IP Library Granted Patent US 9,137,758
Granted Patent B2
US 9,137,758 · App. 13/881,185 · Granted Sep 15, 2015

Process for controlling the transmission power in the uplink communication channel, and UE for doing the same

Inventors: Filipe Teixeira (Pruille-le-Chetif, FR); Laurent De Luca (L'Hermitage, FR); Anne Gourden (Le Mans, FR)
Assignee: ST-ERICSSON SA
H04W52/146H04W52/325H04W52/367
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,137,758
App. No.
13/881,185
Granted
Sep 15, 2015
Kind
B2
Abstract

A process for controlling the power transmission in the uplink of the User Equipment communicating with a Base Station in a GSM wireless communication system, said process including the steps of: initializing an audio/speech/data transmission channel; monitoring the power control commands generated by said Base station, said command determining a power transmission strength to be used by the UE, said power transmission strength being within a power transmission window; determining for each block to be transmitted whether it includes a control channel or a traffic/idle channel; applying, in response to said determination, a first power transmission level in case of a control block or a second power transmission level in case of a traffic/idle block, both power transmission levels being included within said range transmission window and the first power transmission level being higher for FACCH blocks than the second power transmission level used for traffic data; and transmitting said block and repeating the preceding step until the receipt of a new power control command.

Claims (17)

1. Process for controlling the power transmission in the uplink of a User Equipment (UE) communicating with a Base Station (BS) in a GSM wireless communication system, said process including the steps of:

initializing an audio/speech/data transmission channel;

monitoring the power control commands generated by said Base Station, said commands determining a power transmission strength to be used by the UE within a power transmission window;

determining for each block to be transmitted whether it includes a control channel or a traffic channel;

applying, in response to said determination, a first power transmission level in case of a control block or a second power transmission level in case of a traffic/idle block, both power transmission levels being included within said range transmission window and the first power transmission level being higher for Fast Associated Control Channel (FACCH) blocks than the second power transmission level used for traffic data; and

transmitting said block ( 350 ) and repeating the preceding step until receipt of a new power control command.

2. Process according to claim 1 , wherein said control channel is a Slow Associated Control Channel (SACCH) or a Fast Associated Control Channel.

3. Process according to claim 1 , wherein no increase of the power transmission in applied on the control blocks when said base station already requests the higher level of transmission.

4. User Equipment for communicating with a Base Station in a GSM wireless communication system, said User Equipment comprising a transceiver includes:

means for initializing an audio/speech/data transmission channel;

means for monitoring the power control commands generated by said Base Station, said command determining a power transmission strength to be used by the UE, said power transmission strength being within a power transmission window;

means for determining for each block to be transmitted whether it includes a control channel or a traffic/idle channel;

means for applying, in response to said determination, a first power transmission level in case of a control block or a second power transmission level in case of a traffic/idle block, both power transmission levels being included within said range transmission window and the first power transmission level being higher for FACCH blocks than the second power transmission level used for traffic data; and

means for transmitting said block and repeating the preceding step until receipt of a new power control command.

5. User Equipment according to claim 4 , wherein said control channel is a Slow Associated Control Channel or a Fast Associated Control Channel.

6. User Equipment according to claim 4 , wherein no increase of the power transmission in applied on the control blocks when said base station already requests the higher level of transmission.

7. User Equipment according to claim 4 , wherein the User Equipment is a mobile telephone.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 7, 2019
From: OPTIS CIRCUIT TECHNOLOGY, LLC,
To: TELEFONAKTIEBOLAGET L M ERICSSON (PUBL)
Reel/Frame 048529/0510 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 5, 2019
From: ST-ERICSSON SA, EN LIQUIDATION
To: OPTIS CIRCUIT TECHNOLOGY, LLC,
Reel/Frame 048504/0519 →
STATUS CHANGE-ENTITY IN LIQUIDATION Recorded Feb 2, 2016
From: ST-ERICSSON SA
To: ST-ERICSSON SA, EN LIQUIDATION
Reel/Frame 037739/0493 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 25, 2013
From: TEIXEIRA, FILIPE; DE LUCA, LAURENT; GOURDEN, ANNE
To: ST-ERICSSON SA
Reel/Frame 030285/0979 →
Priority Claims (1)
EP 10368042 · Nov 12, 2010 · regional
Continuity (2)
Provisional Application 61427383 · Dec 27, 2010
Related Publication 20130217405A1 · Aug 22, 2013