Patent Assignment
Reel/Frame 065841/0013
Assignment of Assignor's Interest
Recorded: 2023-12-12
Pages: 4
Assignors
LI, WEI
Executed: 2023-12-06
WANG, SONGXU
Executed: 2023-12-06
YU, YONGSHENG
Executed: 2023-12-06
ZHANG, WENLU
Executed: 2023-12-06
WU, JIANHUA
Executed: 2023-12-06
CHEN, GUOZHONG
Executed: 2023-12-06
WANG, KAI
Executed: 2023-12-06
Assignees
CENTRAL SOUTH UNIVERSITY
NO. 932 SOUTH LUSHAN ROAD, CHANGSHA, HUNAN, 410083, CHINA
NATIONAL RAILWAY ADMINISTRATION EQUIPMENT TECHNOLOGY CENTER
12/F, BUILDING 20, SECTION 3, NUODE CENTER, FENGTAI DISTRICT, BEIJING, 100071, CHINA
SCIENCE AND TECHNOLOGY RESEARCH INSTITUTE OF DAQIN RAILWAY CO., LTD.
NO. 328 JIANSHE NORTH ROAD, XINGHUALING DISTRICT, TAIYUAN, SHANXI, 030000, CHINA
CHANGSHA NANRUI RAIL TRANSPORT ELECTRIC EQUIPMENT CO., LTD.
BUILDING 10-B, ADVANCED BUSINESS PARK OF CHANGSHA, NO. 688, SECTION 2, WANJIALI SOUTH ROAD, TIANXIN DISTRICT, CHANGSHA, HUNAN, 410016, CHINA
Covered Property
(1)
Heavy-Haul Train and Longitudinal Dynamics Traction Operation Optimization Control System and Method Thereof