IP Library Granted Patent US 10,756,545
Granted Patent B2
US 10,756,545 · App. 15/203,595 · Granted Aug 25, 2020

Enhanced systems and methods for using a power converter for balancing modules in single-string and multi-string configurations

Inventors: Shmuel Arditi (Discovery Bay, CA); Maxym Makhota (Cupertino, CA)
Assignee: Tigo Energy, Inc.
H02J3/385H01L31/02021H02J1/00H02J3/382H02J3/383H02J3/386H02J3/387Y02E10/563Y02E10/58Y02E10/763
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,756,545
App. No.
15/203,595
Granted
Aug 25, 2020
Kind
B2
Abstract

Apparatuses and methods include a solar array having one or more string buses of series-connected solar modules. The current outputs from the solar modules on each string bus can be balanced along with the voltage output from the string buses. Local management units coupled between the solar modules and the string buses are configured to control the voltage output from each solar module. When the solar modules on each string are balanced, and when the string buses are balanced (or before the solar modules and string buses are balanced), an inverter or other device connected to the solar array can find the array's maximum power point via a maximum power point tracking algorithm.

Claims (12)

1. A photovoltaic system, comprising:

a plurality of photovoltaic modules;

a plurality of management units coupled with the plurality of photovoltaic modules respectively, wherein each of the plurality of management units includes communication circuitry configured to:

broadcast an operating parameter to at least one other management unit in the plurality of management units,

receive, from a second management unit in the plurality of management units, a second operating parameter of the second management unit,

compute one or more of a duty cycle and phase parameter based on a ratio between the operating parameter and the second operating parameter, and

operate a respective photovoltaic module at a maximum power point based on the computing.

2. The photovoltaic system of claim 1 , further comprising:

a maximum power point tracker coupled to a series connection of power outputs of the plurality of management units, the maximum power point tracker is configured to track the maximum power point of the series connection as a whole.

3. The photovoltaic system of claim 2 , wherein the respective management unit includes a power converter configured to convert the input to the power output.

4. The photovoltaic system of claim 3 , wherein the respective management unit is configured to adjust operations of the power converter to adjust a second current-voltage curve at the second terminals of the respective management unit.

5. The photovoltaic system of claim 4 , wherein the respective management unit provides electric power received from the respective module solely to the power output connected in the series connection.

Assignments (10)
SECURITY INTEREST Recorded Mar 31, 2026
From: TIGO ENERGY, INC.
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 075306/0414 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN INTELLECTUAL PROPERTY RECORDED AT REEL 52252, FRAME 0289 Recorded Mar 30, 2026
From: GALLAGHER IP SOLUTIONS LLC, AS SUCCESSOR TO NEWLIGHT CAPITAL, LLC; UMB BANK, NATIONAL ASSOCIATION
To: TIGO ENERGY, INC.
Reel/Frame 075311/0457 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 20, 2026
From: TIGO ENERGY, INC.
To: TIGO ENERGY INNOVATIONS LLC
Reel/Frame 074447/0465 →
CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE PREVIOUSLY RECORDED AT REEL: 58755 FRAME: 516. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 2, 2025
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL LLC
Reel/Frame 072868/0423 →
RELEASE OF SECURITY INTEREST Recorded Feb 22, 2023
From: NEWLIGHT CAPITAL LLC; UMB BANK, NATIONAL ASSOCIATION, AS TRUSTEE
To: TIGO ENERGY, INC.
Reel/Frame 062821/0250 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 18, 2022
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL LLC
Reel/Frame 058755/0516 →
RELEASE OF SECURITY INTEREST Recorded Apr 7, 2020
From: WESTERN ALLIANCE BANK
To: TIGO ENERGY INC.
Reel/Frame 052329/0758 →
SECURITY INTEREST Recorded Mar 27, 2020
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL, LLC; UMB BANK, NATIONAL ASSOCIATION, AS TRUSTEE
Reel/Frame 052252/0289 →
SECURITY INTEREST Recorded Feb 12, 2018
From: TIGO ENERGY, INC.
To: WESTERN ALLIANCE BANK
Reel/Frame 045312/0467 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 6, 2016
From: ARDITI, SHMUEL; MAKHOTA, MAXYM
To: TIGO ENERGY, INC.
Reel/Frame 039089/0945 →
Continuity (4)
Continuation 12612641 · Nov 4, 2009
Provisional Application 61273932 · Aug 10, 2009
Provisional Application 61273931 · Aug 10, 2009
Related Publication 20170012435A1 · Jan 12, 2017
Cited By (1)
US 12,626,851