IP Library Granted Patent US 10,240,447
Granted Patent B2
US 10,240,447 · App. 14/494,030 · Granted Mar 26, 2019

Method for optimizing conductivity in a hydraulic fracturing operation

Inventors: D. V. Satyanarayana Gupta (The Woodlands, TX); Jimie DeVon Lemons (Houston, TX); William D. Holcomb (The Woodlands, TX); Harold Dean Brannon (Magnolia, TX)
Assignee: Baker Hughes, a GE company, LLC
E21B43/267C09K8/805E21B43/006
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,240,447
App. No.
14/494,030
Granted
Mar 26, 2019
Kind
B2
Abstract

A method of distributing proppant in a spatial arrangement throughout a created or enlarged fracture by pumping into a subterranean formation penetrated by a well multiple stages of fracturing fluid wherein a fluid laden with proppant is pumped into the well and a fluid substantially free of proppant is then pumped into the well; the fluid of the fluid laden with proppant and the fluid substantially free of proppant being the same. Vertically extending pillars are created within the formation. Fluid produced from the hydrocarbon-bearing reservoir is then flowed at least partially through channels between the vertically extending pillars.

Claims (24)

1. A method of hydraulically fracturing a hydrocarbon-bearing formation with fluids which comprises:

(a) pumping into the formation a first fluid laden with proppant disposed in a superabsorbent polymer;

(b) pumping into the formation a second fluid substantially free of proppant;

(c) breaking the superabsorbent polymer with a breaker and releasing the proppant therefrom;

(d) creating vertically extended pillars from the released proppant and creating conductive flow channels between the pillars; and

(e) flowing fluids produced from the hydrocarbon-bearing reservoir at least partially through the channels between the vertically extending pillars.

2. The method of claim 1 , wherein the superabsorbent polymer comprises a plurality of crosslinks.

3. The method of claim 1 , wherein the superabsorbent polymer includes a repeat unit which comprises a polysaccharide, an acrylate, an acrylamide, a poly vinyl acetate, a derivative thereof, or a combination thereof.

4. A method of hydraulically fracturing a hydrocarbon-bearing subterranean formation which comprises:

(a) pumping into the formation a fluid containing a breaker, the fluid being laden with proppant disposed in a crosslinked superabsorbent polymer;

(b) pumping into the formation a fluid substantially free of proppant;

(c) reacting the breaker with the superabsorbent polymer and breaking a bond in a polymer chain of the superabsorbent polymer, a bond in a crosslink of the superabsorbent polymer, a bond between a crosslink and a chain of the superabsorbent polymer or a mixture thereof;

(d) releasing the proppant from the reaction product of step (c) and forming pillars from the released proppant; and

(e) flowing fluids produced from the hydrocarbon-bearing reservoir at least partially through the channels between the vertically extending pillars.

5. The method of claim 4 , wherein the superabsorbent polymer is a polysaccharide or contains repeating units of an acrylate, an acrylamide, a vinylpyrrolidone, vinyl acetate, vinyl alcohol, 2-acrylamide-2-methylpropanesulfonic acid or a derivative thereof crosslinked with a crosslinker.

6. The method of claim 4 wherein the rate of pumping of the fluid containing proppant and the fluid substantially free of proppant is substantially the same.

7. The method of claim 4 wherein the volume of the fluid containing proppant and the volume of fluid substantially free of proppant are substantially the same.

8. The method of claim 4 , wherein the fluid containing proppant is an ultra lightweight proppant having an apparent specific gravity less than or equal to about 2.45.

9. The method of claim 4 , wherein at least one of the following conditions prevail:

(a) the proppant of the fluid with proppant is coated with a resin; or

(b) the proppant of the fluid with proppant is a plastic bead.

10. The method of claim 4 , wherein the relative permeability of the reservoir is less than about 1 mD.

11. The method of claim 10 , wherein the permeability of the reservoir is less than about 0.1 mD.

12. The method of claim 4 , wherein the proppant of the fluid with proppant is a coated plastic bead and further wherein the bead comprises a polystyrene divinylbenzene or a polyamide or a derivative thereof.

Assignments (4)
CHANGE OF NAME Recorded Feb 16, 2022
From: BAKER HUGHES, A GE COMPANY, LLC
To: BAKER HUGHES HOLDINGS LLC
Reel/Frame 059128/0907 →
CHANGE OF NAME Recorded Feb 16, 2018
From: BAKER HUGHES INCORPORATED
To: BAKER HUGHES, A GE COMPANY, LLC
Reel/Frame 045349/0522 →
ENTITY CONVERSION Recorded Oct 4, 2017
From: BAKER HUGHES INCORPORATED
To: BAKER HUGHES, A GE COMPANY, LLC
Reel/Frame 044127/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 17, 2014
From: GUPTA, D.V. SATYANARAYANA; LEMONS, JIMIE DEVON; HOLCOMB, WILLIAM D.; BRANNON, HAROLD DEAN
To: BAKER HUGHES INCORPORATED
Reel/Frame 034532/0596 →
Continuity (2)
Provisional Application 61882858 · Sep 26, 2013
Related Publication 20150083420A1 · Mar 26, 2015
Cited By (9)
US 12,365,828 US 12,466,992 US 12,521,764 US 12,540,273 US 12,637,611 US 12,649,875 US 12,650,066 US 12,662,624 US 12,674,380