IP Library Granted Patent US 7,622,018
Granted Patent B2
US 7,622,018 · App. 10/544,952 · Granted Nov 24, 2009

Arrangement for and a method of treating pulp, and a method of modernizing a pulp tower

Assignee: Sulzer Pumpen AG
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,622,018
App. No.
10/544,952
Granted
Nov 24, 2009
Kind
B2
Abstract

An arrangement for and a method of treating pulp, and a method of modernizing a pulp tower are disclosed. The arrangement and method relate to treating pulp in connection with high-consistency pulp towers, and especially to means ( 36, 42 ) for diluting pulp arranged substantially at the level of the smallest cross-sectional area between the parting member ( 31 ) and the wall ( 12 ) of the pulp tower ( 10 ).

Claims (16)

1. An arrangement for treating pulp, said arrangement comprising a high-consistency pulp tower ( 10 ) having an upstanding tower wall ( 12 ), a bottom ( 22 ), and a stationary parting member ( 31 , 31 ″) arranged in the tower, said parting member dividing the tower to an upper part and a bottom part ( 20 ), said bottom part defining a so-called dilution zone of said tower ( 10 ), at least one agitator ( 40 ) arranged in the bottom part ( 20 ) for diluting high-consistency pulp, discharge means ( 60 ) for diluted pulp arranged in the bottom part ( 20 ), and said parting member ( 31 , 31 ″) and said wall ( 12 ) of the tower ( 10 ) defining a first cross-sectional flow area, which is smaller than a corresponding cross-sectional flow area below the parting member ( 31 , 31 ″), wherein the arrangement additionally includes means ( 36 , 42 ; 38 , 39 ; 46 ; 48 ) for diluting pulp arranged at a distance from said wall ( 12 ) between said parting member ( 31 , 31 ″) and said wall ( 12 ) of said tower ( 10 ) substantially at the level of said first cross-sectional flow area.

2. The high-consistency pulp tower as recited in claim 1 , wherein said diluting means comprises at least one baffle ( 36 , 36 ′) arranged to extend at least partially from one of said parting member ( 31 , 31 ″) and said tower wall ( 12 ) towards one of said tower wall ( 12 ) and said parting member ( 31 , 31 ″), respectively.

3. The high-consistency pulp tower as recited in claim 1 , wherein said diluting means comprises at least one baffle ( 36 , 36 ′) arranged to extend from said tower wall ( 12 ) to said parting member ( 31 , 31 ″).

4. The high-consistency pulp tower as recited in claim 2 , wherein said diluting means further comprises openings or nozzles ( 42 ) in said baffles ( 36 , 36 ′).

5. The high-consistency pulp tower as recited in claim 1 , wherein said diluting means comprises at least one annular duct ( 46 ) arranged on supporting members ( 36 ) between said parting member ( 31 , 31 ′) and said tower wall ( 12 ).

6. The high-consistency pulp tower as recited in claim 1 , wherein said diluting means comprises nozzles ( 48 ) or openings in said parting member ( 31 ) for feeding dilution liquid to the pulp.

7. The high-consistency pulp tower as recited in claim 1 , wherein said diluting means ( 36 , 42 ; 38 , 39 ; 46 ; 48 ) is connected to means for introducing dilution liquid in said diluting means ( 36 , 42 ; 38 , 39 ; 46 ; 48 ).

8. The high-consistency pulp tower as recited in claim 7 , wherein said dilution liquid introduction means are arranged in connection with one of said wall ( 12 ) of said tower ( 10 ) and said bottom pillar ( 30 ).

9. The high-consistency pulp tower as recited in claim 7 , wherein said dilution liquid introduction means is a dilution header arranged outside said tower.

10. The high-consistency pulp tower as recited in claim 7 , wherein said dilution liquid introduction means is a piping leading to the parting member ( 31 ) via the bottom pillar ( 30 ).

11. The high-consistency pulp tower as recited in claim 1 , wherein said parting member ( 31 ) has been arranged in the top of a so-called bottom pillar ( 30 ), which is arranged to the bottom ( 22 ) of the tower ( 10 ).

12. The high-consistency pulp tower as recited in claim 1 , wherein said at least one agitator ( 40 ) is arranged to generate a circulating pulp flow in the bottom part ( 20 ) of said tower ( 10 ).

13. The high-consistency pulp tower as recited in claim 12 , wherein said agitator ( 40 ) has a shaft positioned substantially horizontally.

14. The high-consistency pulp tower as recited in claim 1 , wherein two to six agitators ( 40 ) are arranged in the dilution zone of the tower ( 10 ).

15. The high-consistency pulp tower as recited in claim 14 , wherein said agitators ( 40 ) are provided with feed means ( 50 ) for introducing dilution liquid into the pulp.

16. The high-consistency pulp tower as recited in claim 1 , wherein the parting member ( 31 ″) is carried by means of baffles ( 36 ′) on the wall ( 12 ) of the tower ( 10 ).

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 22, 2015
From: SULZER PUMPEN AG
To: SULZER MANAGEMENT AG
Reel/Frame 035751/0204 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 6, 2006
From: OTTELIN, JUHA
To: SULZER PUMPEN AG
Reel/Frame 017430/0302 →
Priority Claims (1)
FI 20030209 · Feb 12, 2003 · national
Continuity (1)
Related Publication 20060137839A1 · Jun 29, 2006