Patent Assignment
Reel/Frame 060378/0488
Corrective Assignment to Correct the Conveying Party Name Previously Recorded at Reel: 040621 Frame: 0929. Assignor(S) Hereby Confirms the Merger.
Recorded: 2022-05-11
Pages: 29
Assignor
ABB TECHNOLOGY AG
Executed: 2016-05-09
Assignee
ABB SCHWEIZ AG
BROWN BOVERI STRASSE 6, BADEN, 5400, SWITZERLAND
Covered Properties
(12)
Dc Connection System for Renewable Power Generators
Collision Detection in Eia-485 Bus Systems
Single Piece Frame for Transformer Core/Coil Assembly
Flange Attachment
Test System for High-Voltage Components
High-Voltage Transformer
Tank for Electrical Equipment
Transformer in-Situ Inspection Vehicle with a Cage Hull
Methods, Systems, and Computer Readable Media for Monitoring and Management of a Power Distribution System
Working Cylinder for a Drive of an Electric Circuit Breaker
Network Interface for Transmitting Protection Data of a Power Network
Method for Processing Data Streams with Multiple Tenants
Related Assignments
(5)
Other recorded transfers of the patents in this record — the chain of ownership.
Merger
Nov 15, 2016
From: ABB TECHNOLOGY LTD.
To: ABB SCHWEIZ AG
Reel/Frame 040621/0929 →
Assignment of Assignor's Interest
Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →
Assignment of Assignor's Interest
Mar 15, 2021
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 055589/0769 →
Change of Name
Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
Merger
Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →