IP Library Granted Patent US 7,317,314
Granted Patent B2
US 7,317,314 · App. 10/525,077 · Granted Jan 8, 2008

Method for measuring stress/strain using Barkhausen noises

Assignees: EADS Deutschland GmbH; AIRBUS Deutschland GmbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,317,314
App. No.
10/525,077
Granted
Jan 8, 2008
Kind
B2
Abstract

In a method of measuring stress/strain by detecting Barkhausen noise, an exciting/sensing device is arranged at least adjacent to a magnetic or magnetizable element, and passing an increasing magnetizing current through the exciting device. The start of the Barkhausen noise in the element, as a function of the magnetizing current is detected by the sensing device, and the magnetizing current at that time represents a measurement of the stress/strain condition of the element.

Claims (23)

1. A method of measuring stress/strain of magnetic or magnetizable elements by detecting Barkhausen noise, comprising:

arranging an exciting/sensing device at least adjacent to said element;

applying a continuously rising magnetizing current to the exciting device;

detecting starting of Barkhausen noise by means of the sensing device;

determining magnitude of the magnetizing current when the Barkhausen noise starts;

comparing the determined magnitude of the magnetizing current when the Barkhausen noise starts with measured reference values to determine the stress/strain condition of the element; and

outputting a signal representing the determined stress/strain condition of the element.

2. The method according to claim 1 , wherein the exciting/sensing device is arranged in a manner in which it at least partially surrounds the magnetic or magnetizable element.

3. The method according claim 1 , wherein an intermediate element made of a non-magnetized or non-magnetizable material is arranged between the magnetic or magnetizable element and a structure that is to be connected therewith.

4. The method according to claim 1 , wherein:

said continuously rising magnetizing current is pulsed; and

the sensing device detects the Barkhausen noise during off-time of the pulses.

5. The method according to claim 3 , wherein the magnetic or magnetizable element is arranged between a non-magnetic or non-magnetizable fastening element and a structure that is to be connected therewith, before the determination of its stress/strain condition.

6. The method according to claim 5 , wherein the determined magnetizing current at the start of the Barkhausen noise is proportional to the internal stress of the element.

7. A method of measuring stress/strain in a magnetic or magnetizable item, comprising:

applying a continuously increasing magnetic field to said item;

detecting a time of commencement of Barkhausen noise generated in said item in response to said magnetic field;

determining strength of said magnetic field at said time of commencement of Barkhausen noise;

determining stress/strain in said item as a function of the determined strength of the magnetic field at said time of commencement of Barkhausen noise; and

outputting a signal representing the determined stress/strain condition of the element.

8. The method according to claim 7 , wherein said applying step comprises passing a continuously increasing magnetizing current through an exciting device situated in proximity to said item.

9. The method according to claim 8 , wherein said step of determining strength of the magnetic field comprises measuring said magnetizing current at said time of commencement of Barkhausen noise.

10. The method according to claim 9 , wherein said step of determining stress/strain in said item comprises comparing measured magnetizing current with measured reference values for said item.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 4, 2010
From: EADS DEUTSCHLAND GMBH
To: AIRBUS OPERATIONS GMBH
Reel/Frame 024023/0562 →
CHANGE OF NAME Recorded Mar 4, 2010
From: AIRBUS DEUTSCHLAND GMBH
To: AIRBUS OPERATIONS GMBH
Reel/Frame 024023/0633 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 6, 2006
From: ZIMMERMANN, WERNER; HALM, JUERGEN
To: EADS DEUTSCHLAND GMBH; AIRBUS DEUTSCHLAND GMBH
Reel/Frame 017449/0137 →
Priority Claims (1)
DE 102 39 017 · Aug 20, 2002 · national
Continuity (1)
Related Publication 20050248338A1 · Nov 10, 2005