Patent Assignment
Reel/Frame 062292/0329
Assignment of Assignor's Interest
Recorded: 2023-01-04
Pages: 3
Assignor
YANGTZE UNIVERSITY
Executed: 2022-12-14
Assignee
JINGZHOU MODERN PETROLEUM TECHNOLOGY DEVELOPMENT CO. LTD
NO. 8 JINGSHA DADAO, JINGZHOU, CHINA
Covered Properties
(2)
Integrated Construction Method of Fracturing and Tertiary Oil Recovery for Low-Permeability Reservoir
Slick Water Volumetric Fracturing Method with Large Liquid Volume, High Flow Rate, Large Preflush and Low Sand Ratio
Related Assignments
(2)
Other recorded transfers of the patents in this record — the chain of ownership.
Assignment of Assignor's Interest
Nov 3, 2019
From: YU, WEICHU; ZENG, QINGWEN; ZHANG, YING; XIAO, XIANGSONG
To: YANGTZE UNIVERSITY
Reel/Frame 050898/0074 →
Assignment of Assignor's Interest
Nov 3, 2019
From: YU, WEICHU; ZHOU, DONGKUI; ZHANG, YING; XIAO, XIANGSONG
To: YANGTZE UNIVERSITY
Reel/Frame 050898/0103 →