IP Library Granted Patent US 6,858,061
Granted Patent B2
US 6,858,061 · App. 10/276,212 · Granted Feb 22, 2005

Method and device for producing pig iron or liquid steel pre-products from charge materials containing iron ore

Assignee: Voest-Alpine Industrieanlagenbau GmbH & Co.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,858,061
App. No.
10/276,212
Granted
Feb 22, 2005
Kind
B2
Abstract

The invention relates to a process for producing pig iron or liquid primary steel products in a blast furnace, CO 2 being substantially removed from at least a partial stream of a top gas emerging from a reduction shaft furnace ( 1 ), and this partial stream if appropriate being heated and being introduced into the blast furnace as reduction gas, and to a plant for carrying out this process, the top gas being introduced into the lower region of the blast-furnace shaft. This measure results in an improved energy balance and improved process management compared to the prior art.

Claims (24)

1. A process for producing pig iron or liquid primary steel products in a blast furnace, the process comprising:

reducing iron-oxide containing charge materials in a reduction shaft furnace which produces top gas including CO 2 ;

substantially removing the CO 2 from at least a partial stream of top gas emerging from the reduction shaft furnace;

heating the partial stream of top gas from which the CO 2 had been substantially removed, the heating being by partial combustion of the top gas; and

then introducing the heated partial stream as a reduction gas, into a lower region of a shaft of a blast furnace.

2. The process of claim 1 , further comprising:

reducing a portion of iron ore containing charge materials in the reduction shaft furnace by use of a reduction gas;

melting the reduced iron particles obtained in a melter gasifier along with coal and oxygen containing gas for producing the reduction gas, and at the same time the reduction gas is formed feeding the gas to a reduction zone of the reduction shaft furnace.

3. The process of claim 1 , wherein the top gas with CO 2 removed is heated to above 750° C. by partial combustion.

4. The process of claim 3 , wherein prior to the partial combustion, the top gas from which the CO 2 has been substantially removed is at least one of recuperatively and regeneratively preheated to at least between 300° C. and 600° C.

5. A plant for producing pig iron or liquid primary steel products in a blast furnace, the plant comprising:

a blast furnace for producing pig iron or liquid primary steel products, the blast furnace having a lower region and a blast furnace shaft in the lower region;

a reduction shaft furnace for reducing lumpy iron ore and also producing a top gas during the reduction, the reduction shaft furnace having an outlet line for the reduction product and having a top gas outlet line;

a CO 2 removal device connected with the top gas outlet line for receiving top gas from the top gas outlet line and removing CO 2 therefrom;

at least one introduction line for introducing warm top gas which is substantially free of CO 2 into the shaft in the lower region of the blast furnace; and

a reactor connected by lines to the CO 2 removal device and to the blast furnace shaft for partially combusting the top gas before the top gas is introduced to the blast furnace shaft.

6. The plant according to claim 5 , wherein the reduction shaft furnace has a feed line for reduction gas;

a melter gasifier in the feed line for reduction gas;

a line for carrying the reduction product out of the reduction shaft furnace, and opening into the melter gasifier;

feed lines to the melter gasifier for oxygen containing gases;

an outlet line from the reduction shaft furnace for transmitting the reduction gas which is formed.

7. A plant according to claim 6 , wherein the feed lines are for at least one of oxygen containing gases appropriate dust and carbon carriers.

8. A plant according to claim 5 , further comprising at least one line for feeding oxygen containing medium for partial combustion of the top gas; and

a heating reactor for receiving the oxygen containing medium and for the partial combustion in the reactor of the top gas.

Assignments (4)
CHANGE OF NAME Recorded Nov 18, 2016
From: VOEST-ALPINE INDUSTRIEANLAGENBAU GMBH & CO
To: SIEMENS VAI METALS TECHNOLOGIES GMBH & CO
Reel/Frame 040370/0788 →
CHANGE OF NAME Recorded Nov 18, 2016
From: SIEMENS VAI METALS TECHNOLOGIES GMBH
To: PRIMETALS TECHNOLOGIES AUSTRIA GMBH
Reel/Frame 040371/0321 →
MERGER Recorded Nov 18, 2016
From: SIEMENS VAI METALS TECHNOLOGIES GMBH & CO
To: SIEMENS VAI METALS TECHNOLOGIES GMBH
Reel/Frame 040647/0715 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 14, 2002
From: KEPPLINGER, LEOPOLD WERNER; MIZELLI, HERBERT; WURM, JOHANN
To: VOEST-ALPINE INDUSTRIEANLAGENBAU GMBH & CO.
Reel/Frame 014132/0661 →
Priority Claims (1)
AT A 8392000 · May 15, 2000 · national
Continuity (1)
Related Publication 20040216560A1 · Nov 4, 2004