able to communicating alarms to a management system, determining by the node failure to communicate the alarms to the management system due to a disruption of the communication link, and being capable of blocking the sending of alarms, the node comprising a report generating block to generate a report representative of an accumulation of alarms, wherein the report is periodically updated over the time period of the communication disruption, the node being capable of sending the report to the management system when it has determined that there is no longer disruption of the communication link, wherein the alarms are reported to the management system based on the report, wherein the management system carries out alarm synchronization with the node to avoid alarm information inconsistencies.

16. A node capable of managing alarms in a communications system, the node being able to communicate alarms to a management system, the node being capable of determining failure to communicate the alarms to the management system due to a disruption of the communication link, and being capable of blocking the sending of alarms, the node comprising a report generating block to generate a report representative of an accumulation of alarms, wherein the report is periodically updated over the time period of the communication disruption, when it has determined that there is no longer disruption of the communication link, the node being capable of sending the report to the management system, wherein reporting alarms to the management system is carried out based on the report, wherein the management system carries out alarm synchronization with the node to avoid alarm information inconsistencies.

17. A computer program embodied on a non-transitory computer-readable medium, said computer program comprising software code that when executed on a computing system performs a method of alarm management in a communications system comprising the steps of: detecting by the node failure to communicate alarms to a management system due to a disruption of a communication link between a node and a management system; blocking the sending of alarms by the node; generating a report representative of an accumulation of alarms, wherein the report is periodically updated over the time period of the communication disruption; detecting re-establishment of the communication link; sending the report to the management system upon the re-establishment of the communication link; and reporting alarms to the management system on the basis of the report, wherein the management system carries out alarm synchronization with the node to avoid alarm information inconsistencies.

18. A computer program according to claim 17 having executable code portions which are capable of carrying out the steps of the method.

Assignments (10)
PATENT SECURITY AGREEMENT Recorded Apr 22, 2023
From: RPX CORPORATION
To: BARINGS FINANCE LLC, AS COLLATERAL AGENT
Reel/Frame 063429/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 28, 2021
From: PROVENANCE ASSET GROUP LLC
To: RPX CORPORATION
Reel/Frame 059352/0001 →
RELEASE OF SECURITY INTEREST Recorded Nov 30, 2021
From: NOKIA US HOLDINGS INC.
To: PROVENANCE ASSET GROUP HOLDINGS LLC; PROVENANCE ASSET GROUP LLC
Reel/Frame 058363/0723 →
RELEASE OF SECURITY INTEREST Recorded Nov 30, 2021
From: CORTLAND CAPITAL MARKETS SERVICES LLC
To: PROVENANCE ASSET GROUP HOLDINGS LLC; PROVENANCE ASSET GROUP LLC
Reel/Frame 058983/0104 →
ASSIGNMENT AND ASSUMPTION AGREEMENT Recorded Feb 14, 2019
From: NOKIA USA INC.
To: NOKIA US HOLDINGS INC.
Reel/Frame 048370/0682 →
SECURITY INTEREST Recorded Sep 13, 2017
From: PROVENANCE ASSET GROUP HOLDINGS, LLC; PROVENANCE ASSET GROUP LLC
To: NOKIA USA INC.
Reel/Frame 043879/0001 →
SECURITY INTEREST Recorded Sep 13, 2017
From: PROVENANCE ASSET GROUP HOLDINGS, LLC; PROVENANCE ASSET GROUP, LLC
To: CORTLAND CAPITAL MARKET SERVICES, LLC
Reel/Frame 043967/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 13, 2017
From: NOKIA TECHNOLOGIES OY; NOKIA SOLUTIONS AND NETWORKS BV; ALCATEL LUCENT SAS
To: PROVENANCE ASSET GROUP LLC
Reel/Frame 043877/0001 →
CHANGE OF NAME Recorded Nov 19, 2014
From: NOKIA SIEMENS NETWORKS OY
To: NOKIA SOLUTIONS AND NETWORKS OY
Reel/Frame 034294/0603 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 1, 2012
From: ZHANG, YI; ZHOU, WEI HUA; ZHANG, SHUN LIANG; MARKWART, CHRISTIAN
To: NOKIA SIEMENS NETWORKS OY
Reel/Frame 028700/0160 →
Continuity (1)
Related Publication 20120287773A1 · Nov 15, 2012