IP Library Patent Application 16841400
Patent Application
App. No. 16/841,400

Systems and Methods to Balance Solar Panels in a Multi-panel System

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
16/841,400
Abstract

Systems and methods to balance currents among a plurality of photovoltaic units connected in series. In aspect, a management unit is coupled between a photovoltaic energy production unit and a string of energy production units. The management unit has an energy storage element (e.g., a capacitor) connected to the photovoltaic energy production unit. The management unit further has a switch to selectively couple to the energy storage element and the photovoltaic energy production unit to the string. The management unit allows the current in the string to be larger than the current in the photovoltaic energy production unit.

Claims (10)

1 . A management unit in a photovoltaic energy production system, comprising:

a circuit to periodically connect and disconnect a solar module to and from a power bus according to a duty cycle, the duty cycle being adjustable to operate the solar module at a maximum power point; and

a controller to receive operating parameters from first management units coupled to the power bus, each of the first management units to determine operating parameters of a respective solar module and transmit the operating parameters of the respective solar module to the controller, the controller to determine duty cycles for the first management units based at least in part on the operating parameters received from the first management units.

2 . The management unit of claim 1 , wherein the power bus is a serial power bus.

3 . The management unit of claim 2 , wherein each of the first management units has a switch to periodically connect and disconnect a respective solar module to and from the power bus.

4 . The management unit of claim 3 , wherein the controller is configured to determine different phases for respective switches in the first management units.

5 . The management unit of claim 2 , wherein the operating parameters include at least one of: current, voltage, and temperature.

6 . The management unit of claim 5 , wherein the controller is configured to calculate estimated maximum power points of solar modules connected on the serial power bus, wherein the duty cycles are determined based on the estimated maximum power points of the solar modules.

7 . The management unit of claim 1 , wherein the management unit has only one output to supply electricity generated by the solar module coupled to the circuit.

8 . The management unit of claim 1 , wherein the management unit is connected in series with the first management units of solar modules on the serial power bus.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 20, 2026
From: TIGO ENERGY, INC.
To: TIGO ENERGY INNOVATIONS LLC
Reel/Frame 074447/0465 →
CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE PREVIOUSLY RECORDED AT REEL: 58755 FRAME: 516. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 2, 2025
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL LLC
Reel/Frame 072868/0423 →
RELEASE OF SECURITY INTEREST Recorded Feb 22, 2023
From: NEWLIGHT CAPITAL LLC; UMB BANK, NATIONAL ASSOCIATION, AS TRUSTEE
To: TIGO ENERGY, INC.
Reel/Frame 062821/0250 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 18, 2022
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL LLC
Reel/Frame 058755/0516 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2020
From: HADAR, RON; ARDITI, SHMUEL
To: TIGO ENERGY, INC.
Reel/Frame 052360/0412 →