IP Library Granted Patent US 9,955,463
Granted Patent B2
US 9,955,463 · App. 13/666,489 · Granted Apr 24, 2018

Method and system for battery energy savings for carrier aggregation

Inventors: Jianfeng Weng (Kanata, CA); Yiping Wang (Allen, TX); Jun Li (Richardson, TX)
Assignee: BlackBerry Limited
H04W72/042H04L5/001H04L5/0098H04W52/0216H04L5/0044H04L5/0053H04W72/0453Y02B60/50
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,955,463
App. No.
13/666,489
Granted
Apr 24, 2018
Kind
B2
Abstract

A method at a user equipment having a scheduling carrier and at least one scheduled carrier, the method receiving, at a first subframe from the scheduling carrier, a downlink control indication containing a downlink assignment for the user equipment on the scheduled carrier; and turning on a receiver of the user equipment for the scheduled carrier at a future downlink subframe based on the downlink assignment. Further, a method, at a scheduling cell having a scheduling carrier, for scheduling downlink data reception on a scheduled carrier, the method setting a time skew for the scheduled carrier such that a data transmission start time for a subframe at the scheduled carrier is greater than a blind latency decode time on the scheduling carrier.

Claims (62)

1. A method at a user equipment having a scheduling carrier and at least one scheduled carrier, the method comprising:

receiving a first higher layer indication from the scheduling carrier to turn on future downlink subframe scheduling for each of the at least one scheduled carrier;

when future downlink subframe scheduling is turned on:

receiving, at a first subframe from the scheduling carrier, a first downlink control indication containing a first downlink assignment for the user equipment on a selected carrier of the at least one scheduled carrier;

turning on a receiver of the user equipment for the selected carrier at a future downlink subframe based on the first downlink assignment;

receiving a second higher layer indication from the scheduling carrier to turn off future downlink subframe scheduling for each of the at least one scheduled carrier;

when future downlink subframe scheduling is turned off:

receiving, at a second subframe from the scheduling carrier, a second downlink control indication containing a second downlink assignment for the user equipment on the selected carrier; and

turning on the receiver of the user equipment for the selected carrier during the second subframe based on the second downlink assignment;

wherein the first higher layer indication is distinct from the first downlink control indication.

2. The method of claim 1 , wherein the future downlink subframe is the next available downlink subframe.

3. The method of claim 1 , wherein the higher layer indication is sent over radio resource control or medium access control signaling.

4. The method of claim 1 , wherein an unused value in a CrossCarrierSchedulingConfig IE pdsch-Start field is used for the higher layer signaling.

5. The method of claim 1 , further comprising receiving, on a downlink control indication of the selected carrier, at the future downlink subframe, an indication to override the existing downlink assignment.

6. A user equipment having a scheduling carrier and at least one scheduled carrier comprising:

a processor; and

a communications subsystem;

wherein the user equipment is configured to:

receive a first higher layer indication from the scheduling carrier to turn on future downlink subframe scheduling for each of the at least one scheduled carrier;

when future downlink subframe scheduling is turned on:

receive at a first subframe from the scheduling carrier, a first downlink control indication containing a first downlink assignment for the user equipment on a selected carrier of the at least one scheduled carrier;

turn on a receiver of the user equipment for the selected carrier at a future downlink subframe based on the first downlink assignment;

receive a second higher layer indication from the scheduling carrier to turn off future downlink subframe scheduling for each of the at least one scheduled carrier;

when future downlink subframe scheduling is turned off:

receive, at a second subframe from the scheduling carrier, a second downlink control indication containing a second downlink assignment for the user equipment on the selected carrier; and

turn on the receiver of the user equipment for the selected carrier during the second subframe based on the second downlink assignment;

wherein the first higher layer indication is distinct from the first downlink control indication.

7. The user equipment of claim 6 , wherein the future downlink subframe is the next available downlink subframe.

8. The user equipment of claim 6 , wherein the higher layer indication is sent over radio resource control or medium access control signaling.

