Patent Assignment
Reel/Frame 055103/0409
Assignment of Assignor's Interest
Recorded: 2021-02-01
Pages: 6
Assignors
CHEATHAM, JESSE R., III
Executed: 2020-10-29
CORBIN, ROBERT A.
Executed: 2020-10-29
GILLELAND, JOHN R.
Executed: 2021-01-08
HEJZLAR, PAVEL
Executed: 2020-10-29
KRAMER, KEVIN
Executed: 2021-01-11
MARTIN, CHRISTOPHER A.
Executed: 2021-01-25
MORRIS, BRIAN
Executed: 2020-10-29
PETROSKI, ROBERT C.
Executed: 2021-01-08
SCHLOSS, PHILIP M.
Executed: 2021-01-08
WALTER, JOSHUA C.
Executed: 2021-01-22
WERNER, MARK R.
Executed: 2021-01-31
Assignee
TERRAPOWER, LLC
15800 NORTHUP WAY, BELLEVUE, WASHINGTON, 98008
Covered Properties
(2)
Nuclear Thermal Plant with Load-Following Power Generation
PCT:
PCT/US2020/051128 ↗
Thermal Energy Storage System Connected To Both A Nuclear Reactor And A Power Generator