9. The user equipment of claim 6 , wherein an unused value in a CrossCarrierSchedulingConfig IE pdsch-Start field is used for the higher layer signaling.

10. The user equipment of claim 6 , further configured to receive, on a downlink control indication of the selected carrier, at the future downlink subframe, an indication to override the existing downlink assignment.

11. A method, at a scheduling cell, for scheduling downlink data reception for a scheduled cell, the method comprising,

providing a first indication to at least one user equipment that downlink assignments on any carrier of at least one scheduled carrier for the scheduled cell are for future downlink subframes;

when future downlink subframe scheduling is turned on:

transmitting a first downlink assignment to the at least one user equipment on a selected carrier of the at least one scheduled carrier;

determining a future downlink subframe;

transmitting data corresponding to the first downlink assignment during the future downlink subframe on the selected carrier;

providing a second indication to the at least one user equipment that downlink assignments on any carrier of the at least one scheduled carrier for the scheduled cell are for a current downlink subframe;

when future downlink subframe scheduling is turned off:

transmitting a second downlink assignment to the at least one user equipment on the selected carrier;

transmitting data corresponding to the second downlink assignment during the current downlink subframe on the selected carrier;

wherein the first indication is distinct from the first downlink assignment.

12. The method of claim 11 , wherein the first indication is sent over radio resource control or medium access control signaling.

13. The method of claim 12 , wherein an unused value in a CrossCarrierSchedulingConfig IE pdsch-Start field is used for the first indication.

14. The method of claim 11 , wherein the future downlink subframe is the next downlink subframe after the downlink assignment.

15. A network element for scheduling downlink data reception for a scheduled cell, the network element comprising:

a processor; and

a communications system,

wherein the network element is configured to:

provide a first indication to at least one user equipment that downlink assignments on any carrier of at least one scheduled carrier for the scheduled cell are for future downlink subframes;

when future downlink subframe scheduling is turned on:

transmit a first downlink assignment to the at least one user equipment on a selected carrier of the at least one scheduled carrier;

determine a future downlink subframe;

transmit data corresponding to the first downlink assignment during the future downlink subframe on the selected carrier;

provide a second indication to the at least one user equipment that downlink assignments on any carrier of the at least one carrier for the scheduled cell are for a current downlink subframe;

when future downlink subframe scheduling is turned off:

transmit a second downlink assignment to the at least one user equipment on the selected carrier;

transmit data corresponding to the second downlink assignment during the current downlink subframe on the selected carrier;

wherein the first indication is distinct from the first downlink assignment.

16. The network element of claim 15 , wherein the first indication is sent over radio resource control or medium access control signaling.

17. The network element of claim 16 , wherein an unused value in a CrossCarrierSchedulingConfig IE pdsch-Start field is used for the first indication.

18. The network element of claim 15 , wherein the future downlink subframe is the next downlink subframe after the downlink assignment.

Assignments (6)
NUNC PRO TUNC ASSIGNMENT Recorded Jun 19, 2023
From: BLACKBERRY LIMITED
To: MALIKIE INNOVATIONS LIMITED
Reel/Frame 064271/0199 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 16, 2023
From: BLACKBERRY LIMITED
To: MALIKIE INNOVATIONS LIMITED
Reel/Frame 064104/0103 →
CHANGE OF NAME Recorded Oct 16, 2014
From: RESEARCH IN MOTION LIMITED
To: BLACKBERRY LIMITED
Reel/Frame 034012/0111 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 8, 2013
From: WANG, YIPING; LI, JUN
To: RESEARCH IN MOTION CORPORATION
Reel/Frame 031571/0042 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 8, 2013
From: WENG, JIANFENG
To: RESEARCH IN MOTION LIMITED
Reel/Frame 031571/0076 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 26, 2013
From: RESEARCH IN MOTION CORPORATION
To: RESEARCH IN MOTION LIMITED
Reel/Frame 029873/0453 →
Continuity (1)
Related Publication 20140119253A1 · May 1, 2014